PDA

View Full Version : Downtown & City of Ottawa


Pages : [1] 2 3 4 5 6 7 8 9

  1. The Bowery Condos [255 Bay St] | ?m | 17f | Completed
  2. 90 George | 64m | 19 fl | Completed
  3. Performance Court (150 Elgin) | 90.5m | 21 fl | Completed
  4. Shaw Centre (Ottawa Convention Centre) | 30.45m | 4-5 fl | Completed
  5. The Continental | ?m | 15 fl | Completed
  6. The Galleria | 36m | 12 fl | Completed
  7. Telus Ottawa HQ | 8 fl | Completed
  8. Wateridge Village development [Hemlock Rd, Codd's Rd] | U/C
  9. SOHO Italia [500 Preston St] | 96m | 30 fl | Completed
  10. Claridge Plaza I & II | 78m |25 fl| Completed
  11. Mondrian | 73m | 24 fl | Completed
  12. LeBreton Flats | 14 fl (Ph.1)|Completed | 13 fl (Ph.2)|Completed
  13. Hudson Park | 17 fl | Completed (Phase I)| 19 fl | Completed (Phase II)
  14. La Tiffani I&II and Riverpath Retirement| 20-25 fl Complete | 8fl U/C
  15. Les Terrasses Gabrielle | ? | 7 | Construction
  16. Hampton Hotel and Conference Center | ?m | 14 fl | Completed
  17. General Update/Rumour thread
  18. Somerset Gardens | ??m | 11 fl | Completed
  19. The Slater | 66.6 m | 22 fl | Completed
  20. Piccadilly |?m | 6fl |Completed
  21. Westboro Station | ?m | 10fl | Completed (Phase I) | Completed (Ph. 2)
  22. 180 Kent (Minto Place Phase III) | ?m |19 fl | Completed
  23. Desmarais Building | 12 fl | Completed
  24. STRATHCONA-ON-THE-PARK | 12.5 m | 4 FL. | Completed
  25. [Gatineau] Place du Parc - Park Place | ?m | 9 fl | Completed
  26. [Gatineau] Les Jardins Notre-Dame | ? m | 8 fl | Completed
  27. [Gatineau] Kevric Real Estate Corporation | 15 fl | Proposed
  28. Université du Québec en Outaouais UQO
  29. eco-cite on the canal | 5 fl | u/c
  30. Parliamentary Precinct
  31. 265 Laurier | ??m | 18 fl | Proposed
  32. King Street Makeover| Proposed
  33. Canada Science & Technology Museum | Completed
  34. ByWard Parkade | 4fl | Proposed
  35. Le St. Denis | ??m | 3 fl | Completed
  36. Lofts On The Park | ??m | 4 fl | sales
  37. Merrion Square | 10fl, 8 fl, townhomes | Completed
  38. Somerset House [352 Somerset St] | 15m | 4f | Proposed
  39. The Civic District: Imagine the Possibilities!
  40. City of Waterloo's Official Plan
  41. Amica at Westboro Park | 6 fl | Construction
  42. [Gatineau] Domaine des Trembles | 7fl | Completed
  43. Place de Ville III | 76.7m | 18 fl | Proposed
  44. Lansdowne Park Revitalization | N/A | N/A | Proposed
  45. Central (Phase 1-3) | ?m | 9 fl | Completed
  46. Concord-on-the-Canal | 34 m | 10 fl | Proposed
  47. Rethinking the Hespeler Road strip - 2005 Concept Plan
  48. Carleton University Residence (Frontenac) | 6fl | Completed
  49. 1490-1500 Merivale Rd | 10 buildings | up to 34m | 9f-11f | Proposed
  50. Kitchener's Mixed-Use Corridor Strategy
  51. Tribeca | 84.5m | 27 fl x 2 | Completed
  52. Place des Gouverneurs | 17 buildings | U/C
  53. Carleton University Riverside Buildings | ?m | 7 fl | U/C
  54. D/T Gatineau Hotel | Proposed | 130 Rooms
  55. Downtown Advisory Committee
  56. University of Ottawa - Vanier Hall tower | 15 fl | Completed
  57. Canadian Museum of Nature |4fl | Completed
  58. Custom Google Map
  59. 424 Metcalfe/Beaver Barracks Redevelopment | Completed
  60. River Court Lofts | 3fl | U/C
  61. 929 Richmond by Brigil | 70.6m | 20fl | Completed
  62. re Residences [101 Queen St] | 17 fl | Completed
  63. 1000 Place des Gouverneurs
  64. The Galleria II | 42.5 m | 14 fl | Completed
  65. Onyx [287 Lisgar St] | 16f | Completed
  66. Ottawa college puts rare green space up for sale
  67. Z6 Urban Lofts | 15m | 5 fl | Completed
  68. Developing Downtown
  69. "G" | 15 m | 4 fl | Completed
  70. re.THINK re.INVENT re.URBANIZE - October 1, 2008
  71. Structures on Rogers TV - Tuesdays @ 12:30 PM
  72. 2nd Annual University of Waterloo Downtown smARTS Tour - September 20, 2008
  73. EDC | 78.2 m | 19 fl | Completed
  74. Laurentian High School redevelopment | Proposed
  75. Cambridge leads in its heritage plan
  76. This Old Haus: A Place in Time - Book Launch September 28, 2008 1-4pm
  77. Morrison-Draper Redevelopment: 3 towers & lowrise| 46-65m |14-20f | U/C
  78. New Regional Official Plan (ROP)
  79. University of Waterloo master plan workbook
  80. Waterloo Region Growth Strategy
  81. [Gatineau] Le Columbia| 20 fl | Completed
  82. CSIS | ?m | 5fl | Proposed
  83. Local/Laurier Community Discussion
  84. "City of Kitchener ponders growth through 2031"
  85. 3930-3960 Riverside Dr | ?m | up to 17f | Proposed
  86. 263-267 Rochester | 22.1 m | 7 fl | Proposed
  87. The Wellington at Island Park | 18m | 6 fl | U/C
  88. One3One |131-137 Holland Ave | 24.8 m | 8 fl | U/C
  89. 101 Richmond and 111 West | 19.0 m, 24.1 m | 6 fl, 8 fl | Completed
  90. 330 Gilmour St | 23m | 7f | Approved
  91. Rideau-Sussex Redesign/Public Square | Proposed
  92. 900 Albert St | 234/203/105m | 65/56/23fl | Approved
  93. City vision op-ed
  94. Egyptian Embassy | ? m | 3 fl | Proposed
  95. 130 Daly Ave. | 13.2m | 4fl | Proposed
  96. Second Avenue West | ?m | 4fl | Proposed
  97. SOHO Parkway | 15 fl | Completed
  98. Save Kiwanis Park
  99. [Gatineau] - Place du Centre III |18 fl(?)| Proposed
  100. 800 Montreal Road Redevelopment | U/C