harls
Sep 25, 2010, 12:08 PM
Pas à Gatineau, mais..




UN AUTRE GROS PROJET À CHELSEA

Une gare à Chelsea coûterait 3,6 millions de dollars.

Le 21 septembre 2010 - 19:00 | ljacques@rncmedia.ca

Le bâtiment servirait de bougie d'allumage à un projet plus vaste de 34 millions de dollars.

Selon la mairesse de Chelsea Caryl Green, le projet prévoit également une auberge pour 40 personnes, avec des espaces verts, un marché campagnard, des condos et, même, des commerces en dessous des condominiums.

Les unités de logements et les commerces de ce village permettraient de rentabiliser la gare.

À la différence du village de Old Chelsea qui accueille surtout des touristes qui visitent le parc de la Gatineau, le New Chelsea s'adresserait particulièrement à sa communauté.

http://www.tvagatineau.ca/articles/20100921190038/autre_gros_projet_chelsea.html

Edit - Cre47 a plus d'infos ici - http://forum.skyscraperpage.com/showpost.php?p=4988461&postcount=108

Beaver
Oct 7, 2010, 10:52 PM
La Ville de Gatineau sollicite la candidature de citoyennes et de citoyens souhaitant siéger bénévolement au Comité consultatif d’urbanisme (CCU).

http://www.ville.gatineau.qc.ca/upload/publicnotices/20101004_avis_public_ccu.pdf

Citoyen du monde
Oct 13, 2010, 9:53 AM
J'espère que cette maquette n'est pas le plan définitif!

C'est digne des années 60, avec beaucoup trop d'espace entre les bâtiments.

On est dans le centre-ville, câline! Faut que ce soit plus dense que ça, avec des vrais trottoirs, des vraies façades et des coins de rues à angles droits, pas des "croissants".

Non. J'ai posé la même question à Mme Laferrière, et effectivement, ce ne serait qu'une maquette qui donne l'idée centrale de densification résidentielle. Maintenant, le Conseil semble vouloir reculer d'un pas et ça semble se dessiner de la façon dont Paul Duval le décrit ici :

Dossier de l'épicerie sur l'Île-de-Hull: ça ne bouge pas et c'est relié au dossier Guertin. Paul Duval, président de la Coopérative de l'Île-de-Hull a assisté à la soirée d'information du maire Bureau.
Émission : Le Midi Outaouais
Avec : Mathieu Locas
En ligne le vendredi 8 octobre 2010 | Durée : 4:03

Audio :
http://www.souvenirsgarantis.ca/outaouais/in/mathieu-locas-861.html


L'épicerie sur un coin du site actuel de Guertin avec des logements au dessus, et l'aréna... plus autre chose ? à suivre.

reidjr
Oct 13, 2010, 7:31 PM
This is off topic but i just found out about the amigo rec complex i am not sure how old it is.For those that may know do you know if they have any palns for expanding.

Cre47
Oct 14, 2010, 6:50 PM
Peut-etre un cas qui pourrait inspirer Gatineau. Le cas d'une ville deux fois plus petite que Gatineau mais avec un centre-ville qui autrefois etait aussi plate que la notre actuellement et qui devenu X fois plus vibrante que chez nous.

Le K-Rock a fait revivre
Le centre-ville de Kingston

PHILIPPE ORFALI
Le Droit

(Kingston) KINGSTON - Chris Hutchison, le gérant du bar The Toucan, se souvient des soirées tranquilles qui caractérisaient les établissements de la rue Princess, au centre-ville de Kingston, ces dernières années.

« Exception faite du samedi, si on était chanceux, on avait quatre ou cinq groupes qui venaient prendre une, deux bières », dit-il. Mais ça, c'est de l'histoire ancienne.

« Une fois les fonctionnaires et les employés de bureau partis, le centre-ville était tranquille. Pas mort au point où les bars et restaurants songeaient à fermer, mais tu vois ce que je veux dire », explique le barman, en astiquant son comptoir.

C'était avant la construction et l'ouverture du Centre régional de sports et de divertissement de Kingston, ou K-Rock Centre, un aréna multifonctionnel de 5?700 sièges (jusqu'à 6 800, les soirs de concert), construit en plein centre-ville, à quelques centaines de mètres des berges du lac Ontario, et à un jet de pierre des principaux bars, hôtels et attraits touristiques de la ville.

Un aréna de taille moyenne, domicile des Frontenacs de Kingston, pleinement équipé pour recevoir des spectacles d'envergure de même que des présentations plus modestes. Un aréna semblable à ce que rêve de construire le maire de Gatineau Marc Bureau, au croisement des rues Montcalm et Wellington, dans le secteur Hull.

Comme à Gatineau, le projet a connu son lot de détracteurs. « Certains voulaient qu'on rénove et qu'on agrandisse l'aréna Memorial, qui tombait en ruines. D'autres voulaient qu'on aille construire le nouveau stade en banlieue. Mais la seule option viable, c'était un centre multifonctionnel au centre-ville », explique Leonore Foster, conseillère municipale depuis 22 ans et présidente du Groupe de travail sur le K-Rock Centre, formé au lendemain des élections de 2003 par le maire Harvey Rosen afin de sélectionner l'emplacement et le modèle financier adéquat du nouveau complexe.

Elton John, Bob Dylan...

Depuis son inauguration, en février 2008, le Rock est parvenu à attirer nul autre qu'Elton John, Bob Dylan, Leonard Cohen, Jerry Seinfeld et Sheryl Crow, pour n'en nommer que quelques-uns. À la fin du mois, ce sera au tour des Internationaux de Patinage Canada de débarquer dans l'ancienne capitale canadienne.

« Nous sommes en mesure de les convaincre de faire un arrêt entre Ottawa et Toronto et de rivaliser avec de plus grandes villes en raison de la qualité technique des installations », soutient le maire Harvey Rosen.

La plupart du temps, le K-Rock fait salle comble. Certains croyaient que les Frontenacs ne seraient jamais en mesure de remplir l'aréna. Pourtant, on se sert bien rarement des rideaux qui ont été installés pour dissimuler le dernier niveau des estrades, assure Mme?Foster. « Et après la partie, tout ce beau monde se ramasse au centre-ville. »

+20 % en chiffre d'affaires

« C'est ça, l'attrait principal du K-Rock Centre pour Kingston, explique Tim Patter, propriétaire de trois restaurants situés au centre-ville. Plutôt que de repartir directement chez eux après le match, ils viennent manger avant, et sortent prendre un verre après. Notre chiffre d'affaires augmente de 20 %, les soirs d'événements. Et plusieurs d'entre eux décident de revenir par la suite. »

De l'avis du conseiller municipal Ed Smith, la plupart des grands spectacles « rapportent jusqu'à 200 000 $ » en profits pour les bars, restaurants et commerces du centre-ville de Kingston.

« Si j'ai une chose à dire aux élus gatinois, c'est ceci : le K-Rock a été un véritable moteur pour faire revivre le centre-ville, et y attirer un afflux supplémentaire de gens. Rénover notre Memorial de banlieue pour le rendre conforme aux normes du hockey junior majeur n'aurait rien rapporté, et la vie du centre-ville ne s'en serait pas mieux portée. »

Oui, il y a parfois des bouchons de circulation après les matches, reconnaît-il. « Mais la dispersion de terrains de stationnements dans tout le quartier a permis de le réduire au maximum », dit-il.

Les soirées tranquilles ne sont plus aussi fréquentes, au Toucan. « Les soirs d'événements, pas une personne de plus ne pourrait entrer ici ou dans les autres bars du coin, tant on est plein à craquer, assure Chris Hutchison. Si seulement le K-Rock pouvait être ouvert chaque soir...

Inauguré en 2008, le projet de Centre régional de sports et de divertissement de Kingston a coûté 50 millions?$, soit 4,7 millions?$ de plus que prévu aux contribuables. La ville est propriétaire de l'édifice et du terrain, tandis qu'une multinationale spécialisée en gestion d'installations sportives, SMG, s'occupe de gérer l'édifice et d'y attirer des spectacles.

La construction du K-Rock a engendré une dette de 33 millions?$ pour les Kingstoniens. Une somme de 8 millions?$, attendue du gouvernement fédéral, n'est jamais venue, alors que la province a limité sa participation à 4 millions?$. Et seul 1,37 des 2 millions?$ qui devaient être récoltés dans la communauté l'ont été.

En guise de loyer, 10 % de chaque billet de partie des Frontenacs est versé à la Ville. Contrairement à la plupart des municipalités ontariennes ou québécoises comptant une équipe de hockey junior majeur, Gatineau n'exige pas, elle, de loyer aux Olympiques.

Philippe Orfali, LeDroit

Cre47
Oct 18, 2010, 2:15 PM
Publié le 18 octobre 2010 à 00h00 | Mis à jour à 00h00

Nouveau Guertin
Desjardins n'a pas dit son dernier mot



Philippe Orfali
Le Droit

Rénover, rebâtir ou relocaliser : alors que les élus gatinois sont convoqués demain à une réunion « cruciale » pour l'avenir de l'aréna Robert-Guertin, le promoteur Gilles Desjardins revient à la charge et demande que toutes les possibilités soient réévaluées, incluant la sienne.

Dans une publicité qui parait en pages 10 et 11 du Droit de ce matin, le grand patron du Groupe Brigil prend la parole et s'engage à tenir une session d'information publique afin d'expliquer plus en détail son plan pour de centre multifonctionnel, le long de l'autoroute 50.

À son avis, le projet qu'il défend gagne à être pris plus au sérieux par la population, mais surtout par les élus gatinois, le maire Marc Bureau le premier.

« Les gens m'ont posé beaucoup de questions depuis la séance d'information publique tenue le 30 septembre dernier [sur le projet d'aréna au centre-ville]. J'ai eu la chance de présenter mon projet aux élus, je veux maintenant le présenter à la population », dit-il.

