PDA

You are viewing a trimmed-down version of the SkyscraperPage.com discussion forum.  For the full version follow the link below.

View Full Version : Haifax-Dartmouth Bridge Commission



Dmajackson
Jul 23, 2008, 8:13 PM
I was browsing the web today and stumbled upon a video on the HDBC's website (click here (https://www.hdbc.ca/video.asp)) that lists what's going to happen with the commission for the next couple of years. I didn't manage to get everything down so i would suggest watching it. Here's the facts i did get though:

-Repairs ongoing on the four approaches from Dartmouth.
-New signs on both sides of the MacKay displaying weather conditions and construction activity,
-They now own the Victoria Street Overpass and are planning to fix it up.
-They are going to dismantle the "Abandoned bridge" on the Halifax side.
-They are painting the bridges a lighter shade of green.

Some HDBC related threads:
Third Bridge By 2016 (http://forum.skyscraperpage.com/showthread.php?t=148144)

hfx_chris
Jul 23, 2008, 9:42 PM
-Repairs ongoing on the four approaches from Dartmouth.The four approaches? Huh?
-New signs on both sides of the MacKay displaying weather conditions and construction activity,Good, good. Permanent signs I assume, not just those ones they wheel in place every time they do construction...
-They now own the Victoria Street Overpass and are planning to fix it up.That'll be good; I know they're doing construction under the overpass, hopefully resurfacing, that whole stretch is a huge mess.
-They are going to dismantle the "Abandoned bridge" on the Halifax side.Also good! That hasn't been used as an overpass in over 10 years now; I remember when I was young going over that overpass, it always seemed scary because it was so high up in the air
-They are painting the bridges a lighter shade of green.Ugh, I hope it's not that shade of puke green they have in some spots...what's wrong with dark green?

Dmajackson
Jul 23, 2008, 10:24 PM
The four approaches? Huh?
Good, good. Permanent signs I assume, not just those ones they wheel in place every time they do construction...
The two bridges (four approaches) on the Dartmouth side of MacKay Bridge (Windmill Rd and Princess Margaret Blvd). Yep they will be permnament signs. I think they said 3 on each side of the bridge.
That'll be good; I know they're doing construction under the overpass, hopefully resurfacing, that whole stretch is a huge mess.
The Q&A section on their website implied they are going to redo the whole interchange. They said they are in the design phase and construction should begin later this year.
Ugh, I hope it's not that shade of puke green they have in some spots...what's wrong with dark green?
Yep that's the colour. They said they have some of it done already.

Keith P.
Jul 24, 2008, 12:11 AM
-New signs on both sides of the MacKay displaying weather conditions and construction activity

When they redid the MacDonald they bought similar signs for use on the bridge and they use them in a totally worthless manner. 99% of the time they just say "Speed Radar Checked" or something similarly useless. When it snows they have a "Slippery" version that goes up. There may be one or two others they have but I can't remember. Regardless, they are worthless they way they are used. Hopefully these will be better.

I'm disappoionted they don't have on their list a redevelopment of the MacDonald deck where it meets the toll plaza to widen it out and remove a constant bottleneck. That is a very poorly designed area that could be fixed relatively easily.

hfx_chris
Jul 24, 2008, 6:20 PM
When they redid the MacDonald they bought similar signs for use on the bridge and they use them in a totally worthless manner. 99% of the time they just say "Speed Radar Checked" or something similarly useless. When it snows they have a "Slippery" version that goes up. There may be one or two others they have but I can't remember. Regardless, they are worthless they way they are used. Hopefully these will be better.
I think when the center lane is changing, it displays a message to let you know. But that's about as useful as it gets.

Wishblade
Jul 24, 2008, 7:41 PM
I think when the center lane is changing, it displays a message to let you know. But that's about as useful as it gets.

