PDA

You are viewing a trimmed-down version of the SkyscraperPage.com discussion forum.  For the full version follow the link below.

View Full Version : Compilation Thread



Pages : [1] 2 3

Dmajackson
Jul 10, 2008, 5:45 PM
HALIFAX DEVELOPMENT COMPILATION LIST

http://farm9.staticflickr.com/8030/7984679279_0143290013.jpg http://farm9.staticflickr.com/8174/7984679073_fd64be5550.jpg http://farm9.staticflickr.com/8442/7984685604_e7e59d63d9.jpg

(all photos property of Dmajackson)

50

HOW TO READ THIS LIST:

RED (Red) - Proposed/Planned
ORANGE (Orange) - Approved/In Sales/Site Prep/Recently Approved
GREEN (Green) - Under Construction (Construction Permit to First Occupancy)
BLUE (Blue) - Recently Completed (Stays in this category for six months following completion of construction)
PURPLE (Purple) - Rejected/Abandoned/Outdated/Expired (Stays in this category for six months following announcement date)

Com - Complete
DA - Development Agreement
Dem - Demolition
DRC - Design Review Committee
HECC - Harbour East Community Council
NWCC - Northwest Community Council
PCC - Peninsula Community Council
PH - Public Hearing
PIM - Public Information Meeting
RC - Regional Council
UC - Under Construction

- With a known height: Height (m) -> Floors -> Name ; Without a known height: Floors -> Name
- Blank spaces (_) and asterisks (*) indicate not applicable or unknown
- Asterisks (*) are also used as place holders (to keep projects lined up)