C'est que le maire Marc Bureau continue d'exclure le projet présenté par M. Desjardins. Aux yeux du maire, le plan Brigil a le défaut d'être situé hors du centre-ville, de surcroît dans des terrains inondables.

Gilles Desjardins mise donc le tout pour le tout, alors qu'une décision du conseil municipal semble imminente.

« Ma solution est une solution gagnante au problème d'infrastructure sportive, plaide-t-il. Le terrain dont je suis propriétaire est le bon pour ce genre de projet. Il est accessible, il permettrait de garder les coûts de construction à un niveau raisonnable et le stationnement ne poserait pas de problème majeur. »

L'homme d'affaires assure que le caractère inondable du terrain ne constitue par un « élément insurmontable » à la construction d'un centre multifonctionnel.

Le projet Brigil comprendrait un complexe de trois patinoires, un hôtel, un centre de foire et un terrain de soccer synthétique, couvrant au total plus de 122 000 m2 (400 000 pi2).

Mais M. Desjardins se dit « ouvert à toutes les options », se disant même prêt à vendre son terrain à la Ville, à soumettre sa candidature afin de participer à un partenariat public-privé, ou à échanger son terrain avec celui où se trouve l'aréna actuel, dans l'éventualité où la ville serait intéressée par le terrain, mais pas par son projet.

Un choix important

Même si des villes de taille moyenne comme Kingston et London sont parvenues à revitaliser leur centre-ville en y construisant un centre multifonctionnel, M. Desjardins ne cache pas qu'il ne s'agit pas de son option de choix.

« Les coûts de constructions seraient plus élevés, et le stationnement constituerait un problème important. Financièrement, ça soulève des questions », dit-il, estimant que son projet coûterait jusqu'à 50 millions $ moins cher.

« La construction d'un centre multifonctionnel ne peut pas se faire de façon impulsive. Les gens qui sont élus pour gérer nos finances doivent considérer toutes les options », martèle l'homme d'affaires.

reidjr
Oct 20, 2010, 11:54 AM
There seems to be some misinformation in the ottawa area about the new rink.
Ctv news last night they said council voted to delay the project.Yet today the cbc is reporting the project got the approval by one vote.Can some one tell me which one it is.

wingman
Oct 20, 2010, 11:58 AM
There seems to be some misinformation in the ottawa area about the new rink.
Ctv news last night they said council voted to delay the project.Yet today the cbc is reporting the project got the approval by one vote.Can some one tell me which one it is.

XXXX SCRATCH
Looks like it didn't pass (10-9), see below:
XXXX

Looks like it DID pass, see below :koko::
http://www.cyberpresse.ca/le-droit/dossiers/arena-robert-guertin/201010/19/01-4334165-bureau-a-du-trancher.php?utm_categorieinterne=trafficdrivers&utm_contenuinterne=cyberpresse_B4_en-manchette_572_section_POS1

Radster
Oct 20, 2010, 6:17 PM
Actually, it passed 10-9. Read that article and count the votes at the end.

wingman
Oct 21, 2010, 3:25 PM
Actually, it passed 10-9. Read that article and count the votes at the end.

Sorry I misread - you are correct:

"10 voix contre 9 en faveur"

I am sure that is not what the original article said... lol

Acajack
Oct 22, 2010, 8:26 PM
Je ne sais pas si c'est une bonne nouvelle :
http://www.cyberpresse.ca/le-droit/actualites/gatineau-outaouais/201010/21/01-4334891-gatineau-met-fin-au-moratoire-commercial-dans-le-plateau.php?utm_categorieinterne=trafficdrivers&utm_contenuinterne=cyberpresse_B13b_gatineau-et-loutaouais_86608_section_POS1

Radster
Oct 23, 2010, 8:38 PM
J'habite dans le Plateau, et c'est une excellente nouvelle. Le traffic et la congestion sur le coin de Plateau et St-Raymond et horrible, et les résidents du Plateau attendent depuis plusieurs années pour cette nouvelle intersection d'Allummettieres et des Grives.

On attends aussi depuis plusieurs années pour des restaurants dans le Plateau.

Beaver
Oct 24, 2010, 6:56 PM
Et bien, j'ai remarqué qu'une première grue a été installée sur le chantier du 455 de la Carrière.

Beaver
Oct 24, 2010, 7:02 PM
Les travaux à Place Vincent Massey (construction d'une tour de 10 étages) ont été arrétés pour une semaine en raison de fortes vibrations. Les anciens murs du stationnement sous-terrain sont devenus fragile.

Le rez-de-chaussée sera un niveau commercial et les étages supérieurs seront habités par Environnement Canada.

Beaver
Oct 24, 2010, 7:08 PM
Selon une bonne source de Sobeys, la construction du nouveau supermarché IGA Extra au centre commerical de First Capital Realty au coin du Plateau et des Grives c'est pour très bientôt.

harls
Oct 24, 2010, 8:06 PM
Et bien, j'ai remarqué qu'une première grue a été installée sur le chantier du 455 de la Carrière.

Oui, moi aussi.. c'est très visible sur le pont Cartier-Macdonald (ou MacDonald-Cartier pour les gens d'Ottawa :) )

Acajack
Oct 25, 2010, 1:49 PM
J'habite dans le Plateau, et c'est une excellente nouvelle. Le traffic et la congestion sur le coin de Plateau et St-Raymond et horrible, et les résidents du Plateau attendent depuis plusieurs années pour cette nouvelle intersection d'Allummettieres et des Grives.

On attends aussi depuis plusieurs années pour des restaurants dans le Plateau.

Boulevard des Grives - oui

Quelques restaurants familiaux - oui

D'autres commerces d'autres genres qui vont davantage fragiliser St-Joseph et le centre-ville - pas tellement

Acajack
Oct 25, 2010, 8:11 PM
On attends aussi depuis plusieurs années pour des restaurants dans le Plateau.

Apparemment que l'absence de restos vient du fait qu'il n'y a pas assez d'employeurs comme des avocats, médecins, dentistes, concessionnaires automobiles, chiros, CLSC, etc. dans le secteur pour faire rouler un resto pendant l'heure du midi. Les restaurants veulent au moins la possibilité de deux périodes de repas (sur trois) raisonnablement occupés pendant la journée pour assurer leur rentabilité.

Tout le monde a confiance qu'un resto au Plateau serait très occupé en soirée, mais c'est l'heure du midi et le matin les jours de semaine qui sont incertains.

Et si on regarde les autres secteurs de la ville qui ont déjà des restos qui ont un profil démographique comme le Plateau (ou même moins favorable), généralement il y a des emplois de ce genre dans le coin.

Je ne sais pas si le zonage permettant (surtout) plus de grandes surfaces va aider les choses, mais peut-être qu'à un moment donné il va y avoir tellement de grandes surfaces dans le secteur pour assurer une clientèle du midi à des restos.

wingman
Oct 26, 2010, 4:14 PM
Selon une bonne source de Sobeys, la construction du nouveau supermarché IGA Extra au centre commerical de First Capital Realty au coin du Plateau et des Grives c'est pour très bientôt.

Pas une autre épicerie?!

Je m'attendais à une nouvelle Supercenter Wal-Mart, un Canadian Tire et certains Restaurants... EB Games/Game Stop aussi ;-)

J'ai hâte de voir ce qui se construit.

Acajack
Oct 26, 2010, 5:25 PM
Pas une autre épicerie?!

Je m'attendais à une nouvelle Supercenter Wal-Mart, un Canadian Tire et certains Restaurants... EB Games/Game Stop aussi ;-)

J'ai hâte de voir ce qui se construit.

Malheureusement, le Plateau est coincé entre Aylmer et Hull et certains types de commerces qui sont déjà dans ces deux secteurs ne viendront peut-être jamais au Plateau. Canadian Tire est un bon exemple, avec des magasins existants aux Galeries de Hull et à Aylmer.

Mais avec la croissance du Plateau, il va quand même avoir pas mal de choses additionnelles qui vont se construire là, mais peut-être pas autant qu'on en a dans le secteur du boulevard Maloney ouest, par exemple.

Radster
Oct 26, 2010, 8:35 PM
Pas une autre épicerie?!



Effectivement, pas besoin une autre epicerie dans le Plateau, les 2 qui existent c'est assez. Aussi il y a deja une nouvelle IGA plus loin sur le bord d'Allumettieres, dans le secteur Aylmer, et plusieurs a Hull.

A propos les restos, bon argument, mais Allumettieres est devenu une artere importante, alors meme s'il y a pas du monde dans le Plateau pour guarantir assez du clientele pendant toute la journee, il y a surement assez si on considere le monde qui passe en auto et-ou qui s'arrete pour magasiner.

harls
Oct 26, 2010, 11:33 PM
Effectivement, pas besoin une autre epicerie dans le Plateau, les 2 qui existent c'est assez. Aussi il y a deja une nouvelle IGA plus loin sur le bord d'Allumettieres, dans le secteur Aylmer, et plusieurs a Hull.

A propos les restos, bon argument, mais Allumettieres est devenu une artere importante, alors meme s'il y a pas du monde dans le Plateau pour guarantir assez du clientele pendant toute la journee, il y a surement assez si on considere le monde qui passe en auto et-ou qui s'arrete pour magasiner.

Non, c'est pas IGA.. c'est un Metro (coin Wilfrid-Lavigne?) y'a aussi un Desjardins et pharmacie Brunet qui viennent d'ouvrir très bientôt.

En parlant de Canadian Tire, ils veulent construire un nouvelle surcussale sur le coin Vanier et Allumettières, mais la ville ne changera pas le zonage de ce terrain parce que les citoyens ne veulent pas ce genre de 'big box' ici. La proprietère de la Canadian Tire existent s'exprime qu'il veut agrandir, mais il n'y a pas assez place sur le terrain existent...et j'imagine les commerces chez les Galeries d'Aylmer seraient très déçu si le CT fermera un jour..

Pis les restos sur le Plateau.. je pense que les restaurants familiaux genre Kelsey's ou Boston Pizza, qui ouvrent seulement l'après-midi ou même plus tard (genre heure du souper) seraient très populaire.

