paradigm4
Sep 5, 2007, 5:16 AM
Translink recently announced (http://www.surreyleader.com/portals-code/list.cgi?paper=73&cat=23&id=1056334&more=0) that it is soon going to be working on a new 30 year transport plan, and wanted any and all ideas for this future network. Similar to a bit of what was discussed in this other thread (http://forum.skyscraperpage.com/showthread.php?t=123767), I wanted to get everyone's ideas on their ultimate rapid transit network for the new Translink (from Whistler, to Vancouver, to the Valley, to Hope).
If money was no object, and all projects could be completed, what type of routes would you have and where would they be? Would they be SkyTrain, LRT, commuter rail, aerial tram, passenger ferry, etc.?
Go completely blue sky here. Maybe we can come up with a few cool ideas.
EDIT: I'd also like to note that Google Maps (http://maps.google.com/) has a cool "My Maps" function where you can easily mark points and draw lines on maps, and then save the map and link back to it. It would be a great way to visualize any proposed routes.
SpongeG
Sep 5, 2007, 5:26 AM
i think a line from richmond to north burnaby - sort of run along no3 road cross just east of knight street along the fraser river and where willingdon would be along willingdon and than along hastings to SFU maybe ending up at lougheed or something
Canadian Mind
Sep 5, 2007, 5:29 AM
Canada line stations would have the possibility to be extended.
Canada line would loop around richmond and reconnect by the airport.
Skytrain would continue east to abbotsford, then loop around south and re-connect at King George. there would also be another arm that heads north into mission, and then west, crossing the river again along the golden ears bridge to arrive at a future station in langley, and then the line would cross the river once more back into maple ridge, and eventually hook up with evergreen SKYTRAIN line there.
I'd also have a line that runs from metro-town station into south vancouver, ending near a canada line station by the river.
paradigm4
Sep 5, 2007, 6:34 AM
i think a line from richmond to north burnaby - sort of run along no3 road cross just east of knight street along the fraser river and where willingdon would be along willingdon and than along hastings to SFU maybe ending up at lougheed or something
Well, I would think that having the Canada Line down No. 3 Road somewhat negates the purpose of having a line on the same route. Would this run along the Fraser, then head north onto Willingdon? And then past SFU, connect back up with the Millennium Line?
I think a good route would be to run along Hastings (where they plan to put the B-Line), all the way to Willingdon, then turn south and make a final connection with Metrotown. This would be different from the proposed B-Line, which is supposed to just stay on Hastings all the way to SFU.
Frankly, I think that we shouldn't be paying insane amounts of money to make superfluous connections to universities unless they do a cost sharing program (whether this means SkyTrain or an aerial tram to SFU, or underground SkyTrain to UBC).
Anyways, I think the route I mentioned would not only help rejuvenate the DTES, but also provide Northeast Van, the PNE, and BCIT with rapid transit, while making a vital cross through between North and South Burnaby.
twoNeurons
Sep 5, 2007, 8:46 PM
Maps! We need Maps people!
SpongeG
Sep 5, 2007, 10:07 PM
Well, I would think that having the Canada Line down No. 3 Road somewhat negates the purpose of having a line on the same route. Would this run along the Fraser, then head north onto Willingdon? And then past SFU, connect back up with the Millennium Line?
I think a good route would be to run along Hastings (where they plan to put the B-Line), all the way to Willingdon, then turn south and make a final connection with Metrotown. This would be different from the proposed B-Line, which is supposed to just stay on Hastings all the way to SFU.
Frankly, I think that we shouldn't be paying insane amounts of money to make superfluous connections to universities unless they do a cost sharing program (whether this means SkyTrain or an aerial tram to SFU, or underground SkyTrain to UBC).
Anyways, I think the route I mentioned would not only help rejuvenate the DTES, but also provide Northeast Van, the PNE, and BCIT with rapid transit, while making a vital cross through between North and South Burnaby.
i don't know why i said no3 road - i meant the road that goes by IKEA - is it bridgeport? Richmond roads confuse the hell out of me
SpongeG
Sep 5, 2007, 10:29 PM
ok this map was really bad and was really old so its a rough idea of where
http://img.photobucket.com/albums/v62/spongeg/mappy.jpg
Canadian Mind
Sep 11, 2007, 12:08 AM
I made this map using google earth. I resized it to make it smaller, but then the clarity when all FUBARed. It's still better than the above map for planning out routes, as it includes all of the lower mainland from Horseshoe Bay to Chillowack and the US border. It's still big, but meh
http://i127.photobucket.com/albums/p123/Canadian_Mind/VancouverTransit.jpg
SpongeG
Sep 15, 2007, 8:09 AM
i was driving to surrey the other day and thought they really need a new bridge between new west and surrey - it could contain street car for say a route between scott road and lougheed perhaps or a new heavy rail crossing since the old one is so old and inefficient
it would help relieve patullo bridge traffic and the port mann with hwy 1 acess via brunette and provide a quicker route from north delta etc to north vancouver
http://img.photobucket.com/albums/v62/spongeg/newwestnewbridge.jpg
East Van
Sep 15, 2007, 4:39 PM
it would be interesting to see google maps like the one above with montreal and toronto at the same scale...
paradigm4
Sep 17, 2007, 4:25 AM
Well, I've got my ideas together. Here's a quick teaser:
http://i2.photobucket.com/albums/y18/yoda_four/translink.jpg
Canadian Mind
Sep 17, 2007, 4:32 AM
it would be interesting to see google maps like the one above with montreal and toronto at the same scale...