50

1. HALIFAX - PENINSULA:
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS) | STATUS | MORE INFORMATION
01. | 106m | 34 floors | 17458 (http://www.halifax.ca/planning/Case17458Details.html) | Fenwick Place Expansion @ Recladding (5599 Fenwick Street) (http://forum.skyscraperpage.com/showthread.php?t=175869) | Approved | UC - 12.12
02. | *80m | 23 floors | 17186 (http://halifax.ca/boardscom/drc/documents/TDReport.pdf) | TD Tower Expansion (1791 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=177100) | Under Construction | Frame
03. | ***m | 22 floors | ***** | International Place (____ Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=153694) | Approved | Unknown
04. | ***m | 20 floors | ***** | Carleton Tower @ Dalhousie (5849 University Avenue) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=87) | Proposed | Com - 2020
04. | ***m | 20 floors | ***** | Gottingen Street Staples Redevelopment (2003 Gottingen Street) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=66) | Proposed | Unknown
04. | ***m | 20 floors | ***** | Tupper Link Replacement @ Dalhousie (5849 University Avenue) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=87) | Proposed | Com - 2020
07. | *76m | 18 floors | 01172 (http://www.halifax.ca/boardscom/Dist12PAC/documents/RoyBuildingReport.pdf) | Roy Building Redevelopment (1647 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=153784) | Approved | Unknown
08. | *73m | 21 floors | 00971 (http://www.halifax.ca/boardscom/Dist12PAC/documents/080428d12pac3.pdf) | Alexander, The (1496 Lower Water Street) (http://forum.skyscraperpage.com/showthread.php?t=139698) | Approved | Unknown
09. | *66m | 21 floors | ***** (http://www.halifax.ca/boardscom/drc/documents/121108drc000.PDF) | Bank of Canada Redevelopment (1583 Hollis Street) (http://forum.skyscraperpage.com/showthread.php?t=202161) | Proposed | UC - 2013
10. | *64m | 18 floors | ***** | Nova Centre East Tower I (____ Grafton Street) (http://forum.skyscraperpage.com/showthread.php?t=148136) | Approved | Excavation, Com - 2016 (http://www.novacentre.ca/)
10. | *64m | 18 floors | ***** | Nova Centre East Tower II (____ Grafton Street) (http://forum.skyscraperpage.com/showthread.php?t=148136) | Approved | Excavation, Com - 2016 (http://www.novacentre.ca/)
12. | *62m | 19 floors | 17456 (http://www.halifax.ca/planning/Case17456Details.html) | Robie Street, 3065 (3065 Robie Street) (http://forum.skyscraperpage.com/showthread.php?t=197052) | Proposed | DA Underway
13. | *54m | 17 floors | 17256 (http://www.halifax.ca/Commcoun/pcc/documents/YoungSuppRpt.pdf) | Young Street Tower I (6100 Young Street) (http://forum.skyscraperpage.com/showthread.php?t=194149) | Approved | October 2012 (http://www.wmapartments.ca/6100youngstreet.html)
13. | *54m | 17 floors | 17256 (http://www.halifax.ca/Commcoun/pcc/documents/YoungSuppRpt.pdf) | Young Street Tower II (1011 Monaghan Street) (http://forum.skyscraperpage.com/showthread.php?t=194149) | Approved | October 2012 (http://www.wmapartments.ca/6100youngstreet.html)
15. | *52m | 14 floors | ***** | Nova Centre West Tower (____ Grafton Street) (http://forum.skyscraperpage.com/showthread.php?t=148136) | Approved | Excavation, Com - 2016 (http://www.novacentre.ca/)
16. | *50m | 15 floors | 01231 (http://www.halifax.ca/boardscom/hac/documents/Case01231.pdf) | Zellers Building Redevelopment (1595 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=165187) | Approved | UC - 2014
17. | *49m | 17 floors | 17442 (http://www.halifax.ca/boardscom/drc/documents/120119drc71.pdf) | Citadel Hotel Apartment (1920 Brunswick Street) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=136) | Under Construction | Com - 14.06, Frame (http://www.citadelhalifax.com/)
17. | *49m | 15 floors | 17793 (http://www.halifax.ca/boardscom/drc/documents/Citadel120809.pdf) | Citadel Hotel North Tower (1960 Brunswick Street) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=136) | Under Construction | Com - 14.06, Frame (http://www.citadelhalifax.com/)
17. | *49m | 15 floors | 17793 (http://www.halifax.ca/boardscom/drc/documents/Citadel120809.pdf) | Citadel Hotel South Tower (1960 Brunswick Street) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=136) | Under Construction | Com - 14.06, Frame (http://www.citadelhalifax.com/)
17. | *49m | 17 floors | 16655 (http://www.halifax.ca/planning/Case16655Details.html) | YMCA/CBC Redevelopment I (1565 South Park Street) (http://forum.skyscraperpage.com/showthread.php?t=181451) | Approved | Developer Selection (http://newhalifaxymca.ca/)
17. | *49m | 13 floors | 16655 (http://www.halifax.ca/planning/Case16655Details.html) | YMCA/CBC Redevelopment II (1600 Sackville Street) (http://forum.skyscraperpage.com/showthread.php?t=181451) | Approved | Developer Selection (http://newhalifaxymca.ca/)
22. | ***m | 16 floors | ***** | Cunard Block (1325 Lower Water Street) (http://forum.skyscraperpage.com/showthread.php?t=196109) | Proposed | WDCL Negiotiations, Under Construction - April 2014, Complete - 2016
22. | ***m | 16 floors | ***** | Portland Place Tower (____ Portland Place) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=58) | Proposed | Unknown
24. | ***m | 15 floors | ***** | Brunswick Place Redevelopment (____ Brunswick Street) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=59) | Proposed | Unknown
25. | ***m | 14 floors | ***** | Robie Street, 2859 (2859 Robie Street) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=159) | Proposed | Unknown
26. | *40m | 13 floors | 01302 (http://www.halifax.ca/commcoun/ccc/documents/101004ccc1011.pdf) | Saint Lawrence Place Apartments (3473 Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=175890) | Under Construction | Frame, Exterior (http://wmfaresproperties.com/index.php?option=com_fwrealestate&view=item&id=3:joseph-howe-drive-halifax&Itemid=90)
27. | ***m | 13 floors | ***** | Young Street @ Windsor Street I (? Young Street) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=64) | Proposed | Unknown
28. | ***m | 10 floors | ***** | Diamonds Bar Redevelopment (2215 Gottingen Street) (http://forum.skyscraperpage.com/showthread.php?t=197993) | Proposed | Unknown (http://www.housingtrust.ca/projects/diamonds-bar/)
28. | ***m | 10 floors | ***** | Barrington@Devonshire (3090 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=200300) | Proposed | Unknown
28. | ***m | 10 floors | ***** | Glidden Paint Redevelopment (____ Kaye Street) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=58) | Proposed | UC - 2014-2015
28. | ***m | 10 floors | ***** | MET Redevelopment (2183 Gottingen Street) (http://forum.skyscraperpage.com/showthread.php?t=180937) | Proposed | Unknown
28. | ***m | 10 floors | ***** | Mills Brothers Redevelopment (5476 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=197) | Abandoned | March 2013
28. | ***m | 10 floors | ***** | Mills Brothers Redevelopment II (5476 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=197) | Project Redesign | December 2012
34. | *34m | *9 floors | 01114 (http://www.halifax.ca/boardscom/hac/documents/Item71HAC.pdf) | RBC Waterside Centre (1860 Upper Water Street) (http://forum.skyscraperpage.com/showthread.php?t=144928) | Under Construction | Frame, Exterior (http://www.hpwatersidecentre.ca/)
35. | *30m | 10 floors | 17458 (http://www.halifax.ca/planning/Case17458Details.html) | South Street Tower @ Fenwick Place (5599 Fenwick Street) (http://forum.skyscraperpage.com/showthread.php?t=175869) | Approved | UC - 12.12
36. | *28m | *9 floors | 18006 (http://www.halifax.ca/boardscom/drc/documents/Case18006Sept132012.pdf) | Mary-Ann, The (1457 Birmingham Street) (http://forum.skyscraperpage.com/showthread.php?t=188401) | Approved | Excavation, UC - 13.06 (http://bancgroup.ca/properties/item/the-mary-anne)
37. | *27m | *5 floors | ***** | Halifax Central Library (5440 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=141212) | Under Construction | Complete - 2014, Frame, Exterior (http://halifaxcentrallibrary.ca/)
37. | *27m | *8 floors | 17195 (http://www.halifax.ca/planning/Case17195Details.html) | Quinpool & Vernon (6112 Quinpool Road) (http://forum.skyscraperpage.com/showthread.php?t=201358) | Proposed | DA Underway
37. | *27m | *9 floors | 01325 (http://www.halifax.ca/commcoun/pcc/documents/case01325.pdf) | St. Joseph's Square (5454 Kaye Street) (http://forum.skyscraperpage.com/showthread.php?t=168972) | Approved | Website (http://stjosephssquare.com/)
40. | ***m | *9 floors | ***** | Margaretta, The (____ Clyde Street) (http://forum.skyscraperpage.com/showthread.php?t=188401) | Proposed | UC - 13.06
41. | *26m | *8 floors | 18254 (http://www.halifax.ca/planning/Case18254Details.html) | Gottingen & Bloomfield (2778 Gottingen Street) (http://forum.skyscraperpage.com/showthread.php?t=203047) | Proposed | DA Underway
42. | *25m | *8 floors | 17458 (http://www.halifax.ca/planning/Case17458Details.html) | West Tower @ Fenwick Place (5599 Fenwick Street) (http://forum.skyscraperpage.com/showthread.php?t=175869) | Approved | UC - 12.12
43. | ***m | *8 floors | ***** | Shannex Parkland @ The Gardens (5732 College Street) (http://forum.skyscraperpage.com/showthread.php?t=181446) | Recently Completed | December 2012 (http://parklandatthegardens.com/)
44. | *23m | *7 floors | 16417 (http://halifax.ca/planning/Case16417Details.html) | Spirit Place (2570 Windsor Street) (http://forum.skyscraperpage.com/showthread.php?t=182433) | Proposed | DA Underway (http://spiritplace.ca/)
45. | *22m | *7 floors | 17756 (http://www.halifax.ca/planning/Case17756Details.html) | Almon @ Isleville (2814 Isleville Street) (http://forum.skyscraperpage.com/showthread.php?t=200743) | Proposed | DA Underway
45. | *22m | *6 floors | 16655 (http://www.halifax.ca/boardscom/drc/documents/7.1DRCMarch8.pdf) | CD Plus Redevelopment (1592 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=196984) | Approved | Demolition (http://www.starfishproperties.ca/toronto_ontario/current-projects.php)
45. | *22m | *7 floors | ***** | Spring Garden Road - 5504 (5504 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=203024) | Approved | May 2013
48. | *21m | *7 floors | 18149 (http://www.halifax.ca/planning/Case18149Details.html) | Gottingen & Bilby (2842 Gottingen Street) (http://forum.skyscraperpage.com/showthread.php?t=202326) | Proposed | DA Underway
49. | *20m | *7 floors | 17511 (http://www.halifax.ca/Commcoun/west/documents/Case17511BilbyIsleville.pdf) | Isleville @ Bilby (5558 Bilby Street) (http://forum.skyscraperpage.com/showthread.php?t=197304) | Approved | March 2013
50. | ***m | *7 floors | 17156 (http://www.halifax.ca/commcoun/pcc/documents/PCC-Case17156-AmendmentstoLUBforHalifaxPeninsula.pdf) | LeMarchant Residences (1220 LeMarchant Street) (http://forum.skyscraperpage.com/showthread.php?t=181297) | Under Construction | Complete - Spring 2014, Exterior (http://www.dal.ca/about/halifax-campuses/plan/projects/lemarchant-street-mixed-use-building.html)
50. | ***m | *7 floors | ***** | Spring Garden Road - 5688 (5688 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=60) | Proposed | Demolition
52. | *18m | *5 floors | 01302 (http://www.halifax.ca/commcoun/ccc/documents/101004ccc1011.pdf) | Saint Lawrence Place Office (3473 Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=175890) | Under Construction | Frame^ (http://wmfaresproperties.com/index.php?option=com_fwrealestate&view=item&id=4:joseph-howe-drive-halifax&Itemid=91)
53. | *17m | *6 floors | 17840 (http://halifax.ca/planning/Case17840Details.html) | Windsor @ Connolly (3601 Windsor Street) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=133) | Approved | DA Ammendments
54. | ***m | *6 floors | ***** | Coburg & Seymore (____ Coburg Road) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=68) | Proposed | DA Underway
54. | ***m | *6 floors | ***** | CRC Replacement @ Dalhousie (5849 University Avenue) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=87)| Proposed | Com - 2020
54. | ***m | *6 floors | ***** | Drum Condominiums (____ Cogswell Street) (http://forum.skyscraperpage.com/showthread.php?t=188807) | Approved | March 2013
54. | ***m | *6 floors | 17759 (http://www.halifax.ca/planning/Case17759Details.html) | Dutch Village @ Andrew (3573 Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=201355) | Proposed | DA Underway
54. | ***m | *6 floors | ***** | Q Lofts, The (5666 Roberts Street) (http://forum.skyscraperpage.com/showthread.php?t=198176) | Under Construction | Com - 14.04, Frame (http://www.polycorp.ca/qlofts)
54. | ***m | *6 floors | ***** | Young Street @ Windsor Street II (? Young Street) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=64) | Proposed | Unknown
60. | *15m | *5 floors | 17829 (http://www.halifax.ca/Commcoun/west/documents/Case17829OxfordStreet.pdf) | Bayers @ Oxford (3090 Oxford Street) (http://forum.skyscraperpage.com/showthread.php?t=199921) | Proposed | Rezoning Public Hearing - April 22nd (http://bancgroup.ca/properties/item/former-ultramar-sites)
61. | ***m | *5 floors | 15842 (http://halifax.ca/boardscom/drc/documents/Staffreport.pdf) | Barrington Espace (1656 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=179273) | Under Construction | Exterior (http://www.starfishproperties.ca/toronto_ontario/current-projects.php)
61. | ***m | *5 floors | ***** | Collaborative Health Education Centre @ Dalhousie (1340 Summer Street) (http://forum.skyscraperpage.com/showthread.php?t=192226) | Project Redesign | February 2013 (http://www.dal.ca/dept/facilities/campus-development/projects/interprofessional-health-building.html)
61. | ***m | *5 floors | ***** | NFB Lofts Redevelopment (1572 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=183321) | Proposed | UC - 2013.05
64. | ***m | *4 floors | ***** | Oceans Excellence Centre @ Dalhousie (1355 Oxford Street) (http://forum.skyscraperpage.com/showthread.php?t=190374) | Recently Completed | January 2013 (http://www.dal.ca/about/halifax-campuses/plan/projects/oceans-excellence-centre.html)