Peut-être un Cora pour le déjeuner aussi... :)

wingman
Oct 27, 2010, 2:56 AM
En parlant de Canadian Tire, ils veulent construire un nouvelle surcussale sur le coin Vanier et Allumettières, mais la ville ne changera pas le zonage de ce terrain parce que les citoyens ne veulent pas ce genre de 'big box' ici. La proprietère de la Canadian Tire existent s'exprime qu'il veut agrandir, mais il n'y a pas assez place sur le terrain existent...et j'imagine les commerces chez les Galeries d'Aylmer seraient très déçu si le CT fermera un jour..

Pis les restos sur le Plateau.. je pense que les restaurants familiaux genre Kelsey's ou Boston Pizza, qui ouvrent seulement l'après-midi ou même plus tard (genre heure du souper) seraient très populaire.

Peut-être un Cora pour le déjeuner aussi... :)

Pour sûr qu'il y aura un Boston Pizza. Aucun Kelseys que ils ont fermé tous ceux au Québec l'an dernier en faveur d'étapes je crois ...

Ce sont les deux plans du site proposé, intéressant de voir si c'est ce qu'ils ressemblent à la fin:

http://www.firstcapitalrealty.ca/images/Sitemaps/lay201.pdf

Je pense pour le site de First Capital est une BMO dans D et un fast-food dans E. Le IGA s'inscrirait dans H et je ressemble I à ce pourrait être un CT! La «rue principale» semble intéressant et ce serait un endroit idéal pour un DQ, EB Games, etc ..

http://www.trinity-group.com/index.php?q=node/148

A gauche de la Star Cité est censé être le Boston Pizza ... les autres je ne sais pas. Je pouvais voir une Vidéotron Club là-bas, ainsi que 2 restos plus derrière la Star Cité.

Pas sûr qu'ils vont de l'avant avec cette expansion.

Acajack
Oct 27, 2010, 1:52 PM
Pour sûr qu'il y aura un Boston Pizza. Aucun Kelseys que ils ont fermé tous ceux au Québec l'an dernier en faveur d'étapes je crois ...

Ce sont les deux plans du site proposé, intéressant de voir si c'est ce qu'ils ressemblent à la fin:

http://www.firstcapitalrealty.ca/images/Sitemaps/lay201.pdf

Je pense pour le site de First Capital est une BMO dans D et un fast-food dans E. Le IGA s'inscrirait dans H et je ressemble I à ce pourrait être un CT! La «rue principale» semble intéressant et ce serait un endroit idéal pour un DQ, EB Games, etc ..

http://www.trinity-group.com/index.php?q=node/148

A gauche de la Star Cité est censé être le Boston Pizza ... les autres je ne sais pas. Je pouvais voir une Vidéotron Club là-bas, ainsi que 2 restos plus derrière la Star Cité.

Pas sûr qu'ils vont de l'avant avec cette expansion.

Boston Pizza semble probable, surtout qu'il n'y en a pas encore dans Hull et Aylmer.

St-Hubert aussi peut-être? Celui de Hull est assez loin sur Maisonneuve. Mais celui d'Aylmer n'est pas trop loin.

reidjr
Oct 28, 2010, 1:15 PM
What is star city like in terms of what are the ticket prices what type of concession stands are offered etc.

wingman
Oct 28, 2010, 1:58 PM
What is star city like in terms of what are the ticket prices what type of concession stands are offered etc.

It is the same as all the Cineplex theatres (I believe)...

Admission
General (14-64) $10.99
Child (3-13) $8.99
Senior (65+) $8.99
3D General (14-64) $13.99
3D Child (3-13) $11.99
3D Senior (65+) $11.99

It also has the Telus Tuesdays.

As for concessions, there is a Prise1 (dogs, drinks, fries, etc) a Pizza Pizza, a TCYB I think and the regular popcorn and candy stands.

It is very busy Tuesday, Friday and Saturday nights.

Acajack
Oct 28, 2010, 2:16 PM
It is the same as all the Cineplex theatres (I believe)...

Admission
General (14-64) $10.99
Child (3-13) $8.99
Senior (65+) $8.99
3D General (14-64) $13.99
3D Child (3-13) $11.99
3D Senior (65+) $11.99

It also has the Telus Tuesdays.

As for concessions, there is a Prise1 (dogs, drinks, fries, etc) a Pizza Pizza, a TCYB I think and the regular popcorn and candy stands.

It is very busy Tuesday, Friday and Saturday nights.

Physically it is for all intents and purposes a Silver City like the one on Blair. It was built and opened by Famous Players like that but has been through several changes of ownership since then.

A lot of Ottawa teens seem to frequent Star Cité, probably because Quebec movie ratings can sometimes be lower than those in Ontario. (I don't think they are coming over the river to see Québécois and French films! ;) )

wingman
Oct 28, 2010, 6:36 PM
Physically it is for all intents and purposes a Silver City like the one on Blair. It was built and opened by Famous Players like that but has been through several changes of ownership since then.

A lot of Ottawa teens seem to frequent Star Cité, probably because Quebec movie ratings can sometimes be lower than those in Ontario. (I don't think they are coming over the river to see Québécois and French films! ;) )

Hm, yes it should be mentioned that this theatre offers a big selection of both English and French movies - which serves the local population well.
****
Oui il convient de mentionner que ce théâtre offre une grande sélection de films en anglais et en français - qui sert la population locale.

Cre47
Nov 3, 2010, 4:39 PM
Nouveaute chez la STO: Le Plani-Bus

Lancement du Plani-Bus :
Pour des déplacements sur mesure


Gatineau, le mercredi 3 novembre 2010 – La Société de transport de l’Outaouais (STO) a procédé aujourd’hui au lancement d’un planificateur de déplacements : le Plani-Bus.

Ce nouvel outil informatisé propose des itinéraires détaillés et personnalisés pour planifier un déplacement d’un lieu d’origine à un lieu de destination. En quelques clics, le logiciel propose automatiquement différentes alternatives en fonction de préférences exprimées par les usagers. Parfaitement intégré des deux côtés de la rivière, le planificateur de déplacements facilite les déplacements interprovinciaux en combinant l’information des réseaux de la STO et d’OC Transpo.

En plus d'offrir un visuel sur cartographie interactive, le Plani-Bus allie vitesse, exactitude, choix de possibilité de parcours et d’horaire d’autobus, toujours selon les préférences exprimées par les utilisateurs.

« La mise en ligne du planificateur de déplacements témoigne de notre engagement à offrir à l’ensemble des citoyens des services de qualité et une alternative valable à la voiture », a mentionné le président de la STO, Patrice Martin. « Nul doute que cette nouveauté incitera la population à découvrir les services de transport en commun qui s’offrent à proximité de leur résidence ». « Planifier sur mesure ses déplacements en transport collectif n’aura jamais été aussi rapide et facile », a-t-il ajouté.

Depuis les dix dernières années, la STO a enregistré 40 % d’augmentation d’achalandage. Afin de supporter cette croissance et de répondre aux besoins en information de plus en plus importants des usagers, le planificateur de déplacements représente un atout inestimable. Pour faciliter l’usage du Plani-Bus, une vidéo d’aide est intégrée et permet de se familiariser avec l’outil.

Réalisé par la firme québécoise de renommée internationale Giro, ce projet de 350 000 $ a bénéficié d’une aide financière de la Société de financement des infrastructures locales du Québec (Sofil) permettant de couvrir près de 85 % des coûts.

On peut dès aujourd’hui cliquer sur l’icône Plani-Bus logée en page d’accueil du site web de la STO. N’hésitez plus et découvrez comment le planificateur de déplacements simplifie la vie!

- 30 -
Source :

Dominique Leclerc
Conseillère en relations publiques

Cre47
Nov 3, 2010, 4:41 PM
Et un autre restaurant vient de disparaitre recemment, soit le Palais-Grec situe au 729 St-Joseph, soit au beau milieu de la section tres desuete de St-Joseph entre St-Raymond et l'autoroute 5.

Acajack
Nov 3, 2010, 5:17 PM
Je pense que le CEGEP Félix-Leclerc (celui sur La Gappe) s'apprête à commencer la construction d'un CPE/centre de recherche sur la petite enfance. Des piquets orange fluo ont été installés dans le gazon récemment.

À ce sujet, voir la deuxième partie de cet article datant du printemps :

http://www.cyberpresse.ca/le-droit/actualites/gatineau-outaouais/201004/22/01-4273323-nouveau-pavillon-sante-famille-au-cegep.php

harls
Nov 5, 2010, 10:44 AM
Est-ce que quelqu'un a des nouvelles de ces projets du Groupe Heafey?

http://farm5.static.flickr.com/4085/5147791343_857be002c6_b.jpg

http://farm2.static.flickr.com/1187/5147790937_2a208d44d1_b.jpg

http://www.groupeheafey.com/en/projdev.php

Acajack
Nov 5, 2010, 1:30 PM
Est-ce que quelqu'un a des nouvelles de ces projets du Groupe Heafey?

http://farm5.static.flickr.com/4085/5147791343_857be002c6_b.jpg

http://farm2.static.flickr.com/1187/5147790937_2a208d44d1_b.jpg

http://www.groupeheafey.com/en/projdev.php

Je pense que ce ne sont que des propositions. Genre, "on possède ces terrains, et voici ce qu'on pourrait construire dessus". Il n'y a rien de concret là-dedans d'après moi.

Cre47
Nov 5, 2010, 1:50 PM
Étude commandée par Tourisme Outaouais
Un nouveau Palais des congrès pourrait être nécessaire

Justine Mercier
Le Droit

Le Palais des congrès de Gatineau ne suffira peut-être pas, à long terme, à garantir la croissance du tourisme d'affaires dans la région, selon une étude commandée par Tourisme Outaouais. Le rapport de 86 pages du Groupe IBI/DAA portant sur le tourisme d'affaires en Outaouais a été adopté par le conseil d'administration de Tourisme Outaouais hier.