Don't forget that it tells you the speed limit that never ever changes! :haha:

Dmajackson
Jul 24, 2008, 8:26 PM
Don't forget that it tells you the speed limit that never ever changes! :haha:

I don't use the bridge much but i think there are real signs telling you the speed limit as well. It would be more useful if they put "Have a Nice Day" or "Drive Safe". :haha:

hfx_chris
Jul 24, 2008, 11:54 PM
Hell, even if they just interspersed the speed limit with other public service messages it would be a hell of a lot better.

terrynorthend
Jul 25, 2008, 12:42 AM
Time and temperature!! Lets start a petition..:jester:

Amanita
Jul 30, 2008, 3:50 AM
Anyone attending Bridge Walk this monday? I'll be there in full Jedi regalia, with some friends.

Dmajackson
Jul 30, 2008, 5:15 AM
Not planning to walk it but if i do i'm sure you'll stick out of the crowd...

Just a little fact i found out recently. The HDBC is planning to take-over the Burnside Expressway (with tollbooths naturally) when its built. I imagine that they will also pursue buying the roads between them (Circ & Burnside Dr).

terrynorthend
Jul 31, 2008, 2:12 AM
Anyone attending Bridge Walk this monday? I'll be there in full Jedi regalia, with some friends.

What is your rank/role? I just discovered an old friend of mine is a Stormtrooper.. member of the 501st.. nice looking suit..

hfx_chris
Jul 31, 2008, 11:19 AM
:sly:

Amanita
Aug 1, 2008, 1:04 AM
I'm not in the Rebel Legion yet- that's the costuming group for the "good guys" of the Star Wars universe, the sister of the 501st.
I'll have to get some pics during bridge walk and post them, not to mention hoping and praying that the weather forecast changes- calling for fuckin rain. Ugh.

macgregor
Feb 26, 2010, 9:57 PM
I was looking at Halifax Harbour Bridges' 2008-2009 Annual Report. I found it interesting to read. It says that in 2009 the will "conduct a study on the impact peak period tolling and one-way tolling might have on reducing congestion at the bridges". I know that one-way tolling may have some minor unintended consequences like shifting traffic patterns, but it otherwise seems like a good idea to me.

https://www.hdbc.ca/docs/2208-2009%20final%20report-2.pdf

Halifax Hillbilly
Feb 27, 2010, 1:18 PM
I was looking at Halifax Harbour Bridges' 2008-2009 Annual Report. I found it interesting to read. It says that in 2009 the will "conduct a study on the impact peak period tolling and one-way tolling might have on reducing congestion at the bridges". I know that one-way tolling may have some minor unintended consequences like shifting traffic patterns, but it otherwise seems like a good idea to me.

https://www.hdbc.ca/docs/2208-2009%20final%20report-2.pdf

Peak period tolling is an excellent idea.

Dmajackson
Nov 17, 2010, 12:35 PM
No hike in peak-time bridge tolls
By DAVENE JEFFREY Staff Reporter
Wed, Nov 17 - 7:26 AM

Commuters who travel the bridges spanning Halifax Harbour won’t be paying high peak-time tolls.

Halifax Harbour Bridges has released results of a study looking into ways to lighten traffic during rush hour on the two bridges. In particular, the study considered the impact of imposing peak-period tolls and one-way tolling.

About 32 million vehicles cross the harbour each year, with weekday crossings often exceeding 100,000, Halifax Harbour Bridges numbers show.

But to get commuters to travel at non-peak periods or to use Metro Transit’s buses and ferries would require a huge jump in tolls, the study found.

"I was a bit surprised," said Halifax Harbour Bridges general manager and CEO Steve Snider in a telephone interview Tuesday.

Even an increase to $3 from the current 60-cent toll for Macpass users would only result in a drop of about 15 per cent during rush-hour traffic at 7-9 a.m. and 3-6 p.m.

"A 15 per cent shift would basically be unnoticed by commuters," Snider said.

According to the study, the only way to significantly cut rush-hour traffic on the bridges would be to impose a $6 toll.

"At this stage, the potential benefit of peak-period tolling is not enough to justify the cost to our users," Snider said in a release.

One-way tolling has also been ruled out by the commission after the study showed it could lead to increased congestion in the non-tolled direction and would likely cut bridge revenues.

It’s the commission’s mandate to provide safe, efficient and reliable crossings at an appropriate cost, Snider said.