50

2. HALIFAX - MAINLAND / WEST:
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS, COMMUNITY) | STATUS | MORE INFORMATION
01. | 76m | 21 floors | 01205 (http://www.halifax.ca/commcoun/ccc/documents/110207ccc121.pdf) | Icon Bay Halifax (50 Bedford Highway) (http://forum.skyscraperpage.com/showthread.php?t=164192) | Approved | UC - 2013.06
02. | 46m | 16 floors | ***** | Craigmore Condos (1 Craigmore Drive) (http://forum.skyscraperpage.com/showthread.php?t=181412) | Under Construction | Frame, Com - 14.02 (http://bancgroup.ca/properties/item/1-craigmore-drive)
03. | *40m | 12 floors | 01183 | Stoneridge Tower, The (56 Walter Havill Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=139739) | Under Construction | Complete - July 2013 (http://waterton.callsos.info/)
04. | **m | 12 floors | 00624 | Abigail I, The (36 Jacob Lane) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=18) | Under Construction | Exterior, Com - 13.07 (http://universalproperties.ca/abigail-apartments.php)
04. | **m | 12 floors | 00624 | Abigail II, The (51 Jacob Lane) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=18) | Under Construction | Frame (http://universalproperties.ca/abigail-apartments.php)
04. | **m | 12 floors | 00624 | Abigail III, The (54 Jacob Lane) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=18) | Under Construction | Foundation (http://universalproperties.ca/abigail-apartments.php)
04. | **m | 12 floors | 00624 | Emcoste Lands IV (43 Jacob Lane) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=18) | Approved | Unknown
04. | **m | 12 floors | 00624 | Emcoste Lands V (39 Jacob Lane) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=18) | Approved | Unknown
04. | ***m | 12 floors | ***** | Grand Haven Heights I (50 Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Foundation (http://www.cosmosproperties.ca/#!contact-us)
04. | ***m | 12 floors | ***** | Grand Haven Heights II (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
04. | ***m | 12 floors | ***** | Grand Haven Heights III (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
04. | ***m | 12 floors | ***** | Grand Haven Heights IV (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
04. | **m | 12 floors | 01179 | Long Lake Village I (? Cowie Hill Road) (http://forum.skyscraperpage.com/showthread.php?t=156459) | Approved | Site Prep
04. | **m | 12 floors | 01179 | Long Lake Village II (? Cowie Hill Road) (http://forum.skyscraperpage.com/showthread.php?t=156459) | Approved | Site Prep
15. | **m | 10 floors | 16312 | Cresco Lands I (? Larry Uteck Boulevard) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Unknown
15. | **m | 10 floors | 16312 | Mount Royale (??? Washmill Lake Drive) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Unknown
15. | **m | 10 floors | ***** | Cresco Lands II (? Larry Uteck Boulevard) (http://forum.skyscraperpage.com/showthread.php?t=151476&page=9) | Approved | Unknown
18. | **m | *8 floors | ***** | Bentley Drive, 16 (16 Bentley Drive) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Under Construction | Frame - 8^
18. | ***m | *8 floors | ***** | Grandview Terrace (36 Bentley Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Recently Completed | May 2013
18. | **m | *8 floors | ***** | Motherhouse Redevelopment (?? Seton Road) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Proposed | Website (http://southwest.ca/motherhouse/)
18. | ***m | *8 floors | ***** | Royale Summit (599 Washmill Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Recently Completed | May 2013 (http://www.royalesummit.ca/)
18. | **m | *8 floors | ***** | Royal View Apartments (35 Bentley Drive) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Recently Completed | February 2013 (http://royalviewapartments.ca/)
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU1 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU2 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU3 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU4 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU5 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU6 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU7 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU8 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
23. | *29m | *7 floors | 17002 (http://www.halifax.ca/Commcoun/west/documents/Case17002DAStage1RockinghamSouth.pdf) | Rockingham South MU9 (? Unknown Street, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=192199) | Proposed | Stage I Approved - March 2013
32. | 23m | *7 floors | 01003 | Mariner Annex, The (16 Anchor Drive) (http://forum.skyscraperpage.com/showthread.php?t=195455) | Recently Completed | February 2013
33. | 18m | *7 floors | 16367 (http://www.halifax.ca/planning/Case16367Details.html) | 290 Herring Cove Road (290 Herring Cove Road) (http://forum.skyscraperpage.com/showthread.php?t=202532) | Proposed | DA Underway
34. | **m | *7 floors | 17760 (http://www.halifax.ca/planning/Case17760Details.html) | Bedford Highway, 644 (644 Bedford Highway) (http://forum.skyscraperpage.com/showthread.php?t=165417) | Proposed | DA Underway
34. | ***m | *7 floors | ***** | Gardens Luxury IV (421 Larry Uteck Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=16) | Recently Completed | March 2013
34. | ***m | *7 floors | 16991 | Greenpark Close, 110 (110 Greenpark Close, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165417&page=12) | Approved | Unknown
34. | ***m | *7 floors | 16991 | Greenpark Close, 112 (112 Greenpark Close, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165417&page=12) | Under Construction | Frame, Complete - September 2013 (http://www.starboardplace.com/112-greenpark-close-2/)
34. | **m | *7 floors | 01254 | Halifax West I (? Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=167306) | Approved | Unknown
34. | **m | *7 floors | 01254 | Halifax West II (? Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=167306) | Approved | Unknown
40. | **m | *6 floors | 01254 | Halifax West III (? Dutch Village Road) (http://forum.skyscraperpage.com/showthread.php?t=167306) | Approved | Unknown
40. | **m | *6 floors | ***** | Hemlock Ravine Road 'D' A (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
40. | **m | *6 floors | ***** | Hemlock Ravine Road 'D' B (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
40. | **m | *6 floors | ***** | Hemlock Ravine Road 'D' C (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
40. | **m | *6 floors | ***** | Hemlock Ravine Road 'D' D (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
40. | **m | *6 floors | ***** | Hemlock Ravine Road 'D' E (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
40. | **m | *6 floors | 01599 | Larry Uteck Boulevard, 660 (660 Larry Uteck Boulevard) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Unknown
40. | **m | *6 floors | 01179 | Long Lake Village III (? Cowie Hill Road) (http://forum.skyscraperpage.com/showthread.php?t=156459) | Approved | Site Prep
40. | **m | *6 floors | 01179 | Long Lake Village IV (? Cowie Hill Road) (http://forum.skyscraperpage.com/showthread.php?t=156459) | Approved | Site Prep
40. | ***m | *6 floors | 01599 | Luxor II, The (635 Larry Uteck Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Under Construction | Frame, Complete - Fall 2013 (http://theluxor.ca/)
40. | **m | *6 floors | ***** | Starboard Drive A (? Starboard Drive) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Road Extension
51. | *16m | *5 floors | ***** | Hobsons Lake Tower I (? Hobsons Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165874&page=6) | Approved | Pre-Leasing (http://www.hobsonslake.com/)
51. | *16m | *5 floors | ***** | Hobsons Lake Tower II (? Hobsons Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165874&page=6) | Approved | Pre-Leasing (http://www.hobsonslake.com/)
53. | **m | *5 floors | ***** | Margaret Norrie McCain Centre (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=157134&page=207) | Proposed | Fundraising
53. | **m | *5 floors | ***** | Rockwood Estates II (390 Larry Uteck Boulevard) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=13) | Recently Completed | December 2012

50

3. DARTMOUTH - URBAN:
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS) | STATUS | MORE INFORMATION
01. | 100m | 33 floors | ***** | King's Wharf I - Signature Tower (? Kings Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Unknown (http://www.kingswharf.ca/)
02. | *85m | 27 floors | 17143 (http://www.halifax.ca/planning/Case17143Details.html) | Europa Tower (? Horizon Court) (http://forum.skyscraperpage.com/showthread.php?t=188996) | Approved | Under Construction - 2013
03. | ***m | 18 floors | ***** | King's Wharf G (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
04. | ***m | 17 floors | ***** | King's Wharf F (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
05. | *56m | 15 floors | 17849 (http://www.halifax.ca/Commcoun/east/documents/HACtoHEMDCCCase17849combined.pdf) | Seagate - The Wentworth (? Irishtown Road) (http://forum.skyscraperpage.com/showthread.php?t=178588) | Approved | March 2013
06. | *54m | 14 floors | 17849 (http://www.halifax.ca/Commcoun/east/documents/HACtoHEMDCCCase17849combined.pdf) | Seagate - The Fairbanks (46 Irishtown Road) (http://forum.skyscraperpage.com/showthread.php?t=178588) | Approved | March 2013
07. | ***m | 14 floors | ***** | King's Wharf E (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
08. | *40m | 12 floors | ***** | King's Wharf A - The Anchorage (15 King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Recently Completed | May 2013 (http://www.kingswharf.ca/)
08. | *40m | 12 floors | ***** | King's Wharf B - The Keelson (31 King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Recently Completed | December 2012 (http://www.kingswharf.ca/)
08. | *40m | 13 floors | ***** | King's Wharf C - The Blue C (49 King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Approved | Under Construction - May 2013 (http://www.kingswharf.ca/)
08. | *40m | 12 floors | ***** | King's Wharf D - The Aqua Vista (67 King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Approved | Under Construction - May 2013 (http://www.kingswharf.ca/)
12. | *38m | 12 floors | 00784 | Twin Lakes Condominiums (335 Prince Albert Road) (http://forum.skyscraperpage.com/showthread.php?t=201929) | Approved | Unknown
13. | *35m | 12 floors | 01230 | 249 Windmill Road (249 Windmill Road) (http://forum.skyscraperpage.com/showthread.php?t=149623) | Approved | Unknown
14. | ***m | *8 floors | ***** | King's Wharf H (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
15. | *23m | *7 floors | 17863 (http://www.halifax.ca/planning/Case17863Details.html) | Lotuspoint (103 Ochterloney Street) (http://forum.skyscraperpage.com/showthread.php?t=194213) | Proposed | DA Underway / UC - 13.06 (http://www.lotuspointliving.com/)
16. | *21m | *6 floors | 00781 (http://www.halifax.ca/commcoun/hecc/documents/HECC070405101.pdf) | Notting Village (15 Ranya Lane) (http://forum.skyscraperpage.com/showthread.php?t=142231) | Under Construction | Frame
16. | *21m | *7 floors | 17849 (http://www.halifax.ca/Commcoun/east/documents/HACtoHEMDCCCase17849combined.pdf) | Seagate - The Wallace (150 Ochterloney Street) (http://forum.skyscraperpage.com/showthread.php?t=178588) | Approved | March 2013
18. | ***m | *7 floors | 00728 | Dexel @ Horizon I (5 Horizon Court) (http://forum.skyscraperpage.com/showthread.php?t=197535) | Approved | Unknown
18. | ***m | *7 floors | 00728 | Dexel @ Horizon II (5 Horizon Court) (http://forum.skyscraperpage.com/showthread.php?t=197535) | Approved | Unknown
20. | *15m | *5 floors | 18118 (http://www.halifax.ca/Commcoun/east/documents/Case18118NadiaDrive.pdf) | Trinity Harbourview "B" (? Nadia Drive) (http://forum.skyscraperpage.com/showthread.php?t=156039) | Approved | Unknown
21. | *13m | *5 floors | 18118 (http://www.halifax.ca/Commcoun/east/documents/Case18118NadiaDrive.pdf) | Trinity Harbourview "A" (? Nadia Drive) (http://forum.skyscraperpage.com/showthread.php?t=156039) | Under Construction | Frame
21. | *13m | *5 floors | 18118 (http://www.halifax.ca/Commcoun/east/documents/Case18118NadiaDrive.pdf) | Trinity Harbourview "C" (? Nadia Drive) (http://forum.skyscraperpage.com/showthread.php?t=156039) | Approved | Unknown
23. | ***m | *5 floors | ***** | King's Wharf J (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
23. | ***m | *5 floors | ***** | King's Wharf K (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
23. | ***m | *5 floors | ***** | King's Wharf L (? King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Proposed | Website (http://www.kingswharf.ca/)
23. | ***m | *5 floors | ***** | Thornridge @ The Belmont (? Alderney Drive) (http://forum.skyscraperpage.com/showthread.php?t=139843&page=57) | Proposed | Unknown