La firme y vante les rénovations en cours au Palais des congrès, dont la présence à court terme « est stratégiquement importante ». Toutefois, malgré les attraits liés à ce nouveau visage du Palais des congrès et la nouvelle approche prise avec l'embauche de personnel pour mousser les ventes, le rapport note que certains défauts majeurs viendront, à plus long terme, freiner les possibilités de croissance.

« [...] À long terme, une nouvelle installation devra être prévue particulièrement si une augmentation de la capacité du Palais des congrès n'est pas possible et que les problèmes d'accessibilité ne peuvent être résolus », peut-on y lire.

Le directeur général de Tourisme Outaouais, Gilles Picard, s'est pour sa part dit confiant de voir le palais reprendre la place qu'il a déjà occupée tout en admettant qu'il fallait « se pencher sur la question ».

« Dans une perspective de plus en plus compétitive, il est certain qu'il faut remettre le centre des congrès au centre de nos priorités [...] Si on veut continuer à croître, il faut continuer à se vendre », indique M. Picard.

Le Groupe IBI/DAA insiste aussi sur l'importance de garder les installations actuelles attrayantes en offrant « continuellement » des cures de rajeunissement au Palais des congrès et en y assurant le maintien d'équipements à la fine pointe de la technologie. Il faudra envisager l'ajout d'hôtels à proximité des lieux où se tiendront réunions et congrès en sol gatinois, souligne aussi le document.

Le manque de signalisation pour indiquer comment se rendre au Palais des congrès est mentionné à quelques reprises dans le rapport d'étude. Des investissements permettant de le « désenclaver » pourraient cependant être intéressants, indique-t-on dans le rapport, en construisant par exemple « une entrée autonome et directe question de lui donner une personnalité propre et de le rendre facilement accessible ».

La reprise des activités au Palais des congrès sera donc cruciale pour assurer un bon développement du tourisme d'affaires en Outaouais, avertit l'étude. « [...] Des efforts particuliers devront être faits pour s'assurer que le service à la clientèle est dorénavant à la hauteur des attentes des clients [...] », est-il écrit.

Pour le directeur général de Tourisme Outaouais, l'accessibilité au centre des congrès est loin d'être « un frein insurmontable » au succès de l'édifice.

« Plusieurs options sont possibles pour régler le problème d'accessibilité à la rue soit l'agrandissement ou encore l'ajout d'infrastructures », mentionne Gilles Picard.

Le Palais des congrès fait présentement l'objet de travaux de 15,3 millions $ qui doivent être complétés d'ici la fin 2010. Le nouveau Centre des congrès d'Ottawa doit pour sa part ouvrir ses portes au printemps 2011, ce qui impose une bonne stratégie pour attirer des événements à Gatineau.

Hôtels

La version préliminaire du rapport obtenue par LeDroit fait également remarquer que le Plan stratégique 2010-2015 de Tourisme Outaouais est ambitieux par rapport aux objectifs du nombre de nuitées découlant des congrès et réunions tenus dans la région. La firme suggère plutôt que « le premier objectif régional devrait être de reprendre la part de marché perdue » en mettant notamment de l'avant une revitalisation d'« un parc hôtelier de moins en moins concurrentiel et de moins en moins conforme aux attentes des clientèles ».

Selon l'étude, Gatineau se classe avantageusement à plusieurs égards lorsqu'elle est comparée avec d'autres villes similaires situées à proximité de grands centres urbains, comme Laval, Lévis, Burlington, Hamilton et Burnaby. Cette étude a été commandée pour établir « un point de départ », a expliqué Gilles Picard, pour « pousser un peu plus loin ce qui avait été fait avec le Plan stratégique ».

Avec Catherine Lamontagne

Cre47
Nov 5, 2010, 1:52 PM
Humm, cela aura ete interessante.

Loto-Québec avait refusé l'idée
Le nouveau Guertin sur le toit du stationnement du Casino ?

Gilles Desjardins est rarement à court d'idées. Il a déjà proposé de construire le nouvel aréna Guertin... sur le stationnement étagé du Casino du Lac-Leamy, à Gatineau.

Le patron de Brigil raconte avoir soumis son idée au directeur général de la maison de jeux, Kevin Taylor, il y a environ deux ans.

« Il était emballé mais après vérification, il s'est avéré que Loto-Québec ne voulait pas être associée à un club de hockey junior », a dit M. Desjardins en entrevue éditoriale au Droit.

Dans les officines de Loto-Québec, il semble qu'on voyait mal un projet mêlant de jeunes hockeyeurs d'âge mineur avec des jeux de hasard et d'argent réservés aux adultes.

Techniquement possible

L'idée lui est venu un matin qu'il se promenait en voiture sur le boulevard de la Carrière. « Et là je me dis : l'aréna devrait aller sur le top du stationnement du Casino. »

D'un point de vue technique, c'était envisageable. « Il y a déjà 2500 places de stationnement en dessous. Et la structure est là. Je suis convaincu qu'avec des études, on peut mettre l'aréna par-dessus le bâtiment actuel. C'est faisable à un coût abordable. »

M. Desjardins est convaincu que son idée aurait avantage à être reconsidérée. « Les matches locaux des Olympiques de Gatineau représentent 38 parties par année, 50 en comptant les séries éliminatoires. Rajoute une centaine de spectacles par année. Toutes les infrastructures sont déjà là. Et le stationnement du Casino n'est pas utilisé à sa pleine capacité. »

Acajack
Nov 5, 2010, 2:04 PM
Humm, cela aura ete interessante.

Loto-Québec avait refusé l'idée
Le nouveau Guertin sur le toit du stationnement du Casino ?

Gilles Desjardins est rarement à court d'idées. Il a déjà proposé de construire le nouvel aréna Guertin... sur le stationnement étagé du Casino du Lac-Leamy, à Gatineau.

Le patron de Brigil raconte avoir soumis son idée au directeur général de la maison de jeux, Kevin Taylor, il y a environ deux ans.

« Il était emballé mais après vérification, il s'est avéré que Loto-Québec ne voulait pas être associée à un club de hockey junior », a dit M. Desjardins en entrevue éditoriale au Droit.

Dans les officines de Loto-Québec, il semble qu'on voyait mal un projet mêlant de jeunes hockeyeurs d'âge mineur avec des jeux de hasard et d'argent réservés aux adultes.

Techniquement possible

L'idée lui est venu un matin qu'il se promenait en voiture sur le boulevard de la Carrière. « Et là je me dis : l'aréna devrait aller sur le top du stationnement du Casino. »

D'un point de vue technique, c'était envisageable. « Il y a déjà 2500 places de stationnement en dessous. Et la structure est là. Je suis convaincu qu'avec des études, on peut mettre l'aréna par-dessus le bâtiment actuel. C'est faisable à un coût abordable. »

M. Desjardins est convaincu que son idée aurait avantage à être reconsidérée. « Les matches locaux des Olympiques de Gatineau représentent 38 parties par année, 50 en comptant les séries éliminatoires. Rajoute une centaine de spectacles par année. Toutes les infrastructures sont déjà là. Et le stationnement du Casino n'est pas utilisé à sa pleine capacité. »

Une CENTAINE de spectacles? Par ANNÉE?

Acajack
Nov 12, 2010, 2:29 PM
Au SmartCentres (maintenant RioCan) sur La Gappe près du Wal-Mart et la 50 :

Le nouveau Winners avance très vite.

Ils ont aussi commencé à préparer le terrain (base de gravier) pour une nouvelle construction pas trop loin du Boston Pizza. Si on regarde le plan du site, ce sera probablement un autre restaurant qui sera construit à cet endroit.

Beaver
Nov 13, 2010, 10:54 AM
Avez-vous remarqué que le resto Amir n'est pas resté longtemps ouvert?

J'y suis allé plusieurs fois à Montréal, mais celui de Gatineau les prix étaient vraiment trop chers. Ma fille et moi sommes allés pour un lunch lors d'une journée pédago 22 $ pour nous deux... il s'agit tout de même un resto-comptoir.

Beaver
Nov 16, 2010, 4:57 AM
Une grue a été installée pour la construction de la tour de 10 étages

reidjr
Nov 16, 2010, 4:31 PM
Is there on a possible new arena aslo how about a conference centre is that likely to happen.

Acajack
Nov 16, 2010, 5:21 PM
Is there on a possible new arena aslo how about a conference centre is that likely to happen.

Odds are against the Brigil project. The mayor is holding firm on the downtown arena plan and some Gatineau reps in Quebec City have begun lobbying Charest and company for cash to fund it.

reidjr
Nov 16, 2010, 5:36 PM
Odds are against the Brigil project. The mayor is holding firm on the downtown arena plan and some Gatineau reps in Quebec City have begun lobbying Charest and company for cash to fund it.

I heard one council a couple weeks ago on ctv not sure who it was but he was aginst the arena beeing downtown.If thats the case some don't want it downtown its much like in ottawa with landsdown live.

Cre47
Nov 16, 2010, 5:44 PM
Is there on a possible new arena aslo how about a conference centre is that likely to happen.

TVA made a report a couple of weeks in regards to the older congress centre at 50 Maisonneuve which had some extensive renovations but mentionned about the small size of the venue. I know the Hilton Lac-Leamy has a conference centre and I think the Holliday Inn at les Terrasses has one as well and probably Chateau Cartier in Aylmer (well probably yes with that G8 Foreign Affairs Meeting last year). I not sure but I think there is none in the Gatineau sector and the Brigil project would have fill in the void.

Several years ago I think during the Yves Ducharme years as mayor there was talk about one not too far from the Casino and the existing Hilton venue. Although not heard much since the past few years.

So yes I think there is the need for one and the argument : "Yes but, there is the new larger Congress Centre in Ottawa" excuse is not valid. Gatineau is big enough too have a decent-size conference centre enough that would attract some significant or larger events. The Hilton one is too small (barely enough for graduation ceremonies) and the current one on Maisonneuve as well.