And at this point there’s not much else Halifax Harbour Bridges can do, he said.

The answer is to improve the transit system and carpooling, the bridge boss said.

To get commuters out of their cars, transit buses would have to have priority on city streets and transport passengers to their destinations faster, he said.

The $175,000 study took about eight months, Snider said.

Bridge commissioner Coun. Sue Uteck (Northwest Arm-South End) defended the study, calling it a "worthwhile exercise."

For Uteck, the solution is to buy more ferries and create more parking at the terminal lots.

Both Uteck and Snider say a third harbour crossing, be it a bridge or tunnel, would be too expensive, with a projected cost of more than $1 billion.

"We’ve got to do a better job of providing alternative transportation and we haven’t. We got denied funding for the Woodside ferry. It’s 35 years old, and not only do we need to replace it, we need two of them," Uteck said.

And to fund that infrastructure, Uteck suggests imposing a toll of 25 cents per car at the Armdale Rotary. "We’re at capacity right now with what we can afford to fund. So we have to find alternative sources of funding."

In the meantime, Halifax Harbour Bridges is looking to increase its revenues through general toll increases. Starting Monday, the commission will appear before the Nova Scotia Utility and Review Board to present its case to have tolls increased 25 cents to $1 for commuters who pay cash.

The commission wants Macpass users to pay a 20-cent increase to 80 cents per crossing. If approved, the increases will be effective Feb. 1, 2011, Snider said.

The last time tolls were increased — to 75 cents from 50 cents — was in 1992.
( djeffrey@herald.ca )

Chronicle Herald Article (http://www.thechronicleherald.ca/Metro/1212468.html)

fenwick16
Nov 17, 2010, 12:50 PM
I think that tolls should be increased on the Harbour Bridges and part of the revenue generated could be used for better cross-harbour rapid transit (ferries or other) and to build a tunnel under the North West Arm. I think that the tolls should realistically be about double what they currently are. Maintaining low toll rates will simply encourage more cars on the Halifax peninsula coming from Dartmouth and further growth on the Dartmouth side of the harbour (I have nothing against Dartmouth except that splitting the population on two sides of the harbour is costly). Encouraging growth to the southwest of Halifax will be a cheaper option.

PS: The Halifax Harbour Bridges commission would also be responsible for building and collecting tolls on a North West Arm tunnel.

(source: https://www.hdbc.ca/mandate.asp )
With the approval of the Governor in Council, HHB may construct, maintain and operate transportation projects across the Halifax Harbour and/or the North West Arm.

fenwick16
Nov 24, 2010, 12:42 PM
In the Chronicle Herald today, there were a few more details about replacing the deck and vertical suspension cables on the MacDonald Bridge. This is a major project at $139 million dollars.

(the complete story is at: http://thechronicleherald.ca/Metro/1213622.html )
Lions Gate makeover a preview of what’s ahead for Macdonald By IAN FAIRCLOUGH Staff Reporter Wed, Nov 24 - 4:53 AM
http://thechronicleherald.ca/sites/default/files/imagecache/story_large/stories/photos/11-24-10_788980.jpg

The process of replacing the suspended span of the Angus L. Macdonald Bridge over Halifax Harbour will be the same as what was done to the Lions Gate Bridge in Vancouver 10 years ago.

The Macdonald and the Lions Gate were both designed by noted engineer Philip Pratley and they are very similar in construction. In 2000 and 2001 the entire suspended section of the Lions Gate was replaced. That meant everything on the driving surface, including the steel underneath.

It was the first replacement anywhere in the world of the deck of a major suspension bridge.
.
.
.

halifaxboyns
Jan 27, 2011, 8:48 PM
Halifax-Dartmouth bridge tolls to rise to $1

By CLARE MELLOR Staff Reporter | UPDATED 1:40 p.m.
Thu, Jan 27 - 12:48 PM

As of April 1, motorists will pay more to cross the two Halifax Harbour bridges.

Those paying cash will shell out $1 per crossing, 25 cents more than they pay now.