I'll take the hint and post the results in the Canada section later. I'll put them at the actual scale though, so the pics will be f*cking huge. :D
mr.x
Sep 17, 2007, 4:33 AM
Well, I've got my ideas together. Here's a quick teaser:
http://i2.photobucket.com/albums/y18/yoda_four/translink.jpg
*cries* that's the rapid transit network i've always dreamed of!
Canadian Mind
Sep 17, 2007, 4:39 AM
and the kind Vancouver needs.
Heh, once you get the thing done, think you could overlay the routes onto the map I provided (or a better one once it is built) so we can see exactly where they run in relation to roadways.
SFUVancouver
Sep 17, 2007, 7:32 AM
(I originally posted this in SSC under my other pseudonym "Vancouverite")
I've used LRT as a placeholder for all the proposed alignments and I'm not married to that technology. I also don't have very much in Richmond or Surrey since I don't know these municipalities well. If you have any feedback I'd love to hear it.
http://img408.imageshack.us/img408/1922/blueskytransitmaprq3.jpg (http://img403.imageshack.us/my.php?image=blueskytransitmapmh4.jpg)
Thanks to imageshack.us
[edit] just realized I forgot to include the White Rock alignment in the legend. It would originate at Guildford Town Centre travel south on 152nd St in Surrey and have a terminus in White Rock.
The Northeast Connector, Northwest Connector, and the White Rock alignment could all also originate at Surrey City Centre.
I've also had the suggestion that the Boundary alignment should be along Willingdon and I will make this change since I think it has a lot going for it. I also intend to reroute the "Northeast" and Northwest" connectors to originate in Surrey City Centre/Whalley and then go through Guildford.
paradigm4
Sep 17, 2007, 8:48 AM
I just wanted everyone's opinion on one thing:
On my plan, the light blue line, which goes from Scott Road, thru Surrey to Langley, then north along 200th.... The line could either go back west and connect with the Surrey-Coquitlam pink line at Guildford, or it could cross the Golden Ears Bridge and go back northwest to connect at Coquitlam Centre.
In my plan, I chose the route in Surrey instead of across the bridge. This is because, even by going across the bridge, you don't end up hitting Maple Ridge town centre, you basically bypass it. And there's not much point of making a sharp right and loop around Maple Ridge.. I mean, it's already going to be serviced by West Coast Express anyways. And since the line is bypassing Maple Ridge, and just going through Pitt Meadows... well you get my point.
And, by going thru Surrey, you could make a stop in Port Kells, which would probably bring in just as many people as Pitt Meadows, if not more.
Does everyone agree with this point-of-view?
SpongeG
Sep 18, 2007, 1:25 AM
yeah Maple Ridge could use feeer bsuses to pitt meadows
port kells would be good - what about walnut grove? that area is nuts with growth
paradigm4
Sep 18, 2007, 2:37 AM
yeah Maple Ridge could use feeer bsuses to pitt meadows
port kells would be good - what about walnut grove? that area is nuts with growth
Ya, it would go right into Walnut Grove before heading northwest thru Port Kells. It would also go through Willoughby, which is the area along 200th St, between Willowbrook and Walnut Grove. Willoughby is seeing crazy development - just literally throwing townhomes and industrial buildings on top of the old huge farming residences.
fever
Sep 18, 2007, 5:51 AM
here's my stab at it...
http://members.shaw.ca/mikef0001/network.png
It focuses on a streetcar network along the most developed commercial strips outside downtown Vancouver, my choices for handling future growth, and also existing rail lines in Metro Vancouver. It also aims to connect as many industrial parks as possible to the rapid transit network. The biggest omission is probably SFU and Hastings. The Central Valley line (parallel to the M Line) would have to be very fast or built as part of an upgrade for Amtrak to be worthwhile.
paradigm4
Sep 18, 2007, 10:26 PM
here's my stab at it...
http://members.shaw.ca/mikef0001/network.png
It focuses on a streetcar network along the most developed commercial strips outside downtown Vancouver, my choices for handling future growth, and also existing rail lines in Metro Vancouver. It also aims to connect as many industrial parks as possible to the rapid transit network. The biggest omission is probably SFU and Hastings. The Central Valley line (parallel to the M Line) would have to be very fast or built as part of an upgrade for Amtrak to be worthwhile.
I strongly believe that having a Vancouver-only mentality will be ultimately detrimental to the whole region. You already see it happening in the south of Fraser region - the suburbs will keep expanding, no matter what's happening elsewhere. So you can either learn to help the suburbs shape their growth, or you can let them pave over everything. That's why I do not agree with "Vancouver handling future growth".