Acajack
Nov 16, 2010, 5:56 PM
I heard one council a couple weeks ago on ctv not sure who it was but he was aginst the arena beeing downtown.If thats the case some don't want it downtown its much like in ottawa with landsdown live.

There is opposition but it is not of the NIMBY-type like in the Glebe and not necessarily concentrated in the Vieux-Hull downtown district. The downtown councillor is very much in favour of the mayor's arena project for her ward.

Reasons for opposing it downtown range from concerns about the high cost (expropriations, etc.) of putting it downtown, preferences for spending the money on a new library downtown instead, to councillors from the former city of Gatineau in the east end who want it in their area because that is where most of the Olympiques fans live.

Also, some councillors are more pro-car and are concerned about the lack of parking downtown. Others may also be influenced by Mr. Brigil (Gilles Desjardins), who wields a lot of economic power.

Cre47
Nov 16, 2010, 6:59 PM
Is there on a possible new arena aslo how about a conference centre is that likely to happen.

Forgot to, but the next vote has been postponed to after the Christmas Holidays, clearly the mayor has not been able to vow some of the councillors against.

Another delay that will further test Alain Sear's (the Gatineau Olympiques owner) patience.

wingman
Nov 16, 2010, 9:12 PM
Another delay that will further test Alain Sear's (the Gatineau Olympiques owner) patience.

...which is growing VERY thin from what I understand.

Lets not forget, for me the best and probably what may eventually come to pass is to build a new facility in the parking at the current site. To me that is a fantastic location for all of Gatineau, and would be close to the mayors proposed "international sector" along Montcalm. Of course I don't have a vote :rolleyes:

I would share the parking concern. As much as I love transit, I don't think I would be interested in busing to the rink to watch les Olympiques.

Acajack
Nov 17, 2010, 3:12 AM
...which is growing VERY thin from what I understand.

Lets not forget, for me the best and probably what may eventually come to pass is to build a new facility in the parking at the current site. To me that is a fantastic location for all of Gatineau, and would be close to the mayors proposed "international sector" along Montcalm. Of course I don't have a vote :rolleyes:

I would share the parking concern. As much as I love transit, I don't think I would be interested in busing to the rink to watch les Olympiques.

Il y a des milliers de places de stationnement dans le coin Wellington et Montcalm...

wingman
Nov 17, 2010, 3:29 PM
Il y a des milliers de places de stationnement dans le coin Wellington et Montcalm...

Oui, mais c'est là que le maire veut construire les nouvelles installations!
J'aime toujours l'emplacement actuel.

Sur un autre sujet, le Groupe Trinity a mis à jour leur plan de site pour la phase III autour de la Star Cité... nous espérons obtenir quelques informations dès que ce qui se passe là-bas!

Acajack
Nov 17, 2010, 4:14 PM
Oui, mais c'est là que le maire veut construire les nouvelles installations!
J'aime toujours l'emplacement actuel.



Je le sais ça, mais même avec l'élimination de ces places il en resterait encore en masse. On peut les voir sur une vue aérienne du secteur :

http://maps.google.fr/maps?q=%22vieux+hull%22+&hl=fr&ie=UTF8&hq=%22vieux+hull%22&hnear=&ll=45.426995,-75.720896&spn=0.005188,0.013915&t=h&z=17

En passant, je pourrais vivre avec le site actuel aussi, mais rester là ne ferait rien pour revitaliser le centre-ville.

reidjr
Nov 17, 2010, 5:36 PM
When does the holiday break end for council?

Radster
Nov 22, 2010, 7:26 PM
Oui, mais c'est là que le maire veut construire les nouvelles installations!
J'aime toujours l'emplacement actuel.

Sur un autre sujet, le Groupe Trinity a mis à jour leur plan de site pour la phase III autour de la Star Cité... nous espérons obtenir quelques informations dès que ce qui se passe là-bas!


http://www.trinity-group.com/index.php?q=node/148

Ca dit OPENING PHASE III Fall 2010. I guess not! LOL

spotlight
Nov 22, 2010, 8:56 PM
http://www.trinity-group.com/index.php?q=node/148

Ca dit OPENING PHASE III Fall 2010. I guess not! LOL

I'm pretty sure it means opening up for sales/leasing

Radster
Nov 23, 2010, 9:20 PM
erreur, désolé

Radster
Nov 23, 2010, 9:24 PM
Aujourd'hui, j'ai vu qu'il y a une nouvelle grue en arriere de l'edifice Place Vincent Massey (PVM). En attendant pour un autobus la bas, j'ai demandé un commissaire qu'est ce qu'ils batissent en arriere et il m'a dit que ca va etre un edifice un peu moins haut que Place Vincent Massey, mais avec un stationnement sous-terrain, des bureaux, gym etc, et la construction va prendre 2 ans. Il m'a dit que c'est le meme proprietaire que pour le PVM, soi le gars de resto St-Hubert. Il y a pas de photos sur site, mais une pancarte des architectes Landry & DCYSA.

Est-ce qu'il y a quelqu'un ici avec plus d'info sure ce projet?

Anyway, un autre tour a Hull, toujours une bonne nouvelle!:banana:

EDIT: J'ai vu quelques pages en arriere, Beaver a dit que ca va etre un tour de 10 étages :
http://forum.skyscraperpage.com/showpost.php?p=5028743&postcount=1714

Citoyen du monde
Nov 25, 2010, 11:27 AM
Je le sais ça, mais même avec l'élimination de ces places il en resterait encore en masse. On peut les voir sur une vue aérienne du secteur :

http://maps.google.fr/maps?q=%22vieux+hull%22+&hl=fr&ie=UTF8&hq=%22vieux+hull%22&hnear=&ll=45.426995,-75.720896&spn=0.005188,0.013915&t=h&z=17

En passant, je pourrais vivre avec le site actuel aussi, mais rester là ne ferait rien pour revitaliser le centre-ville.
Le maire a une lettre d'entente avec le fédéral pour utiliser les stationnements souterrains à la Place de la Chaudière et Place du Centre, en dehors des heures des fonctionnaires.
En plus de ceux de la ville sous la Maison du Citoyen.

Comme je dis souvent de façon un peut baveuse, le site actuel de la rue Carillon est trop précieux pour un vulgaire aréna seulement. Les 700 logements, en tout ou en partie certifiés LEED, seraient une utilisation plus optimum avec la future épicerie !:)

Citoyen du monde
Nov 25, 2010, 11:49 AM
J’ajoute,
c'est une bonne idée d'effacer le désert de parkings dans le quadrilatère Montcalm/Wellington avec une « attraction » digne d’un centre-ville moderne, juste que je ne suis pas sûr qu'un aréna, aussi multifonctionnel soit-il, soit le meilleur choix pour emplir ce trou d'asphalte.

Ho et pour ceux qui croient que les stationnements demeureront gratuits si l’aréna demeure sur la rue Carillon, il se peut qu’ils se trompent.

De 1, parce que l’épicerie va sûrement aller là de toute façon, et au moins un édifice à logements au dessus.

De 2,
-------
Le Droit :

Le stationnement gratuit en voie d'extinction à Gatineau
(24/11/10) L'ère du stationnement gratuit tire à sa fin à Gatineau. » (http://www.cyberpresse.ca/le-droit/actualites/gatineau-outaouais/201011/23/01-4345701-le-stationnement-gratuit-en-voie-dextinction-a-gatineau.php)

Acajack
Nov 25, 2010, 2:34 PM
J’ajoute,
c'est une bonne idée d'effacer le désert de parkings dans le quadrilatère Montcalm/Wellington avec une « attraction » digne d’un centre-ville moderne,


Que oui!

juste que je ne suis pas sûr qu'un aréna, aussi multifonctionnel soit-il, soit le meilleur choix pour emplir ce trou d'asphalte.


Il va falloir que le centre multi propose autre chose que juste une quarantaine de matchs des Olympiques par année. Va falloir avoir une bonne stratégie pour attirer des spectacles et événements de tous genres. 40 soirs sur 365 (et rien pendant l'été) ce n'est pas ça qui va animer le centre-ville.

Mais c'est faisable.

Citoyen du monde
Nov 26, 2010, 12:35 PM
Que oui!



Il va falloir que le centre multi propose autre chose que juste une quarantaine de matchs des Olympiques par année. Va falloir avoir une bonne stratégie pour attirer des spectacles et événements de tous genres. 40 soirs sur 365 (et rien pendant l'été) ce n'est pas ça qui va animer le centre-ville.

Mais c'est faisable.

En effet, j'ai parlé à Mme Laferrière encore hier, elle confirme que l'activité des Olympiques ne constitue que 13% du temps occupé dans une année. Le conseil semble avoir une étude qui rend des spectacles de 5 000 fans faisable, mais c'est pas clair pour moi pour l'instant. Elle parle d'un centre de foire. en fait, j'sais pas trop ce que ça veut dire.

Mais oui, c'est le temps de proposer d'autres fonctions à ce "multifonctionnel".

Acajack
Nov 26, 2010, 2:27 PM
En effet, j'ai parlé à Mme Laferrière encore hier, elle confirme que l'activité des Olympiques ne constitue que 13% du temps occupé dans une année. Le conseil semble avoir une étude qui rend des spectacles de 5 000 fans faisable, mais c'est pas clair pour moi pour l'instant. Elle parle d'un centre de foire. en fait, j'sais pas trop ce que ça veut dire.

Mais oui, c'est le temps de proposer d'autres fonctions à ce "multifonctionnel".

Je pense que Mme Laferrière faisait allusion à ce rapport :

http://gatineau.ca/docs/accueil/20100630_centre_multifonctionnel/7_rapport_daa_annexes.pdf

Cre47
Nov 26, 2010, 3:09 PM
Projet de transformation en boulevard urbain à quatre voies
L'élargissement du chemin Pink sous la loupe du BAPE

Patrick Duquette
Le Droit

Le projet en vue de transformer le chemin Pink en boulevard urbain à quatre voies, dans le secteur du Plateau, à Gatineau, est sur le point de franchir l'étape du Bureau d'audiences publiques sur l'environnement (BAPE).