Subscribers to MACPASS, an electronic toll collecting system, will see the fare jump from 60 to 80 cents. However, that increase for MACPASS users will be phased in over two equal steps April 1 of this year, and April 2012.

The Nova Scotia Utility and Review Board, which regulates the bridge tolls, released a written decision on the matter Thursday after an application last year by the Halifax-Dartmouth Bridge Commission.

The board held a hearing on the matter in November.

The commission has said it requires the fare increase to help pay for significant and expensive construction projects on the bridges coming up in the next few years.

The written decision can be found here (http://nsuarb.ca/images/stories/pdf/Decisions/11Jan/HDBC%20Decision.pdf).

Personally; I support the increase - it's been a while and the bridges do need maintenance, but I suspect you'll see the ridership on Metro Transit increase too - as more people take the bus.

Jstaleness
Jan 28, 2011, 12:25 AM
Personally; I support the increase - it's been a while and the bridges do need maintenance, but I suspect you'll see the ridership on Metro Transit increase too - as more people take the bus.

Great point. You know, 20 to 25cents doesn't seem like much but you add that up with increasing gas prices and it will become cheaper to ride the bus. Hopefully bus fares stay where they are for awhile. Bus toll is not expected to change so it doesn't give Metro Transit an excuse to up fares. I would like to know if I'm the only one who thinks that Metro Transit shouldn't be paying tolls on the bridge period.

David1gray
Jan 28, 2011, 2:13 PM
i suppose i will put this here.......
Councillor proposes Halifax road tolls

Transit improvement must come first: Hendsbee

A councillor in the Halifax area says new road tolls in the city may help reduce traffic congestion on the peninsula.

Coun. David Hendsbee raised the issue in front of colleagues and city staff on Thursday evening at Halifax Regional Council's first session of its standing committee on transportation.

He said the idea of road tolls is included in the transportation demand management plan, a newly-created blueprint for reducing traffic congestion by promoting transit, carpooling, biking and walking.

"Basically to have an opportunity to tax vehicles coming in and out of the capital district area," Hendsbee told CBC News.

The councillor for Preston-Lawrencetown-Chezzetcook said it's not fair for commuters coming from the eastern part of the municipality to continue to pay a bridge toll to cross the Halifax Harbour, while commuters from the western side of the municipality pay nothing.

He said the best place to put road tolls would be on the eight bridges — including one on Quinpool Road — that span the railway cut on the Halifax peninsula.

"It's the only effective way to try to control the traffic in and out of the downtown core, but it's also the last piece of the puzzle," said Hendsbee.

"We should be having all the other parts of the plan in place first, be it the bikeways, be it the Park and Ride sites, be it the transit — the express and regular service — so that way, people have an option."

CN Rail and the Halifax Regional Municipality are in discussion about the repairs and ongoing maintenance of the bridges over the rail cut.

"If CN was to transfer those ownerships to the municipality or to a transit authority or to the province, one way to help pay for the maintenance would be assistance through tolling," said Hendsbee.

http://www.cbc.ca/canada/nova-scotia/story/2011/01/28/ns-hendsbee-road-tolls.html

uhhh are they crazy? this would definitely help in keeping people like me away from downtown. i agree that the bridges need to be fixed, and transit more used but this isnt the way to get that if you ask me.

fenwick16
Jan 28, 2011, 5:45 PM
I agree with the concept of discouraging cars in the downtown core but I wonder if there aren't better ways to do it than with peninsula road tolls. One way is to increase the bridge tolls even more (to about $1.50) but have a truly rapid transit system operating on the Dartmouth side of the two Harbour Bridges. This could use buses but they would have to operate with short waiting times (5 - 10 minutes maximum) and get to the downtown Halifax core very quickly so that people will be encouraged to park their cars on the Dartmouth side and then take the rapid transit. I would also like to see a North West Arm tunnel and that could have tolls.

On the Halifax side there should be park and ride locations outside the core whereby people can park and take Bus Rapid Transit into the core.

I think that growth should be encouraged on the Halifax side so that massive amounts of money won't be required for a 3rd harbour bridge.