50

4. DARTMOUTH - SUBURBAN / EAST:
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS, COMMUNITY) | STATUS | MORE INFORMATION
01. | *41m | 13 floors | 16601 (http://www.halifax.ca/commcoun/hecc/documents/10.1.1.pdf) | Hazleton @ Harbour Isle, The (? Market Place, Dartmouth) (http://forum.skyscraperpage.com/showthread.php?t=153449&page=7) | Under Construction | Complete - January 2014, Frame (http://www.harbourisle.ca/)
02. | ***m | *8 floors | ***** | Huntington, The (58 Holtwood Court) (http://forum.skyscraperpage.com/showthread.php?t=151286&page=6) | Under Construction | Frame, Exterior (http://www.blueiron.ca/index.php?option=com_content&view=frontpage&Itemid=1)
03. | 19m | *6 floors | ***** | Oceanfront Riviera (721 Windmill Road) (http://forum.skyscraperpage.com/showthread.php?t=179769) | Recently Completed | December 2012 (http://www.rivieraapartments.ca/index.html)
04. | **m | *6 floors | 15787 (http://www.halifax.ca/council/agendasc/documents/100406ca1013.pdf) | Basswood Run I (180 Basswood Run) (http://forum.skyscraperpage.com/showthread.php?t=151286&page=5) | Under Construction | Crane Installation
04. | **m | *6 floors | 15787 (http://www.halifax.ca/council/agendasc/documents/100406ca1013.pdf) | Basswood Run II (? Basswood Run) (http://forum.skyscraperpage.com/showthread.php?t=151286&page=5) | Approved | Site Prep
06. | **m | *5 floors | 01079 (http://www.halifax.ca/council/agendasc/documents/080513ca1121.pdf) | Hector Gate Offices (30 Hector Gate) (http://forum.skyscraperpage.com/showthread.php?t=149647) | Under Construction | Frame (http://www.dartmouthcrossing.com/)
06. | **m | *5 floors | ***** | RCMP 'H' Division Headquarters (80 Garland Avenue) (http://forum.skyscraperpage.com/showthread.php?t=148575) | Recently Completed | January 2013
08. | **m | ** floors | ***** | Harbour Isle I (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle III (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle IV (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle V (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle VI (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle VII (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle VIII (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)
08. | **m | ** floors | ***** | Harbour Isle IX (? Unknown Road) (http://forum.skyscraperpage.com/showthread.php?t=153449) | Proposed | Website (http://www.harbourisle.ca/)

50

5. BEDFORD & SACKVILLE / CENTRAL:
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS, COMMUNITY) | STATUS | MORE INFORMATION
01. | ***m | 14 floors | ***** | Halifax Stanfield ALT Hotel (40 Silver Dart Drive, Goffs) (http://forum.skyscraperpage.com/showthread.php?t=197260) | Under Construction | Exterior, Interior, Complete - June 2013 (http://halifaxstanfield.althotels.ca/en/)
02. | **m | 12 floors | 16666 | Hemlock Square South A (Sub-Area 9) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
02. | **m | 12 floors | 16666 | Hemlock Square South B (Sub-Area 9) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
02. | **m | 12 floors | ***** | Stonington Park B (Sub-Areas 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
02. | **m | 12 floors | ***** | Stonington Park C (Sub-Areas 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
02. | **m | 12 floors | ***** | Stonington Park D (Sub-Areas 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
07. | **m | *9 floors | 00970 | Waterberry Park A (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
07. | **m | *9 floors | 00970 | Waterberry Park B (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
07. | **m | *9 floors | 00970 | Waterberry Park F (Sub-Area 2) (? Kearney Lake Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
10. | 30m | *8 floors | 18108 | Moirs Place (910 Bedford Highway) (http://forum.skyscraperpage.com/showthread.php?t=183575) | Approved | UC 13.06
11. | **m | *8 floors | 00970 | Waterberry Park C (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
11. | **m | *8 floors | 00970 | Waterberry Park D (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
11. | **m | *8 floors | 00970 | Waterberry Park E (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
14. | ***m | *7 floors | ***** | Courtyard by Mariott (150 Pratt & Whitney Drive, Goffs) (http://forum.skyscraperpage.com/showthread.php?t=150281&page=25) | Approved | Under Construction - April 2013
15. | **m | *7 floors | 16775 | Larry Uteck West A (Sub-Area 5) (? Larry Uteck Boulevard West) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
15. | **m | *7 floors | 16775 | Larry Uteck West C (Sub-Area 5) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | ***m | *6 floors | 17381 | Armenia Drive Multi-Unit (76 Armenia Drive, Bedford) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Approved | Unknown
17. | ***m | *6 floors | 17272 | Cushing Hill (1763 Bedford Highway, Bedford) (http://forum.skyscraperpage.com/showthread.php?t=204222) | Proposed | CDD Policy Review
17. | ***m | *6 floors | ***** | Domvista, The (267 Gary Martin Drive, Bedford) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Under Construction | Complete - Fall 2014, Crane Installation (http://www.borisholdings.com/domvista.htm)
17. | **m | *6 floors | 16666 | Hemlock Square South C (Sub-Area 9) (? Larry Uteck Boulevard West) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | ***m | *6 floors | 17215 (http://www.halifax.ca/planning/Case17651Details.html) | Inn On The Lake Expansion (3009 Highway #2, Fall River) (http://forum.skyscraperpage.com/showthread.php?t=165417&page=14) | Approved | Under Construction - June 2013
17. | **m | *6 floors | 16775 | Larry Uteck West B (Sub-Area 5) (? Larry Uteck Boulevard West) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | **m | *6 floors | 16775 | Larry Uteck West D (Sub-Area 5) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | **m | *6 floors | 16775 | Larry Uteck West E (Sub-Area 5) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | **m | *6 floors | 16775 | Larry Uteck West F (Sub-Area 5) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | **m | *6 floors | 16775 | Larry Uteck West G (Sub-Area 5) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Approved | Unknown
17. | **m | *6 floors | ***** | Stonington Park E (Sub-Area 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | ***** | Stonington Park F (Sub-Area 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | ***** | Stonington Park G (Sub-Area 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | ***** | Stonington Park H (Sub-Area 4) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | 00970 | Waterberry Park G (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | 00970 | Waterberry Park H (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
17. | **m | *6 floors | 00970 | Waterberry Park I (Sub-Area 2) (? Unnamed Road) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Road Extension
34. | **m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC09A (? Innovation Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved
34. | ***m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC09B (275 Innovation Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved
34. | **m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC09C (? Innovation Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved
34. | ***m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC09D (70 Gary Martin Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Unknown
34. | **m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC10A (? Innovation Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved
34. | **m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC10B (? Innovation Drive) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved
40. | 18m | *4 floors | 16416 (http://www.halifax.ca/planning/Case16416Details.html) | Sackville Drive, 249 (249 Sackville Drive, Lower Sackville) (http://forum.skyscraperpage.com/showthread.php?t=185604) | Approved | Recently Approved