L'élargissement du chemin Pink aura des répercussions certaines sur l'environnement. L'emprise du futur boulevard atteindra 55 mètres de large en moyenne et sa route croise plusieurs cours d'eau et milieux humides. Le principal souci demeure l'impact sonore, en raison du nombre grandissant d'automobiles qui l'emprunteront. La Ville de Gatineau a prévu la construction de ponceaux, de bassins, de fossés et de murs antibruit pour atténuer les impacts néfastes.

Tout cela sera au menu d'une réunion d'information organisée par le BAPE, le 15 décembre prochain, au centre communautaire Tétreau. Pour l'instant, le BAPE n'envisage pas la tenue d'une audition publique proprement dite. Mais cela pourrait changer advenant que des individus ou des groupes en fassent la demande. La décision finale reviendrait alors au ministre du Développement durable et de l'Environnement, Pierre Arcand.

« Dans le fond, le 25 novembre, marque le départ du mandat de 45 jours qui est une période de consultation et d'information. Et c'est durant cette période que les gens peuvent faire une demande d'audience publique. C'est là que ça se passe. S'il n'y a pas de demande d'audience publique durant cette période, il n'y aura pas d'audience » résume Louise Bourdages, porte-parole du BAPE.

Depuis hier, l'étude d'évaluation environnementale réalisée par la Ville de Gatineau peut être consultée sur le site Web du BAPE. Du côté de la Ville, on estime avoir fait tout le nécessaire pour traverser avec succès l'étape des approbations environnementales. « On a prévu tout ce qu'on pouvait prévoir », estime Carol Hébert, responsable du dossier au service d'urbanisme.

Ce n'est pas d'hier que la Ville de Gatineau planifie l'élargissement de Pink. Ce chemin rural traverse un quartier en plein essor résidentiel et commercial. Dès 2004, on voyait poindre le jour où il serait saturé de véhicules. Le seuil critique est déjà atteint entre la rue de la Gravité et le boulevard des Grives, un tronçon de 450 mètres qui a été le théâtre d'un accident mortel en 2008.

L'élargissement du chemin Pink serait réalisé en trois étapes. C'est le tronçon critique qui serait complété en premier. Suivrait la construction d'un second tronçon de 2,65 km entre le boulevard des Grives et le chemin Vanier, puis un troisième de 720 m entre le chemin Vanier et le futur boulevard Deschênes. Le coût des deux premières phases était évalué à 17,5 millions $ en 2008.

En gros, le chemin rural actuel deviendrait un véritable boulevard urbain. Les quatre voies de circulation seraient divisées par un terre-plein central. S'ajouteraient aussi un accotement pavé, des feux de circulation, une piste cyclable et des voies de refuge pour les autobus.

harls
Nov 26, 2010, 3:42 PM
un troisième de 720 m entre le chemin Vanier et le futur boulevard Deschênes.

Boulevard Deschênes? C'est quoi ça... l'ancienne trace d'autoroute?

Acajack
Nov 26, 2010, 6:26 PM
un troisième de 720 m entre le chemin Vanier et le futur boulevard Deschênes.

Boulevard Deschênes? C'est quoi ça... l'ancienne trace d'autoroute?

Exactement. Un corridor nord-sud à l'ouest de Grimes, Victor-Beaudry et Norval-Jones.

Cre47
Dec 13, 2010, 7:05 PM
Presentement, il y a l'espace qui etait occupe par Ultramar sur Montcalm with cloture et il y a des travaux d'excavation. Aucune indication sur ce qui va etre construite la pour l'instant. Peut-etre juste un immeuble d'appartments similaire a celle sur le lot a cote ou juste un petit immeuble commercial. Rien d'excitant vraisembablement.

Acajack
Dec 13, 2010, 8:56 PM
Presentement, il y a l'espace qui etait occupe par Ultramar sur Montcalm with cloture et il y a des travaux d'excavation. Aucune indication sur ce qui va etre construite la pour l'instant. Peut-etre juste un immeuble d'appartments similaire a celle sur le lot a cote ou juste un petit immeuble commercial. Rien d'excitant vraisembablement.

Bien, c'est quand même mieux qu'un terrain vacant entouré par des gros blocs de béton laids...

reidjr
Dec 17, 2010, 11:58 PM
Do i have this right there are 3 new gov buildings planned plus the twinning of another one is that correct.

Beaver
Dec 18, 2010, 12:25 PM
Do i have this right there are 3 new gov buildings planned plus the twinning of another one is that correct.


You are right!

- 22 Eddy
- 455 de la Carrière
- 30 Victoria (a crane has been installed on Thursday)

- 351 St-Joseph

harls
Dec 20, 2010, 6:39 PM
When will the crane for 22 Eddy be up, I wonder?

Radster
Dec 20, 2010, 6:53 PM
Also a crane will be up in 2011 for the Cartier-Wellington condo building, so if all goes well, by the summer of 2011, the Hull skyline will have 5 cranes, which is quite impressive!

Bidoup
Dec 22, 2010, 11:22 PM
La ville a annoncé le prolongement du boulevard La Vérendrye Est entre Labrosse et Lorrain.

De plus un voisin m'a dit que la ville a émis un permis pour la construction d'un petite centre commercial et d'une station-service au coin de Lorrain et La Vérendrye Est. C'est tu vrai? On verra bien

Acajack
Dec 24, 2010, 2:30 PM
La ville a annoncé le prolongement du boulevard La Vérendrye Est entre Labrosse et Lorrain.

De plus un voisin m'a dit que la ville a émis un permis pour la construction d'un petite centre commercial et d'une station-service au coin de Lorrain et La Vérendrye Est. C'est tu vrai? On verra bien

Un revenant! Rebienvenue Bidoup!

Merci pour la nouvelle. Ils n'en ont pas parlé beaucoup dans les médias.

gatt
Dec 25, 2010, 6:27 PM
j'ai finalement vu les rendus pour les tours en construction au centre-ville et celle pres du canadian tire.je sais pas trop quoi en passé.il me semble que la grue est pas mal haute pour une petite tour de 10 étages derriere la pvm.

wolfman
Dec 27, 2010, 9:11 AM
Bien hâte de voir les travaux du Rapibus fnir parcontre et surtout de voir comment ils vont am.nager ce fameux tunnel sous Gréber.

Acajack
Jan 7, 2011, 2:22 PM
J'ai remarqué ce matin qu'il y a une affiche "ouverture bientôt" devant le bar de danseuses Le Tabou (fermé?) sur le boulevard Gréber dans Pointe-Gatineau, et qu'on annonce la venue d'un restaurant "souper-spectacle" qui s'appelle Le Médiéval ou La Médiévale.

Je sais qu'il y en a déjà comme ça à Montréal et à Québec...

diablo2003
Jan 9, 2011, 3:36 PM
J'ai remarqué ce matin qu'il y a une affiche "ouverture bientôt" devant le bar de danseuses Le Tabou (fermé?) sur le boulevard Gréber dans Pointe-Gatineau, et qu'on annonce la venue d'un restaurant "souper-spectacle" qui s'appelle Le Médiéval ou La Médiévale.

Je sais qu'il y en a déjà comme ça à Montréal et à Québec...

En fait selon ce que je sais, le Taboo est en bas de l'édifice et le haut était vacant depuis longtemps, donc logiquement ils prendront le haut de l'édifice pour le restaurant en question... Gatineau restera toujours Gatineau, les bars de danseuses resteront toujours lol

diablo2003
Jan 9, 2011, 3:45 PM
Pour ceux qui n'ont pas remarqué, récemment le boulevard de la Cité rejoint la rue Saint-Louis, tout près de la rue Jacques-Cartier... ne manque plus que le court segment entre Saint-René et le boulevard du Carrefour!

Pour le segement sud de De la Cité, ça construit déjà pas mal autour!

Dans les autres nouvelles, la ville a aussi authorisé le changement de zonage de plusieurs endroits pour du développement soit résidentiel ou commercial. Il y a eu la confirmation que le boulevard La Vérendrye serait prolongé jusqu'au boulevard Lorrain, donc on a zoné commercial l'intersection Lorrain/La Vérendrye. On parle déjà de l'arrivée d'un IGA et d'une station-service (p-e déménager le Ultramar/Couche-Tard qui est souvent surchargé par manque de palce juste en face).

On a aussi zoné un segment au bout de Saint-René au sud de Atmec, pour un projet résidentiel qui va s'appeller Carrefour de l'Aviation. Je n'ai pas de détails à savoir combien de maisons, ni à savoir si il y aura une petite portion de commerces de proxomité.

Acajack
Jan 10, 2011, 3:05 AM
Pour ceux qui n'ont pas remarqué, récemment le boulevard de la Cité rejoint la rue Saint-Louis, tout près de la rue Jacques-Cartier... ne manque plus que le court segment entre Saint-René et le boulevard du Carrefour!

.

Plus loin que le chemin de la Savane?

Acajack
Jan 11, 2011, 2:52 PM
En fait selon ce que je sais, le Taboo est en bas de l'édifice et le haut était vacant depuis longtemps, donc logiquement ils prendront le haut de l'édifice pour le restaurant en question... Gatineau restera toujours Gatineau, les bars de danseuses resteront toujours lol

Si oui, ils vont se tirer dans le pied. Beaucoup de gens et des familles n'iraient jamais dans un tel resto s'il y a un club de danseuses si proche....

diablo2003
Jan 11, 2011, 11:04 PM
Plus loin que le chemin de la Savane?

Oui effectivement, il n'y a pas d'aménagement paysager, pas de trottoir non plus, ni lampadaire! Seulement que de l'asphalte, mais oui, plus loin que le chemin de la Savane!

diablo2003
Jan 11, 2011, 11:05 PM
Si oui, ils vont se tirer dans le pied. Beaucoup de gens et des familles n'iraient jamais dans un tel resto s'il y a un club de danseuses si proche....