Jstaleness
Jan 28, 2011, 6:28 PM
There is already so many people complaining about the cost of parking downtown. I wonder how these people are going to react when they'd have to pay just to get downtown? This is a very general statement but wouldn't this move cause more suburbanization?

DigitalNinja
Jan 28, 2011, 6:32 PM
I think that it would. By putting road tolls to get onto the peninsula you would be segregating it from the rest of the city essentially.
There was a really funny comment in the herald today they had a comment from some guy who said. "I don't think they should have bridge tolls, people who use bedford highway don't have to pay tolls."

Keith P.
Jan 29, 2011, 3:04 PM
The idea of tolls for coming onto the peninsula comes from one of the most moronic councillors (Hendsbee) and accordingly is a moronic idea. There already is a toll -- the bridge toll. The way the city is laid out geographically you have to come onto the peninsula if you are traveling from the east to west or vice versa. You are just passing through. How else are you supposed to go from Dartmouth to Bayers Lake, for example? Perhaps he is proposing toll plazas at the corner of Barrington and Cogswell and others at entry places surrounding the downtown core. That is simply ridiculous. We don't have a real traffic problem or a downtown parking problem. We have minor choke points that could be easily fixed with some intelligent road design and minor investment.

-Harlington-
Jun 16, 2011, 4:21 PM
Despite toll increase, bridges still owe N.S.


Halifax-Dartmouth bridge tolls to go up April 1
Hearing for bridge toll increase begins

The agency that oversees the bridges owes about $53 million, down from $123 million in 2007. That debt — some of which was incurred to build a third lane on the Angus L. Macdonald Bridge in 1999 — was financed through the province.

The bridges that cross Halifax harbour were discussed before a committee at the Nova Scotia legislature on Wednesday.

Wayne Mason, the vice-chair of the board of commissioners for the Halifax-Dartmouth Bridge Commission, was asked if the bridges would ever be paid off.

"Will they ever be paid for? Not in the foreseeable future. Will we ever be out of debt? Not in the foreseeable future," he said.

Both the Angus L. Macdonald and A. Murray MacKay bridges are due for major retrofits.

The Macdonald Bridge is scheduled to have its deck replaced in about four years — a job that could cost as much as $200 million and take 18 months to complete.

The MacKay Bridge will have similar work done in about 12 years. That upgrade is expected to cost as much as $350 million.

"Just when you see the $60 million getting down and you're going to say, 'Well, we're out of debt and that's paid off,' we do have this redecking project," said Mason.

In April, commuters started paying $1 per crossing to help pay for the work. It works out to an increase of 25 cents.

Mason said the Halifax-Dartmouth Bridge Commission is looking at issuing bonds to help raise the money needed to pay for the work on the Macdonald Bridge.

Steve Snider, the CEO and general manager of the Halifax-Dartmouth Bridge Commission, said he doesn't know if other increases are likely.

Future increases
"We have this major project coming up. We did make an application and the toll increase has been granted and that toll increase will serve us for this project," said Snider.

He was also asked if the commission will apply for another increase.

"I don't know. I can't say never, but right now what we have received is going to serve us for the project we have," Snider responded.

"There's no plans or intentions on any other increase."

Those responsible for the bridges said there's little more they can do to ease congestion. Ten years ago, the Halifax-Dartmouth Bridge Commission requested a study to determine what it could do to encourage people to not use the bridges so much.

Mason said the conclusion wasn't encouraging.

"The study showed that substantial change in demand would only occur if a very significant increase in tolls were applied," he said.

"A 500 per cent increase in tolls to bridge tolls would result in a bridge demand reduction of only 15 per cent."