50

WEEKLY UPDATES: MAY 17TH, 2013
# | HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS) | STATUS | MORE INFORMATION ***ALL CHANGES ARE BOLDED***
1.02. | *80m | 23 floors | 17186 (http://halifax.ca/boardscom/drc/documents/TDReport.pdf) | TD Tower Expansion (1791 Barrington Street) (http://forum.skyscraperpage.com/showthread.php?t=177100) | Under Construction | Frame
1.45. | *22m | *7 floors | ***** | Spring Garden Road - 5504 (5504 Spring Garden Road) (http://forum.skyscraperpage.com/showthread.php?t=203024) | Approved | May 2013
1.50. | ***m | *7 floors | 17156 (http://www.halifax.ca/commcoun/pcc/documents/PCC-Case17156-AmendmentstoLUBforHalifaxPeninsula.pdf) | LeMarchant Residences (1220 LeMarchant Street) (http://forum.skyscraperpage.com/showthread.php?t=181297) | Under Construction | Complete - Spring 2014, Exterior (http://www.dal.ca/about/halifax-campuses/plan/projects/lemarchant-street-mixed-use-building.html)
1.54. | ***m | *6 floors | ***** | Drum Condominiums (____ Cogswell Street) (http://forum.skyscraperpage.com/showthread.php?t=188807) | Approved | March 2013
1.54. | ***m | *6 floors | ***** | Q Lofts, The (5666 Roberts Street) (http://forum.skyscraperpage.com/showthread.php?t=198176) | Under Construction | Com - 14.04, Frame (http://www.polycorp.ca/qlofts)
2.03. | *40m | 12 floors | 01183 | Stoneridge Tower, The (56 Walter Havill Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=139739) | Under Construction | Complete - July 2013 (http://waterton.callsos.info/)
2.04. | ***m | 12 floors | ***** | Grand Haven Heights I (50 Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Foundation (http://www.cosmosproperties.ca/#!contact-us)
2.04. | ***m | 12 floors | ***** | Grand Haven Heights II (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
2.04. | ***m | 12 floors | ***** | Grand Haven Heights III (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
2.04. | ***m | 12 floors | ***** | Grand Haven Heights IV (? Grandhaven Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=190038) | Under Construction | Complete - 2014, Site Prep (http://www.cosmosproperties.ca/#!contact-us)
2.18. | ***m | *8 floors | ***** | Grandview Terrace (36 Bentley Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Recently Completed | May 2013
2.18. | ***m | *8 floors | ***** | Royale Summit (599 Washmill Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151476) | Recently Completed | May 2013 (http://www.royalesummit.ca/)
2.40. | ***m | *6 floors | 01599 | Luxor II, The (635 Larry Uteck Boulevard, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=151405) | Under Construction | Frame, Complete - Fall 2013 (http://theluxor.ca/)
2.51. | *16m | *5 floors | ***** | Hobsons Lake Tower I (? Hobsons Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165874&page=6) | Approved | Pre-Leasing (http://www.hobsonslake.com/)
2.51. | *16m | *5 floors | ***** | Hobsons Lake Tower II (? Hobsons Lake Drive, Halifax) (http://forum.skyscraperpage.com/showthread.php?t=165874&page=6) | Approved | Pre-Leasing (http://www.hobsonslake.com/)
3.08. | *40m | 12 floors | ***** | King's Wharf A - The Anchorage (15 King's Wharf Place) (http://forum.skyscraperpage.com/showthread.php?t=139715) | Recently Completed | May 2013 (http://www.kingswharf.ca/)
3.21. | *13m | *5 floors | 18118 (http://www.halifax.ca/Commcoun/east/documents/Case18118NadiaDrive.pdf) | Trinity Harbourview "A" (? Nadia Drive) (http://forum.skyscraperpage.com/showthread.php?t=156039) | Under Construction | Frame
5.01. | ***m | 14 floors | ***** | Halifax Stanfield ALT Hotel (40 Silver Dart Drive, Goffs) (http://forum.skyscraperpage.com/showthread.php?t=197260) | Under Construction | Exterior, Interior, Complete - June 2013 (http://halifaxstanfield.althotels.ca/en/)
5.17. | ***m | *6 floors | ***** | Domvista, The (267 Gary Martin Drive, Bedford) (http://forum.skyscraperpage.com/showthread.php?t=151470&page=3) | Under Construction | Complete - Fall 2014, Crane Installation (http://www.borisholdings.com/domvista.htm)
5.34. | ***m | *5 floors | 17847 (http://www.halifax.ca/planning/Case17847Details.html) | WBC09B (275 Innovation Drive, Bedford) (http://forum.skyscraperpage.com/showthread.php?t=151470) | Approved | Recently Approved

Weekly Updates Posted Every Friday When Possible

MONTHLY UPDATES: MAY 1ST, 2013
HEIGHT (M) | FLOORS | HRM CASE # | PROJECT NAME (CIVIC ADDRESS) | STATUS | MORE INFORMATION
1.01. | 172m | 48 floors | 17446 (http://www.halifax.ca/planning/Case17446Details.html) | Skye Halifax I (1591 Granville Street) (http://forum.skyscraperpage.com/showthread.php?t=193162) | Rejected | November 2012 (http://skye.callsos.info/)
1.01. | 172m | 48 floors | 17446 (http://www.halifax.ca/planning/Case17446Details.html) | Skye Halifax II (1591 Granville Street) (http://forum.skyscraperpage.com/showthread.php?t=193162) | Rejected | November 2012 (http://skye.callsos.info/)
1.44. | *25m | *7 floors | 01227 (http://www.halifax.ca/boardscom/hac/documents/hac712.pdf) | Vertu Suites (1530 Birmingham Street) (http://forum.skyscraperpage.com/showthread.php?t=164687) | Recently Completed | November 2012 (http://www.vertusuites.com/?gclid=CN7T9JTkwrMCFcaDQgod2mIAzw)
2.40. | ***m | *6 floors | ***** | Starboard Place (530 Starboard Drive) (http://forum.skyscraperpage.com/showthread.php?t=151405&page=16) | Recently Completed | November 2012 (http://www.starboardplace.com/)

Monthly Updates Posted On The First Friday Of Every Month When Possible

Empire
Jul 10, 2008, 6:14 PM
Good thread.............

Wishblade
Jul 10, 2008, 7:38 PM
deleted

Dmajackson
Jul 11, 2008, 12:50 AM
Thanks. I'm curious did i put the height to high or something i always thught there were more buildings going up above 50m....

terrynorthend
Jul 11, 2008, 1:19 AM
Well UG is theoretically 2 towers, and Kings Wharf may have as many as seven 50m ~150 ft towers. Add to this a number of 12 story developments, there are quite a lot.

spaustin
Jul 11, 2008, 2:11 AM
Sorry, never mind.

someone123
Jul 11, 2008, 4:39 AM
I think this list is more or less complete but this is a lot for a city the size of Halifax, and realistically I don't think we can expect more than a few of these to actually be under construction at any given time.

Personally I don't care that much about highrises specifically and mainly just prefer projects that stitch together or improve upon the urban fabric. Unique architectural contributions are also important.

In the taller building category I think both United Gulf and International Place would bring about major improvements to the urban fabric and would generally give the downtown a more updated feel.

I also have high hopes for the Salter Street waterfront development, which I hope starts soon.

sdm
Jul 11, 2008, 10:11 AM
I think this list is more or less complete but this is a lot for a city the size of Halifax, and realistically I don't think we can expect more than a few of these to actually be under construction at any given time.

Personally I don't care that much about highrises specifically and mainly just prefer projects that stitch together or improve upon the urban fabric. Unique architectural contributions are also important.

In the taller building category I think both United Gulf and International Place would bring about major improvements to the urban fabric and would generally give the downtown a more updated feel.

I also have high hopes for the Salter Street waterfront development, which I hope starts soon.

I rather see all the projects, regardless of height as it truly shows the economic development we are seeing in Halifax.

That being said, i've heard a rumour that the Salter Street is in jepordy and is questionable now.

someone123
Jul 11, 2008, 4:13 PM
Well, leased, sold, and under construction projects reflect economic development. Proposals are just proposals.

We've seen plenty of construction in the last few years but nothing along the lines of Unite Gulf etc. I really hope one of them gets off the ground soon. It seems a little unusual that we've heard so little news about either UG or the Salter development.