Ce ne serait pas la première mauvaise idée que nous verrions sur le boulevard Gréber à Gatineau :sly:

diablo2003
Jan 11, 2011, 11:07 PM
La ville a annoncé le prolongement du boulevard La Vérendrye Est entre Labrosse et Lorrain.

De plus un voisin m'a dit que la ville a émis un permis pour la construction d'un petite centre commercial et d'une station-service au coin de Lorrain et La Vérendrye Est. C'est tu vrai? On verra bien

La Ville a modifié le zonage en tous cas! Et on parle beaucoup d'un IGA. On va sans doute voir tout ça en 2012... ou 2084 si le maire Bureau s'en mêle...

Acajack
Jan 12, 2011, 2:30 PM
Ce ne serait pas la première mauvaise idée que nous verrions sur le boulevard Gréber à Gatineau :sly:

J'ai remarqué hier qu'ils avaient installé une affiche illuminée pour Le Médiéval sur l'étage du haut et que l'affiche du Taboo en bas est encore là. Je pensais que le Taboo était fermé mais semble-t-il que non. J'ai même entendu une annonce à la radio pour le Taboo récemment.

En tout cas, je ne vois pas ma mère ou ma belle-mère assister à un souper-spectacle médiéval alors qu'il y a des danseuses juste un étage plus bas.

Ou peut-être visent-ils une autre clientèle avec des spectacles médiévaux à saveur érotique? :haha:

Acajack
Jan 12, 2011, 2:38 PM
Bon, ils ont un site Internet:

http://www.lerestomedieval.com/

Ils ont l'air de vouloir bien faire les choses. J'espère juste que l'emplacement ne leur nuira pas trop, car une initiative de ce genre en Outaouais mérite d'être saluée.

le calmar
Jan 12, 2011, 6:21 PM
^ Le site fait assez low-budget merci.

Acajack
Jan 12, 2011, 7:48 PM
^ Le site fait assez low-budget merci.

En effet. Je ne parlais pas forcément du site mais de l'offre du resto.

Le menu est quand même un cinq services, il y aura des costumes fournis pour les clients, un bal dansant, etc.

Beaver
Jan 13, 2011, 2:48 PM
http://argent.canoe.ca/lca/innovation/quebec/archives/2011/01/20110113-092207.html

re to my previous comments dated Nov 24 (english site Ottawa)

Acajack
Jan 13, 2011, 3:22 PM
http://argent.canoe.ca/lca/innovation/quebec/archives/2011/01/20110113-092207.html

re to my previous comments dated Nov 24 (english site Ottawa)

Ça va être intéressant de voir si ça va entraîner des fermetures à Gatineau. Si j'avais à gager sur celui qui sauterait, ça serait celui de Place Cartier à Hull. Celui d'Aylmer est essentiellement le seul magasin à rayons (même s'il faut le dire vite) d'Aylmer, et celui de Maloney dessert un très grand territoire très peuplé, en plus d'être en plein milieu du coeur commercial numéro un de l'Outaouais. Celui de Hull doit concurrencer les Galeries (avec le Sears) en face, et tout ce qu'il y a au Plateau (incluant un Wal-Mart) pas tellement loin de là.

agl
Jan 13, 2011, 5:43 PM
Projet de transformation en boulevard urbain à quatre voies
L'élargissement du chemin Pink sous la loupe du BAPE

Patrick Duquette
Le Droit

Le projet en vue de transformer le chemin Pink en boulevard urbain à quatre voies, dans le secteur du Plateau, à Gatineau, est sur le point de franchir l'étape du Bureau d'audiences publiques sur l'environnement (BAPE).

L'élargissement du chemin Pink aura des répercussions certaines sur l'environnement. L'emprise du futur boulevard atteindra 55 mètres de large en moyenne et sa route croise plusieurs cours d'eau et milieux humides. Le principal souci demeure l'impact sonore, en raison du nombre grandissant d'automobiles qui l'emprunteront. La Ville de Gatineau a prévu la construction de ponceaux, de bassins, de fossés et de murs antibruit pour atténuer les impacts néfastes.

Tout cela sera au menu d'une réunion d'information organisée par le BAPE, le 15 décembre prochain, au centre communautaire Tétreau. Pour l'instant, le BAPE n'envisage pas la tenue d'une audition publique proprement dite. Mais cela pourrait changer advenant que des individus ou des groupes en fassent la demande. La décision finale reviendrait alors au ministre du Développement durable et de l'Environnement, Pierre Arcand.

« Dans le fond, le 25 novembre, marque le départ du mandat de 45 jours qui est une période de consultation et d'information. Et c'est durant cette période que les gens peuvent faire une demande d'audience publique. C'est là que ça se passe. S'il n'y a pas de demande d'audience publique durant cette période, il n'y aura pas d'audience » résume Louise Bourdages, porte-parole du BAPE.

Depuis hier, l'étude d'évaluation environnementale réalisée par la Ville de Gatineau peut être consultée sur le site Web du BAPE. Du côté de la Ville, on estime avoir fait tout le nécessaire pour traverser avec succès l'étape des approbations environnementales. « On a prévu tout ce qu'on pouvait prévoir », estime Carol Hébert, responsable du dossier au service d'urbanisme.

Ce n'est pas d'hier que la Ville de Gatineau planifie l'élargissement de Pink. Ce chemin rural traverse un quartier en plein essor résidentiel et commercial. Dès 2004, on voyait poindre le jour où il serait saturé de véhicules. Le seuil critique est déjà atteint entre la rue de la Gravité et le boulevard des Grives, un tronçon de 450 mètres qui a été le théâtre d'un accident mortel en 2008.

L'élargissement du chemin Pink serait réalisé en trois étapes. C'est le tronçon critique qui serait complété en premier. Suivrait la construction d'un second tronçon de 2,65 km entre le boulevard des Grives et le chemin Vanier, puis un troisième de 720 m entre le chemin Vanier et le futur boulevard Deschênes. Le coût des deux premières phases était évalué à 17,5 millions $ en 2008.

En gros, le chemin rural actuel deviendrait un véritable boulevard urbain. Les quatre voies de circulation seraient divisées par un terre-plein central. S'ajouteraient aussi un accotement pavé, des feux de circulation, une piste cyclable et des voies de refuge pour les autobus.

A little late on posting, but for those interested I attended the BAPE meeting back in December. The presenters stated the first phase, between Gravité and des Grives, is scheduled for construction between May and November 2012 (meaning 2013 or 2014 perhaps?:)), while the second phase, extending the four lanes to Vanier, would most likely not be required until 2025. The third and last phase, to the Deschênes corridor beyond Vanier, would possibly never be built, as there is not much appetite for putting a road in the corridor, but it was necessary to include all three phases in the planning process, no matter how far along they may be on the time horizon.

There was some criticism over speed limits (70 km/hr for the whole corridor), especially for the area between des Grives and Gravité, as well as issues on how thorough the environmental assessment was conducted.
Since I live off Boulevard d'Europe, my issue was trying to get a planned pedestrian/cycle path alongsige Pink road to des Grives and beyond built before 2025, as the narrow shoulders and lack of adequate lighting on Pink make it treacherous for anyone not in a car on that road. I talked to councillor Alain Riel and he seemed to think the pathway could go in before the road widening and they have "some" money for bike paths. I'll be pushing for it anyway, if you want to see it done as well please let him know.

Thanks,
Andrew

Acajack
Jan 14, 2011, 2:15 PM
Aux nouvelles TVA hier soir, quelqu'un a fait le calcul suivant :

Target achète tous les magasins Zellers au Canada à l'exception d'une soixantaine. On ne mentionne rien au sujet de la soixaintaine qui ne sont pas acquis par Target mais le hasard fait que Zellers a environ 60 magasins au Québec...

reidjr
Jan 18, 2011, 2:23 PM
Is there anything new on the arena.

Acajack
Jan 19, 2011, 2:27 PM
Is there anything new on the arena.

No decision yet. They are going to hire experts to do a study.

http://www.cyberpresse.ca/le-droit/actualites/gatineau-outaouais/201101/18/01-4361372-le-maire-bureau-daccord-avec-un-comite-dexperts.php

wolfman
Jan 23, 2011, 1:22 PM
http://trensquebec.qc.ca/?La_rentabilit%E9



Voici un lien qui semble très interessant et donc la ville de Gatineau et la STO auraient dû aller voir avant de ce lancer dans le projet ridicule de Rapibus.
Surement moins onéreux aurait il été celui ci et moins dommageable pour l environnement sous toutes ces formes et aurait contribuer a construire la nouvelle ville de Gatineau sous de vrais bases écologiques et durables.

wolfman
Jan 24, 2011, 1:58 PM
http://bonnenouvelle.blog.lemonde.fr/files/2010/02/neige.1266338024.JPG

Acajack
Jan 24, 2011, 3:37 PM
Oui effectivement, il n'y a pas d'aménagement paysager, pas de trottoir non plus, ni lampadaire! Seulement que de l'asphalte, mais oui, plus loin que le chemin de la Savane!

J'ai roulé sur cette route récemment et j'ai été surpris par le montant de construction résidentielle dans le coin. Je ne m'en doutais pas mais ça bouge vraiment pas mal.

bobi
Jan 27, 2011, 7:19 AM
http://trensquebec.qc.ca/?La_rentabilit%E9

Voici un lien qui semble très interessant et donc la ville de Gatineau et la STO auraient dû aller voir avant de ce lancer dans le projet ridicule de Rapibus.
Surement moins onéreux aurait il été celui ci et moins dommageable pour l environnement sous toutes ces formes et aurait contribuer a construire la nouvelle ville de Gatineau sous de vrais bases écologiques et durables.