Mason said there are no plans to further increase the tolls on the bridge

Keith P.
Jun 16, 2011, 8:04 PM
It is utter nonsense for these officials to claim they can do nothing to alleviate congestion. The problem with congestion is not ON the bridges; it is getting to them and away from them. The approaches and toll gates on either side on both bridges are atrocious, and especially on the Macdonald. Why are not all tollgates except one in each direction MacPass only? Why has the "funnel" on the Dartmouth side of the Macdonald not been widened to eliminate the bottleneck as you approach the tolls? Why has nothing been done to move traffic through the Wyse Rd intersection more efficiently? And on the MacKay, why are we still saddled with the atrocious Windsor St exchange? Changes to these areas would move traffic far more efficiently and quickly. I do not find these HDBC officials very convincing nor do they inspire much confidence.

beyeas
Jun 17, 2011, 1:05 PM
It is utter nonsense for these officials to claim they can do nothing to alleviate congestion. The problem with congestion is not ON the bridges; it is getting to them and away from them. The approaches and toll gates on either side on both bridges are atrocious, and especially on the Macdonald. Why are not all tollgates except one in each direction MacPass only? Why has the "funnel" on the Dartmouth side of the Macdonald not been widened to eliminate the bottleneck as you approach the tolls? Why has nothing been done to move traffic through the Wyse Rd intersection more efficiently? And on the MacKay, why are we still saddled with the atrocious Windsor St exchange? Changes to these areas would move traffic far more efficiently and quickly. I do not find these HDBC officials very convincing nor do they inspire much confidence.

I agree with you on many of the changes you suggest, but a big part of the problem is lack of overlap in terms of mandates.

The only thing on that list that is within the HDBC's mandate is the setup of tolling booths.

They have zero input or ability effect change in terms of the surface roads like Windsor exchange. I know I sound like a broken record, but this city bloody needs an over-riding transport authority that can think and act "big picture". Changes to the road structure around Wyse Rd that you suggested, and changes to mass transport that Someone123 suggested on another thread would both have significant impact.

The HDBC, roads, and mass transport are 3 separate agencies with 3 separate mandates, and that is at the root of many of the transportation problems in this city.

someone123
Jun 18, 2011, 8:36 PM
Yeah, it's crazy that one entity is responsible for bridges, another for roads, another for transit. We never see real comparisons between different transportation options because each agency is focused on empire building.

Similarly because councillors vote on little transportation projects (e.g. Chebucto Road, Washmill, the Dartmouth bus terminal debacle) everything is polarized/politicized.

Hali87
Jan 31, 2012, 6:19 AM
This is from an article posted earlier this month by Haligonian88 in the Burnside thread; the article is about a steelworks company but the last paragraph just caught my attention:


"And then, of course, the Macdonald bridge is going to be coming out to bid here in probably the next two years,” Ross said. “That’s something in the range of a $200-million project.”

Does he mean that the bridge is likely to be replaced within the next couple years? Or does it cost that much just to maintain? Either way, that's a lot of money.

Dmajackson
Jan 31, 2012, 6:25 AM
^It's probably the deck replacement project slated for 2014. It's a huge construction project requiring long-term closures of the MacDonald and it was the reason for the increases in toll fares last year.

resetcbu1
Jan 31, 2012, 5:48 PM
^It's probably the deck replacement project slated for 2014. It's a huge construction project requiring long-term closures of the MacDonald and it was the reason for the increases in toll fares last year.

Wasn't the entire deck redone not too Long ago ? 12 years max...... I think

Wishblade
Jan 31, 2012, 7:07 PM
Wasn't the entire deck redone not too Long ago ? 12 years max...... I think

I believe they added the 3rd lane in 1999 and I think a resurfacing was done at that time as well.

Waye Mason
Jan 31, 2012, 10:26 PM
The last project replaced the deck, making it three lanes, upgrading lights and signage and the toll plaza, and adding the sidewalk and bike lanes hanging outside the strand cables (the straight up and down cables).

The next project is describe on the HHB website: https://www.hdbc.ca/construction.asp
Macdonald Bridge suspended span redecking project - 2015
In early 2015 the largest project since the building of the MacKay Bridge in 1970 will begin, the replacement of the suspended spans of the Macdonald Bridge. The design work is taking place now and the on-site work will begin in early 2015 and end in late 2016.