Dmajackson
Jul 11, 2008, 4:28 PM
I think I'm going to lower the height to 10 floors and/or 30m because there are a lot more developments going on that are helping the "urban fabric" and densifacation. Does anyone know any recently completed projects fitting this criteria? Is Armoury Square complete yet?

worldlyhaligonian
Jul 11, 2008, 5:37 PM
No, Armoury Square is not yet complete, they are taking forever finishing parts of the brickwork and no railings are in place. Its close, but not quite there... one of my fav developments U/C, I love how it fills in the space around the north end of the commons. I think that Armoury Villa has potential, but we'll have to see.

Dmajackson
Jul 11, 2008, 5:50 PM
How about St. James Place and Gladstone Ridge? THey looked complete the last time i was around them...

phrenic
Jul 11, 2008, 6:46 PM
St. James is renting already...or at least they have a sign out front that says so.

One of the two Gladstone towers is complete and has had people living there for some time. I'm not sure of the exact progress on the second, but it is very very close to completion if it is not done already. They are still working on the smaller building on the site.

Dmajackson
Jul 14, 2008, 6:45 PM
St. James is renting already...or at least they have a sign out front that says so.

One of the two Gladstone towers is complete and has had people living there for some time. I'm not sure of the exact progress on the second, but it is very very close to completion if it is not done already. They are still working on the smaller building on the site.

I'll put St. James Place as complete and leave Gladstone as is for now. Most of the smaller building was complete when i was around last week. My grandmother is renting a place in the small building and they told her she could move in on July 31st so I'll list Gladstone as complete when she moves in.

Dmajackson
Jul 22, 2008, 6:50 PM
I've added new columns in each section:

Proposed: PM will mean public meeting and I'll put the date, PH will mean public hearing

Approved: expected ground-breaking on project

U/C: expected completion date

Complete: completion date (after six months the project will be removed from the list).

I'm not aware of any public hearings/meetings for now and I'm not sure on some other dates so if I'm wrong or you know the date please post it here or p.m. me. :)

Haliguy
Jul 23, 2008, 12:00 AM
I'm pretty sure there is a public hearing for the Bayers Road development sometime in August.

Wishblade
Jul 23, 2008, 12:39 AM
I'm pretty sure there is a public hearing for the Bayers Road development sometime in August.

There is, on August 12th.

Somehow I think theres going to be some strong opinions on it (however unjustified they are).

Dmajackson
Jul 23, 2008, 1:05 AM
I added it. I had a look on the Halifax website and its only for the MPS ammendments right now i dont think its on the building itself

Dmajackson
Jul 23, 2008, 5:56 PM
The SGR revitalization made me look through the sections again so I've decided to add a new section for HRM initiatives.

Once again if i forgot any please tell me, and please no car-oriented initiatives (like Chebucto Road).

worldlyhaligonian
Jul 28, 2008, 3:31 AM
Comprehensive Listing of Development Applications:

http://www.halifax.ca/planning/AdditionalInformationPlanningApplications.html

someone123
Jul 29, 2008, 6:27 AM
That's not really a comprehensive list. Lots of things are missing, but those are the main projects for which a lot of information is available.

Dmajackson
Aug 8, 2008, 3:48 AM
I am listing Gladstone Ridge as complete.

The two towers look done, the townhouses are finished and my grandmother has moved into the Berkley. She has an awesome view (Gorsebrook-Tuft's Cove area). :)

From my grandmother's apartment Armoury Square looks complete. Has anyone seen the frontside recently?

Spitfire75
Aug 12, 2008, 3:31 AM
Any chance of you getting some pics of the view, maybe even a panoramic?

Dmajackson
Aug 12, 2008, 4:35 PM
Here's a sample. Unfortunately due to dirty windows and the fact i don't have any panorama progrms its diffucult to get it all but I'll see what i can do:
http://farm4.static.flickr.com/3253/2757395246_b4b6c56dbe_b.jpg
Credit: Me

The Trillium should fit nicely into this picture :D

Dmajackson
Aug 13, 2008, 1:47 AM
Well it turns out the compilation thread has spread :) Saint John now has a compilation thread in the Atlantic Canada Section.

After looking at that their thread i have decided to add the part of town each project is in. If you disagree with the part of town i have listed a project in just post what part of town it should be in and a reason. :yes:

EDIT: I've also added Harbous Isle/Sheppard's Island to the list

Dmajackson
Aug 13, 2008, 5:37 AM
After a long time of thinking I have decided to expand the list to include all projects with a thread (excluding urban-sprawl subdivisions) . This will truely show our densifacation efforts in all parts of HRM, wether it be big or small.

Dmajackson
Aug 13, 2008, 9:02 PM
I need some input in the "district" category. I've decided on the districts every where but for Halifax. On the peninsula I'm doing the four parts (Noorth, south, downtown and west) but the mainland is hard to choose. Preferably i would like three districts (north, south and armdale area) for it but I can't think of any boundaries or names. :shrug:

Please help me! :)

hfx_chris
Aug 13, 2008, 9:11 PM
Why not just mainland?

Dmajackson
Aug 13, 2008, 9:13 PM
I was worried about the size of it since it is huge but i might just leave it as it is. The mainland has a disproportionate amount of projects right now because of its land area.

Dmajackson
Aug 16, 2008, 5:58 AM
Just some updates lately:

-Gladstone is now listed as complete,
-Armoury Square is also listed as complete,
-Barrington Street Trail has been added,
-Harbour Isle has been added,
-and Trinity Harbourview has been added.

Keith P.
Aug 16, 2008, 10:37 AM
I don't think Armoury Square is close to complete yet. I drove by there this week and the entrance is still nothing but plywood, the site still is fenced off, and there is no landscaping or anything like that.

Dmajackson
Aug 16, 2008, 2:54 PM
I guess i must only look up when i drive by there. I think i will comprimise. I'll leave it listed as complete but when someone is able to tell me with certainty that it is done i'll update the completion date so it satys on the list longer.

Dmajackson
Aug 18, 2008, 10:33 PM
I've added a new feature. In the under construction category i've added the state of construction (site prep, foundation, exterior, ect).

I am using the lastest update provided on the projects thread so some of them are out dated (Crown Bay is 7 months old!).

spryscraper
Sep 12, 2008, 3:54 PM
You should add the Rockcliffe Village subdivision on the Mainland - just down the street from the Roxbury and Waterton. It's supposed to include 3 10-storey buildings.

Wishblade
Sep 12, 2008, 6:15 PM
You should add the Rockcliffe Village subdivision on the Mainland - just down the street from the Roxbury and Waterton. It's supposed to include 3 10-storey buildings.

If developments like these keep up out there, the outer fringe of Halifax will start to look pretty impressive coming in from Bayers Lake/Clayton Park.

Dmajackson
Sep 12, 2008, 8:02 PM
Added.

If these three get built judging by the pictures available in one of the documents these with Waterton/Roxbury will defenitely make a cool horizon coming from in town.

Dmajackson
Sep 19, 2008, 1:48 AM
Just to keep this thread active and on the radar I'm going to make a monthly list of updates made on this thread. Lets say every the second friday of every month (So today/tomorrow);

*Harbour Isle: split into two phases. Phase I is approved, Phase II is proposed,
*Dockside: Added to u/c list,
*Atrium: Added to u/c list,
*Seaport Farmer's Market added,
*Rockcliffe Village added.

Spitfire75
Sep 19, 2008, 2:45 PM
You should add Governor's Brook as well.

Dmajackson
Sep 20, 2008, 1:02 AM
Id there even a thread for Governor's Brook?

If not, I'm trying to keep thid for projects with a thread and preferably a "landmark" building not just houses.

Wishblade
Sep 20, 2008, 1:07 AM
Id there even a thread for Governor's Brook?

If not, I'm trying to keep thid for projects with a thread and preferably a "landmark" building not just houses.

heh, if we included every development that was just a general subdivision, the list would never end.

Dmajackson
Sep 28, 2008, 8:35 PM
For projects like Govenor's Brook I've created a thread were small projects can be mentioned, General Updates and News (http://forum.skyscraperpage.com/showthread.php?t=157134).

I've added a new term onto the list. If you ever see AOR it means as-of-right or pretty much old development agreements that can still be built. Right now it applies to International Place and the Trinity site.

Dmajackson
Oct 7, 2008, 7:31 PM
Updates:

5784 Charles Street; Added,
Theatre Lofts; Added,
19 Portland Street; Added,
Southview Condos; Added,
HSIA Upgrades; Added,
Trillium; now listed as "demolition"

Dmajackson
Oct 20, 2008, 2:50 AM
Has anybody else noticed the little "boom" coming to the north-end? It has easily outnumbered the south and west ends in number of approved and u/c buildings. They aren't really tall but they certainly are nice.

someone123
Oct 20, 2008, 5:13 AM
Yes. I expect that in a few years there will be way more going on between Cogswell and North St. The best case is that Gottingen and Agricola will become real commercial streets and the overall character of that end of the city will be more like Morris/Hollis/Barrington is today.