Projet ridicule ? Lien intéressant ? Parce que ? :sly: :shrug:

Cre47
Jan 29, 2011, 3:19 AM
Le rêve de Bureau de construire un écoquartier à côté de l'aréna Guertin se heurte à une clause vieille de 60 ans
Seul « un terrain de jeu » peut être construit là

Patrick Duquette
Le Droit

Les beaux plans du maire Marc Bureau pour redévelopper à des fins résidentielles les terrains de l'aréna Guertin, à Gatineau, sont compromis par l'existence d'un acte de vente vieux de 60 ans.

Les terrains sur lesquels a été construit l'aréna Guertin, en 1957 avaient été cédés 9 ans plus tôt à l'ancienne Cité de Hull par un particulier du nom de François Bilodeau.

Ratifié le 22 juillet 1948, l'acte de vente comportait toutefois une condition : les terrains devaient conserver une vocation récréative et servir « exclusivement pour un terrain de jeu ».

Or, 60 ans plus tard, cette clause est toujours valide. Et elle vient hanter le maire Bureau qui s'est gagné plusieurs appuis en promettant de vendre les terrains actuels de l'aréna Guertin pour les transformer en un écoquartier de 750 logements.

Cette nouvelle vocation souhaitée par le maire et les partisans d'un centre multifonctionnel sur la rue Montcalm est contraire à la clause « terrain de jeu » de l'acte de vente de 1948.

300 000 $ en jeu

Depuis septembre dernier, la Ville de Gatineau transige en secret avec les héritières de François Bilodeau pour faire annuler la clause. En échange, la famille exige une compensation substantielle de près de 300 000 $.

« Les négociations n'avancent pas du tout, regrette Sylvia Bilodeau, l'une des quatre filles de François Bilodeau. La Ville nous dit qu'on demande trop d'argent. Ils nous ont prévenues qu'ils nous enlèveraient les terrains d'une manière ou d'une autre. »

La tournure des événements laisse un goût amer à la famille. Mort en 2002 à l'âge de 99 ans, François Bilodeau était un homme impliqué dans sa communauté. « Mon père était l'homme le plus généreux sur terre. Il organisait des tombolas, des roues de fortune. Et il a offert le terrain de l'aréna Guertin au complet à l'ancienne ville de Hull pour un montant d'un dollar. On aurait dû donner son nom à l'aréna. Je n'ai jamais compris pourquoi on ne l'a pas fait. D'ailleurs, il était bien chum avec Robert Guertin. »

Le conseiller Pierre Philion a appris par hasard l'existence de la fameuse clause. Et hier, le conseiller du district Saint-Raymond/Vanier fulminait au bout du fil. Il a l'impression qu'on a dissimulé des informations aux élus municipaux. « Les membres du conseil municipal n'ont jamais été informés que ce terrain était exclusivement pour un terrain de jeu. Et je ne comprends pas qu'on puisse penser vendre un terrain qu'on ne peut pas donner. Si on veut l'utiliser à d'autres fins (que récréatives), je pense qu'on devra le retourner à la famille. »

Dans la copie de l'acte de vente obtenu par LeDroit, on apprend que François Bilodeau a légué de vastes terrains à partir de la rue Marguerite-Bourgeoys (aujourd'hui disparue) qui longeaient le boulevard Saint-Rédempteur jusqu'au ruisseau de la Brasserie et la rue Carillon.

Quelques décennies plus tard, la fameuse clause « terrain de jeu » incluse à la toute fin du document de deux pages continue d'exercer une influence occulte sur plusieurs transactions conclues dans l'Île de Hull. En 2003, la famille Bilodeau a dû donner son approbation au déménagement du Gîte-Ami sur le site de Guertin, puisque le refuge pour sans-abri ne concordait pas, avec la vocation récréative exigée par François Bilodeau. Une salle du Gîte-Ami porte d'ailleurs son nom. Plus récemment, la famille a exigé, sans succès, des compensations en constatant que des fonctionnaires fédéraux utilisaient le stationnement de Guertin, un usage contraire à la clause « terrain de jeu ».

L'entrepreneur Raymond Brunet a aussi eu vent de la fameuse clause en 2008, alors qu'il négociait alors les termes d'un accord de partenariat public-privé avec la Ville pour l'agrandissement de Guertin. Ironiquement, l'acte de vente de 1948 a été ratifié par son grand-père, lui aussi nommé Raymond Brunet, maire de Hull de 1940 à 1948.

« L'existence de ce document avait été soulevée à l'époque, mais on n'a jamais cherché à l'obtenir. Et puis vous savez, il y a plein de terrains cédés aux institutions publiques lors de décès ». Il a cité l'exemple de la ferme Moore cédée à la CCN, en 1973, par Virginia Moore. Elle aussi a exigé que son terrain serve à des fins de divertissement.

bobi
Feb 1, 2011, 5:40 AM
Burlesque...

Je n'ai pas souvenir d'un projet aussi mal engagé, mal pensé, mal présenté et mal ficelé que celui-ci. Les tribulations du maire Bureau dans ce dossier serviront d'étude de cas aux étudiants qui s'intéressent à tout ce qu'il ne faut pas faire en matière de gouvernance municipale...

Dommage. J'aime bien Bureau et je désire tout autant que lui la revitalisation du centre-ville mais là, il n'en finit plus de creuser son propre trou et de s'y ensevelir de son propre chef.

Cre47
Feb 11, 2011, 3:14 PM
Dossier du nouveau Guertin
Envieux, Gatineau espère que Québec sera encore généreux

ARCHIVES, LeDroit


Patrick Duquette
Le Droit

En consentant 200 millions $ au nouvel amphithéâtre du maire Labeaume à Québec, le gouvernement Charest fait bien des envieux à Gatineau où un projet de centre multifonctionnel monopolise l'attention sur la scène municipale.

Le maire adjoint Joseph De Sylva souhaite que le gouvernement se montrera aussi généreux envers la Ville de Gatineau qu'il ne l'a été avec la Vieille Capitale, une fois que le conseil municipal se sera mis d'accord sur un projet pour remplacer le vétuste centre Robert-Guertin.

« On ne peut que se réjouir de l'annonce d'aujourd'hui parce que Québec donne 200 millions et partage la facture 50-50 avec la Ville de Québec, dit M. De Sylva. Maintenant, on s'attend, à Gatineau, à avoir le même traitement de la part du gouvernement du Québec. »

Responsable des dossiers de sports et loisirs au conseil municipal, M. De Sylva pense que la Ville de Gatineau a de bons arguments pour convaincre Québec d'ouvrir ses goussets. « Nous, on ne demande pas 200 millions. On est quand même la quatrième plus grande ville de la province, avec une population de 260 000 qui représente plus de la moitié de celle de Québec, et on n'a pas de centre multifonctionnel chez nous. On s'attend à ce que nos députés régionaux vont travailler fort pour obtenir des subventions pour nous, à Gatineau, comme les députés de la région de Québec l'ont fait pour Québec. »

Une différence : la popularité

Mais la députée de Hull, Maryse Gaudreault, note une différence notable entre les deux projets : « L'adhésion de la population de Québec pour le projet d'amphithéâtre comparé à l'adhésion de la population de l'Outaouais au projet du maire Bureau, on ne voit pas beaucoup de similarités entre les deux projets... On a toujours souhaité qu'il y ait le même enthousiasme de la population pour un projet à Gatineau, c'est certain. C'est bien plus facile à vendre quand toute une région se mobilise derrière un projet. »

Les enjeux ne sont pas non plus les mêmes à Québec et à Gatineau, nuance le ministre régional, Norm MacMillan : « Il faut comparer des pommes avec des pommes. L'amphithéâtre de Québec, c'est dans la capitale nationale, c'est en marge des Jeux olympiques de 2022, il est question d'un club de la Ligue nationale... On ne bâtira pas quelque chose de 400 millions à Gatineau. C'est à eux de préparer quelque chose, de nous le présenter, et on verra après. »

Joseph De Sylva concède que le projet de centre multifonctionnel est loin de faire l'unanimité à Gatineau. Des conseillers sont même prêts à défaire le projet du maire Bureau dès mardi prochain, lors d'un vote en comité plénier. M. De Sylva leur reproche un « manque d'éthique et de maturité politique ». Comme le maire Bureau, M. De Sylva pense préférable d'attendre un rapport sur les coûts d'expropriation associés au projet Montcalm avant de voter. Il sera bien temps, ensuite, d'informer la population des enjeux. « À Québec, ce qu'on entend, c'est que la population est derrière le projet, tout comme les élus, qui sont unanimes. C'est ce que je nous souhaite. On a entre les mains un projet de centre multifonctionnel et souhaitons qu'on pourra aller chercher nos subventions. Et souhaitons que les collègues du conseil municipal vont se rallier. »

Acajack
Feb 15, 2011, 8:22 PM
Il y des travaux sur l'ancien bâtiment qui abritait le Meule et Caquelon près du Maxi et du Future Shop. Ils en ont refait la forme et agrandi vers la rue, probablement pour un nouveau restaurant.

bobi
Feb 17, 2011, 7:55 AM
Joseph De Sylva rêve en couleur... Les gouvernements provincial et fédéral ne sont pas des guichets automatiques... Le centre multifonctionnel voulu par l'administration Bureau ne verra jamais le jour.

Si la revitalisition du centre-ville compte toujours, vaudrait mieux mieux cibler les priorités.

Pour ma part, j'en vois deux (ou trois) :

Nettoyer, aménager et mettre en valeur le ruisseau de la brasserie pour y accueillir de nouveaux résidents et des amateurs d'activités aquatiques.

Construire la nouvelle bibliothèque sur Montcalm et construire l'espace Dallaire promis depuis des années...

Et j'ajouterai, faire de la Fonderie un marché public...

bobi
Feb 18, 2011, 5:59 AM
Travaux au 188, rue Montcalm. Il semble qu'il recevra un étage de plus.

http://www.gipl.qc.ca/php/slide/getimg.php?f=collection_1/album_1/notaire_contact&t=jpg&w=582&h=239



Forums Directory