When the third lane on the Macdonald Bridge was added, the deck on the approach spans was replaced as well. At this time it was estimated the suspended span deck had another 15 years of life. The bridge remains very safe, however, the work will be done before it becomes a critical project.
The project includes: replacing the road deck, floor beams, stiffening trusses and suspender ropes on the suspended spans of the Macdonald Bridge. When this project is complete, a significant amount of the bridge infrastructure will be new.

This project is expected to cost approximately $200 million dollars, and because it is only the second time a project of this nature has been completed, it will attract worldwide attention.

The cost associated with this project is the reason HHB requested, and the NSUARB granted , a toll increase in 2011. With strong fiscal management, decreasing interest rates and increasing revenue HHB was able to avoid a toll increase for almost 20 years.


Building a third bridge was quoted at $1.1-1.6 billion.

resetcbu1
Feb 1, 2012, 1:06 AM
The last project replaced the deck, making it three lanes, upgrading lights and signage and the toll plaza, and adding the sidewalk and bike lanes hanging outside the strand cables (the straight up and down cables).

The next project is describe on the HHB website: https://www.hdbc.ca/construction.asp


Building a third bridge was quoted at $1.1-1.6 billion.
Hmmm that's interesting, I am surprised they did not do that when they resurface the deck last time

amiefrost
Feb 3, 2012, 9:21 AM
Accidents on the bridges are becoming more frequent and nothing is being done to address the main cause; lane swapping during peak hours.

There are signs posted saying to remain in one lane. I assume the reason they are not enforced is because the bridge commission does not want to pay an employee to montior cameras.

What if the city paid a portion of the cost for the sake of more efficient traffic flow? I am sure the insurance companies would even consider subsidizing that somehow as they must be paying trhough the nose lately anyway.

There is no excuse for the lack of enforcement of road regulations on the bridges. Many of these people who suddenly jump lanes in a bug hurry to get through ahead of everyone else, cause accidents behind them that they then drive away from. It's all on camera everyday, and yet they continue to get away with it.

Where is the enforcement? Where are the officials who should be addressing this safety concern? It happens day after day, with accidents two or three times a week causing traffic jams and tying up the city. Where are the people who are supposed to oversee this sort of civic problem?

Keith P.
Feb 3, 2012, 2:38 PM
The biggest issues with the bridges are the poor road infrastructure at either end and the toll plazas. Eliminate the toll plaza merge as much as you possibly can and a lot of the trouble goes away. Fix the exits from the bridges and the cause of sudden stops on the spans goes away, which IMO is the root cause of most of the incidents.

something_witty
Feb 3, 2012, 2:52 PM
Accidents on the bridges are becoming more frequent and nothing is being done to address the main cause; lane swapping during peak hours.

There are signs posted saying to remain in one lane. I assume the reason they are not enforced is because the bridge commission does not want to pay an employee to montior cameras.

What if the city paid a portion of the cost for the sake of more efficient traffic flow? I am sure the insurance companies would even consider subsidizing that somehow as they must be paying trhough the nose lately anyway.

There is no excuse for the lack of enforcement of road regulations on the bridges. Many of these people who suddenly jump lanes in a bug hurry to get through ahead of everyone else, cause accidents behind them that they then drive away from. It's all on camera everyday, and yet they continue to get away with it.

Where is the enforcement? Where are the officials who should be addressing this safety concern? It happens day after day, with accidents two or three times a week causing traffic jams and tying up the city. Where are the people who are supposed to oversee this sort of civic problem?

As a claims adjuster for a local insurer, I can tell you that I have never had a claim in the last 5 years because of lane changes. It is always people following too closely and rear-ending another driver.

amiefrost
Feb 3, 2012, 6:38 PM
you are kidding me, right?? Please tell me that you are kidding me????

Keith P.
Feb 3, 2012, 7:12 PM
As a claims adjuster for a local insurer, I can tell you that I have never had a claim in the last 5 years because of lane changes. It is always people following too closely and rear-ending another driver.

I would agree. The only lane-changing incidents I have seen involve Metro Transit buses sideswiping other cars because they cannot stay in their lane or change lanes unexpectedly, especially at the toll plaza end of the MacDonald bridge.



Forums Directory