Takeo
Oct 20, 2008, 11:44 AM
Yes. I expect that in a few years there will be way more going on between Cogswell and North St. The best case is that Gottingen and Agricola will become real commercial streets and the overall character of that end of the city will be more like Morris/Hollis/Barrington is today.

As an aside... I've always found it weird that the "North End" is everything from Cogswell to Seaview Park. I'd say Cogswell to Almon is Central... Almon to Seaview is North. But whatever.

The worklofts on Agricola look like a great building. But the two new apartment buildings in my area (Hydrostone) are pretty ugly. That said, the new building slated for where Speedy Auto Glass used to be (across from the Hydrostone Market) looks great! It is great to see all this construction.

Dmajackson
Oct 21, 2008, 1:04 AM
I mainly go by the municipal districts roughly for this thread but it is strange at times. For example right now i have Armoury Square listed as downtown but Armoury Villa is in the north-end.

I suppose I could add a new district, "HALIFAX - CENTRAL" for projects near the Commons or along Robie Street that aren't really in any district.

hfx_chris
Oct 22, 2008, 11:13 PM
I think you're subdividing too much...

Dmajackson
Oct 23, 2008, 2:35 AM
You're probably right. I'm still experimenting with the boundaries so some might change. I might combine some in Dartmouth and maybe get rid of halifax-central since there isn't too many projects in it.

Dmajackson
Oct 23, 2008, 3:37 AM
After some consideration I have decided to get rid of halifax - central and in place of it create a "buffer zone". Basically if any projects show up there i will post a question here asking what district it should be in. For example here are the some right now;

-Trinity Site,
-Armoury Villa,
-Armoury Square,
-Spice,
-LSRC,
-5784 Charles St
-5505 Falkland

Dmajackson
Nov 4, 2008, 5:32 PM
Since I had surgery recently and have been home-ridden i've been just searching the internet and it turns out this thread has been spotted by others.

To whoever is using this list thank you! :) It is nice to know this is coming in handy elsewhares. This is a public list and is just a hobby of mine so I can;t gurantee its accuracy, just so everyone knows. :)

Dmajackson
Nov 11, 2008, 10:59 PM
Just like to say thank you to Haliguy for all the updates today! :)

There are too many changes over the past month for me to list here so I'll just let you guys have a look on your own.

worldlyhaligonian
Dec 6, 2008, 5:53 PM
I think a couple of projects should be moved to the complete category... 5800 South and Spice are basically done, Hydrostone Place and Southview as well.

It will just give us a better visual of what is u/c and gauge the impact of this economic downturn a bit better.

Dmajackson
Dec 7, 2008, 2:07 AM
I'm mainly going by the exterior so yes i will move some over. Its just hard to know when to move them.

Keith P.
Dec 7, 2008, 4:28 PM
I just drove by Spice and (not surprisingly) it is still far from complete. Exterior cladding remains undone in places and I suspect parts of the interior are unfinished as well judging from what is visible through some of the windows. Let this one go and see how long it actually takes to complete for real. It is already the slowest development I have ever seen.

sdm
Dec 7, 2008, 4:31 PM
I just drove by Spice and (not surprisingly) it is still far from complete. Exterior cladding remains undone in places and I suspect parts of the interior are unfinished as well judging from what is visible through some of the windows. Let this one go and see how long it actually takes to complete for real. It is already the slowest development I have ever seen.
Have to agree with you there, very slow.

I see 5800 South is stating on the billboard on site that they are opening feb 2009, so that one is just about there.

Hopefully get a chance to add some new ones to the thread soon...

Dmajackson
Dec 7, 2008, 5:18 PM
I was by the Spice yesterday and seeing that it still had a ways to go I didn't move it over yet. It is starting to look good though.

I moved 5800 South and Park Place V over because they are both done on the outside and both will be open to live in very soon.

Dmajackson
Jan 6, 2009, 3:26 AM
Could I ask a favor of someone?

I tried the projects map link i have in the first post earlier today and it said my collection wasn't available anymore. Could someone check the link to make it sure its not just my computer or internet having problems with it? Please and thank you. :)

Spitfire75
Jan 6, 2009, 5:01 AM
Doesn't work for me either. I get "This collection is no longer available. It may have been deleted by the author."

Dmajackson
Jan 6, 2009, 5:05 AM
Doesn't work for me either. I get "This collection is no longer available. It may have been deleted by the author."

Okay thanks Spitfire :)

I got the same message earlier I'll play with it tomorrow and see if I can get it to work again.

hfx_chris
Feb 3, 2009, 1:06 AM
I was just browsing through the list at the first post... and it struck me. All the good residential buildings going up are condos, not many apartments...

Jonovision
Feb 3, 2009, 3:03 AM
I'm pretty sure The Vic is apartments.

hfx_chris
Feb 3, 2009, 4:07 PM
And it's one of the few :(

worldlyhaligonian
Feb 4, 2009, 8:21 PM
I think Spice can be moved to Recently Completed... The Villa on Agricola is about 90% done and I think it should be moved as well.

Dmajackson
Feb 4, 2009, 9:30 PM
I think Spice can be moved to Recently Completed... The Villa on Agricola is about 90% done and I think it should be moved as well.

Done and done :)

I've also added in the Bayview Condos, and I will put the convention centre on the list tonight.

worldlyhaligonian
Feb 4, 2009, 9:37 PM
Cheers. 2009 is shaping up to be a good year for approvals and construction.

Keith P.
Feb 4, 2009, 11:11 PM
I think Spice can be moved to Recently Completed...

I don't think Spice will ever be completed...

Dmajackson
Feb 17, 2009, 2:19 AM
I was just having a look over at the list and I am astonished by the massive amounts of Downtown developments there are.

Theres 7 proposed, 5 approved, and 3 u/c. Now if we could only get half of those under construction :D

Dmajackson
Mar 4, 2009, 3:21 AM
RIP 6955 Bayers Road :(

You were a good development...

Wishblade
Mar 5, 2009, 12:15 AM
RIP 6955 Bayers Road :(

You were a good development...

Well, atleast something is still proposed for the land, even though it is an inferior proposal.

worldlyhaligonian
Mar 25, 2009, 4:48 AM
I think that a number of the U/Cs can be moved to complete...

273 Bedford Highway
Hampton Inn
Crown Bay

Dmajackson
Mar 25, 2009, 11:06 AM
I think that a number of the U/Cs can be moved to complete...

273 Bedford Highway
Hampton Inn
Crown Bay

273 I'll probably move soon since it looks like the white wall thing isn't coming down,

Hampton I'll move on the 1st of April or so since it supposed to open in April sometime,

and Crown Bay was still defenitely under construction the last I was by it about a month or two ago.

City_of_Lakes
Apr 6, 2009, 10:13 PM
You know, it'd be really cool if someone with the ability did a render of the potential future skyline of Halifax, including all the proposed developments, like UG, International Place, 1595 Barrington, etc.. You know, all the ones that would truely make an impact on the skyline.

...I mean, since it probably won't happen in real life, it would at least be cool to see on my computer screen :haha:

Dmajackson
Apr 7, 2009, 7:34 PM
You know, it'd be really cool if someone with the ability did a render of the potential future skyline of Halifax, including all the proposed developments, like UG, International Place, 1595 Barrington, etc.. You know, all the ones that would truely make an impact on the skyline.

...I mean, since it probably won't happen in real life, it would at least be cool to see on my computer screen :haha:

There's a rendering with a couple of the proposals on it floating around somewheres in this forum but it was only of a small area and its outdated by now.

Just so everyone knows I changed the first post a bit. Due to some government projects spanning many districts I created a sub-category for government funded projects which instead of being organized by district are now organized by what government is mainly behind the project (HRM, Prov, Fed, Metro Transit).

Dmajackson
Apr 8, 2009, 10:45 PM
Just to let everyone know I added in some links at the end of the list that I feel are related to the Compilation Thread.

Ufortunately for now they all seem to be "my" threads but if anybody has anything they feel could be added please tell me. It might include construction themed photo threads, lists, maps or something I haven't thought of yet.

:)

Spitfire75
Apr 9, 2009, 1:06 PM
You're effort on this forum is much appreciated. I visit every couple days and it's really convenient to have all development news in one spot. You really put a lot of work into this forum and don't get enough praise for it.

Dmajackson
Apr 11, 2009, 10:24 PM
You're effort on this forum is much appreciated. I visit every couple days and it's really convenient to have all development news in one spot. You really put a lot of work into this forum and don't get enough praise for it.

Thank-you "Spitfire75" :)

It's nice to hear people actually use this thread for information.

BTW anybody is welcome to make any suggestions/updates for this thread or the other five or so lists I have on the go right now. I'll add it in as soon as its requested. :)

P.S. I added in Wayne's website (see the neighbourhood map thread). If anybody has any good external websites they can think of I'll check them out and add them if they are appropriate.