Not to mention the ridiculous housing prices out there. In our region's market, people pay for livability. That's what it comes down to. Downtown is the most livable, the rest of Vancouver second, and then major centres along the SkyTrain third, usually. The problem here is, most places outside of Vancouver are not nearly as livable, and so the prices there are cheaper. If the whole region was as livable as downtown, you'd see a balancing act - the suburbs would become more expensive, but as more supply filled the market, downtown would become cheaper and more accessible to people. It's all about supply and demand.
I'm also not too keen on spending money to build lines parallel to the existing SkyTrain, especially considering how much the SkyTrain cost.
fever
Sep 19, 2007, 1:38 AM
I strongly believe that having a Vancouver-only mentality will be ultimately detrimental to the whole region. You already see it happening in the south of Fraser region - the suburbs will keep expanding, no matter what's happening elsewhere. So you can either learn to help the suburbs shape their growth, or you can let them pave over everything. That's why I do not agree with "Vancouver handling future growth".
I should have been more specific: my choices for handling spillover growth from downtown Vancouver as opposed to other parts of the City, like South Vancouver. Of course, one of the objectives driving rapid transit is handling future growth in the suburbs. Aside from the relatively inexpensive streetcar lines (on a per distance basis), the M-Line West extension, and the 41st Ave line, the map proposes rapid transit lines in municipalities other than Vancouver. It even has Evergreen as an M-Line East extension.
lightrail
Oct 13, 2007, 6:07 PM
Here's mine (sorry no diagrammes)
Skytrain
- Extend Skytrain west from VVC/Clark to UBC
- Extend Expo line south to White Rock Centre
- New branch on Expo line to Guildford, Fleetwood, Willowbrook and Langley
- Evergreen line built as Skytrain to Coquitlam Centre
- Extend Canada Line south to Steveston Highway
- new station on Existing Skytrain Line between Broadway and Main Street, located close to and connected to the VCC/Clark Station on the Millenium line to provide new connection/transfer and to reduce stress on Broadway/Commercial Station and provide access to the Railway Lands (about 170 metres separate the line and VVC/Clark Station) - would need to be integrated into a new development.
- replace all Mark I cars with Mark II - increase length of all Mark II trains to platform length using "B" units (cab driving car +B trailer + B trailer + cab driving car) = 72m trains on 80 m platforms.
Seabus
- new seabus route between Waterfront and Park Royal
- expand existing route to 10 min frequency
Commuter Rail
- extend WCE with more trains during the day, expand TrainBus daytime and weekends
- new Trainbus connects with trains at Mission serving Abbotsford and Chilliack
- new stations in Burnaby to provide access to business and universities (with connecting buses)
- New Howe Sound Express - commuter train from Squamish to North Vancouver with station at Park Royal (connected to new Seabus route) with trips to and from Whistler
Trolley Network
- expand trolley network with new operations centre in Burnaby, electrification of major routes in Vancouver and Burnaby (25, 35, 41, 49, 50, 130, 106, 112) and others.
Rapid Bus Network
- new rapid buses along 41st Avenue, Hastings, Lougheed Highway to Maple Ridge, east-west on the North Shore, Richmond to the ferry terminal
Regional Bus Services
- extension of highway coach buses from Langley Skytrain to Abbotsford, Chilliwack and Hope
Night Buses
- extend all night buses to run all night
- expand nightbus network to provide links to White Rock, Langley, and more coverage in Burnaby, New Westminster and Vancouver
Streetcars
- new streetcar line from Marine Drive Skytrain Station to downtown Vancouver via Arbutus corridor - then on street running from Main Street Skytrain Station along Pacific blvd to Stanley Park
- Streetcar line from Stanley Park via Waterfront Station, Cordova back to Main Street Skytrain Station
- streetcars would also serve Granville Island and dense built up areas of Vancouver, and a commuter run for areas in the west side of Vancouver - Kerrisdale and Marpole
That's it - trying to be practical. Now who pays for all of this?
officedweller
Oct 16, 2007, 9:20 PM
Skytrain
- new station on Existing Skytrain Line between Broadway and Main Street, located close to and connected to the VCC/Clark Station on the Millenium line to provide new connection/transfer and to reduce stress on Broadway/Commercial Station and provide access to the Railway Lands (about 170 metres separate the line and VVC/Clark Station) - would need to be integrated into a new development.
- replace all Mark I cars with Mark II - increase length of all Mark II trains to platform length using "B" units (cab driving car +B trailer + B trailer + cab driving car) = 72m trains on 80 m platforms.
I've always thought an addition station on Terminal (near Home Depot rather than Clark) would be useful to push the area along. The only straight section of track above the escarpment would be along Grandview North east of Clark Drive - abit far from VCC-Clark.
BTW - the intermediate Skytrain cars are called "C" cars - the cab cars are "A" & "B" cars.
vBulletin® v3.8.7, Copyright ©2000-2013, vBulletin Solutions, Inc.