Dmajackson
Apr 15, 2009, 12:30 AM
Does anyone happen to have updates on;

Waterton Towers

or

Dalhousie Management Building?

:)

kph06
Apr 15, 2009, 1:03 AM
Waterton is mostly interior I would say, they still are missing the final cladding on the upper 2 floors on the upper north side and elevator shaft. There is no action on the second building, the floor slab is complete on the main level, but that because it is the roof of the first level of parking. The columns don't have rebar extended any farther which would be necessary to build the rest of the building.

The dal management building is interesting. The columns are being poured on the south-west corner for the first floor, but the north-west corner does not have the foundation walls poured yet due to the tightness of the site, the columns are poured, but have been backfilled around. I could be wrong, but I believe the foundation will extend around this area. They seem to be using precast slabs for the floor that have styrofoam balls to minimize weight. These panels are about half the final thickness and have built in rebar mesh and more concrete is poured on-site to finish the thickness. Its an interesting method that I've never seen before.

wackypacky
Apr 15, 2009, 2:08 AM
It's still a long ways from being complete...i've been working on it for a week now and when i first arrived based on the outside i expected alot more to be done inside. All they have done in there on most floors is the steel studs with the exception of the upper floors. As for the 2nd building its not gonna start until the 1st is completely done.

Dmajackson
Apr 15, 2009, 2:28 AM
Thanks you two :)

I guess I'll leave the two as they are for now. I thought the Waterton would be completed by now for sure.

Dmajackson
May 1, 2009, 9:54 PM
I've added in the new proposal for Bedford (827 Bfd Hwy) and updated a couple of the others.

:)

Dmajackson
May 22, 2009, 11:49 PM
New link added in for Jonovision's "Pics Around Town" thread.

And the completion date for 273 Bedford Highway has been pushed back to May 2009 due to the base exterior being installed this week.

BTW does anybody have any suggestions/comments? This thread seems awfully dead so it would be nice to know if anybody is still using it. :)

Dmajackson
Jul 6, 2009, 10:41 PM
I've made slight changes to the Abandoned/Dead category.

Also I've changed the statuses of the Waterton Towers to completed and "in court". :)

Dmajackson
Sep 19, 2009, 6:09 PM
I've added Founders Corner and Crown Bay to the completed list and updated most of the others.

worldlyhaligonian
Oct 1, 2009, 5:47 PM
The U/C list is sure getting shorter... lets hope some approved projects break ground before winter.

worldlyhaligonian
Oct 12, 2009, 2:24 AM
Might as well move 5505 Fauxland to the complete section.

Dmajackson
Oct 12, 2009, 5:24 AM
Might as well move 5505 Fauxland to the complete section.

Done.

Does anyone have an update on it anyways?

worldlyhaligonian
Oct 12, 2009, 3:50 PM
I walked by it yesterday and it looks like they are just adding the hardware, etc to the outside of the building.

Dmajackson
Oct 24, 2009, 2:38 AM
I've been thinking about how to streamline this thread while still making sure it is fair so I wasi thinking:

Suburbs - Too many low-rises going up to keep track of so anything over 5 stories will get a mention. Exceptions to this will be when there is a shorter building (3+ stories) that is on a main road that is highly visible (ie. Portland St, Main St, Bfd Hwy, Sackville Dr)

Core (Peninsula & Downtown Dart) - Anything 3 stories or higher will be mentioned. Exceptions will be few but the Seaport Farmer's Market is one of them for now since it will be a landmark building.

So what do you guys think of these guidelines?

EDIT: Also since Bedford West has buildings that fit the current guidelines I'm going to list them as the roads make it to the sites.

worldlyhaligonian
Oct 25, 2009, 3:53 PM
Sounds good to me!

fenwick16
Nov 22, 2009, 2:47 PM
I appreciate the effort put into maintaining the compilation list. It seems like a number of the Approved and Proposed buildings will soon be in the Under Construction section.

Looking at the compilation list I can see how long it takes from the time a building is proposed to when construction actually starts. Most of this time, I believe, is the length of time it take to complete design drawings and get financing. In reality, the approval process by the HRM council usually doesn't take that long in most of the cases; only the controversial ones take a long time to be approved.

Dmajackson
Nov 22, 2009, 9:02 PM
I appreciate the effort put into maintaining the compilation list. It seems like a number of the Approved and Proposed buildings will soon be in the Under Construction section.

Looking at the compilation list I can see how long it takes from the time a building is proposed to when construction actually starts. Most of this time, I believe, is the length of time it take to complete design drawings and get financing. In reality, the approval process by the HRM council usually doesn't take that long in most of the cases; only the controversial ones take a long time to be approved.

Well I'm pleased to see people are still using this thread. :)

The Theatre Lofts were just moved from the Approved to the U/C section.

I've also restarted a map with the proposals on it. I've provided a link on the top of the list (first post). It has pointers for the projects and coloured in areas for the districts. I welcome thoughts on the district boundaries. :)

Dmajackson
Nov 23, 2009, 6:12 AM
Since I have no attention span for History essays I ended up spending a lot of time on the map today.

http://maps.google.ca/maps/ms?hl=en&ie=UTF8&msa=0&msid=112449274347342063981.000478c27521d66f7c834&ll=44.641239,-63.579576&spn=0.006779,0.02105&t=h&z=16

All of the projects are now in and the districts that I am using are shaded. There are also some of my recent photos included in the description box for visual purposes.

I made the colour system simple to understand. Red means proposed/vision, Yellow means Approved, and Green means U/C.

There are two things that I am considering doing;

Because of the oversize of the Halifax - Mainland North area I am considering splitting the district up to have Fairview seperate.

On a bigger scale I am open to making the map available to edit for some fellow forumers (called collaborators on Google Maps). To protect my work to some degree and to make sure the map isn't harmed I will only open up the invitation to people on the forum who have only the best intentions. So for example if I know you from the forum meet this Summer or I can clearly see that you are dedicated to the forum I will defenitely consider adding you. All I need is your email address.

fenwick16
Nov 25, 2009, 12:52 PM
I like the fact that you have each project linked to the corresponding thread in your compilation list. If I am looking for information I can come to the compilation list and click on the project that I am interested in.

Dmajackson
Nov 25, 2009, 9:18 PM
Since I received no feedback on splitting the Mainland North I went ahead and created a Halifax - Fairview District which includes traditional Fairview, Bayview and Mount Royale. Since the Mainland North is still huge I am probably going to subdivide the rest into four districts;

Halifax - Rockingham: Bfd Hwy (MSVU - Birch Cove), Tremont, and Flamingo.

Halifax - Clayton Park: Stretching from Dunbrack Street to the Bi-Hi from the Fairview border to Wedgewood Subdivision (plus the Northcliffe subdivision).

Halifax - Business Park: Anything in Bayer's Lake, Lakeside, or Ragged Lake Business Parks

Halifax - Mainland North: Any remaining areas with a Halifax address north of the Bi-Hi.

Dmajackson
Jan 20, 2010, 7:12 PM
Anybody else notice the new additions to the proposed list for Downtown?

I'm quite liking where all the proposals are focusing right now. :)

worldlyhaligonian
Jan 20, 2010, 8:55 PM
I want to see some of the approved get started.

worldlyhaligonian
Jan 21, 2010, 8:28 PM
Since I have no attention span for History essays I ended up spending a lot of time on the map today.

http://maps.google.ca/maps/ms?hl=en&ie=UTF8&msa=0&msid=112449274347342063981.000478c27521d66f7c834&ll=44.641239,-63.579576&spn=0.006779,0.02105&t=h&z=16

All of the projects are now in and the districts that I am using are shaded. There are also some of my recent photos included in the description box for visual purposes.

I made the colour system simple to understand. Red means proposed/vision, Yellow means Approved, and Green means U/C.

There are two things that I am considering doing;

Because of the oversize of the Halifax - Mainland North area I am considering splitting the district up to have Fairview seperate.

On a bigger scale I am open to making the map available to edit for some fellow forumers (called collaborators on Google Maps). To protect my work to some degree and to make sure the map isn't harmed I will only open up the invitation to people on the forum who have only the best intentions. So for example if I know you from the forum meet this Summer or I can clearly see that you are dedicated to the forum I will defenitely consider adding you. All I need is your email address.

This map is amazing, look at how much is proposed/approved downtown...

Dmajackson
Jan 23, 2010, 12:51 AM
This map is amazing, look at how much is proposed/approved downtown...

Thanks for reminding me of that map.

I updated a few of the photos on it and weather permitting I should have new photos from my January phototour up on Friday/Saturday.

Unfortunately the links I added into the photos have stopped working so I am trying to get a new way to have a direct link off of the map to the project's thread.

worldlyhaligonian
Jan 23, 2010, 1:24 PM
I eagerly await this phototour, I have been too busy to get a look at any developments aside from the ones on the way to work. :banana: