PDA

View Full Version : 1709 Chestnut Place North Tower, Denver, Proposed, 250”/76M, 24 stories


denconyny
Apr 11, 2015, 8:29 PM
Shorenstein Properties of San Francisco is proposing to build a 24-story, mixed-use highrise in Denver, Colorado, called 1709 Chestnut Place, North Tower. This is a recent proposal, and I do not see it currently in the SP Denver database. If it is not indeed currently in the database, could this please be added? Please find below necessary info:

===================================

Official Sources: https://www.denvergov.org/Portals/646/documents/planning/planningboard/agendas/1709Chestnut_2014D00483_SD_033015.pdf

Unofficial sources: http://www.denver-cityscape.com/
(see article under 4/10/2015)

https://www.denvergov.org/Portals/696/documents/SitePlanReview/MajorProjectsReport-4.6.15.pdf
(see page 2, 5th entry down, “1709 Chestnut Place”

Building Name: 1709 Chestnut Place North Tower
Native Name:
Other Names:
Street Address: 1709 Chestnut Place
City: Denver
Postal Code: 80202
State/Province: Colorado
Country: U.S.A.
Official Building Website URL: : https://www.denvergov.org/Portals/646/documents/planning/planningboard/agendas/1709Chestnut_2014D00483_SD_033015.pdf


Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL:
CTBUH.org URL :
Structurae.de URL:
• Architect: Shears Adkins + Rockmore of Denver
Interesting Facts/Records (in own words):


• Floor-to-floor height:
Coordinates (with decimal fraction): 39° 45' 21.25" N 105° 00' 06.00" W

Heights—250”
PLEASE PROVIDE SOURCES FOR HEIGHTS, OTHERWISE WE WILL ASSUME THEY ARE ESTIMATES AND HEIGHTS NOT BE SHOWN.
- antenna:
- spire:
- roof:
- top floor:
- other heights:

Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed

Construction Dates--
- started: 2015
- finished: 2018
- destroyed:

Above ground floors: 24
Basement floors:
Gross Floor area:
Unit count:

Structure Type(s): Highrise
Building Use(s): Mixed Use, Residential, retail
Building Style(s):
Building Materials:

===================================

Thanks

:)

denconyny
Apr 11, 2015, 8:32 PM
Shorenstein Properties of San Francisco is proposing to build a 12-story, mixed-use highrise in Denver, Colorado, called 1709 Chestnut Place, South Tower. This is a recent proposal, and I do not see it currently in the SP Denver database. If it is not indeed currently in the database, could this please be added? Please find below necessary info:

=============================

Official sources: https://www.denvergov.org/Portals/646/documents/planning/planningboard/agendas/1709Chestnut_2014D00483_SD_033015.pdf

Unofficial sources: http://www.denver-cityscape.com/
(see article under 4/15/2015)

https://www.denvergov.org/Portals/696/documents/SitePlanReview/MajorProjectsReport-4.6.15.pdf
(see page 2, 5th entry down, “1708 Chestnut Place”

Building Name: 1709 Chestnut Place South Tower
Native Name:
Other Names:
Street Address: 1709 Chestnut Place
City: Denver
Postal Code: 80202
State/Province: Colorado
Country: U.S.A.
Official Building Website URL: : https://www.denvergov.org/Portals/646/documents/planning/planningboard/agendas/1709Chestnut_2014D00483_SD_033015.pdf


Wikipedia.org URL:
Skyscrapers.com (Emporis.com) URL:
CTBUH.org URL :
Structurae.de URL:
• Architect: Shears Adkins + Rockmore of Denver
Interesting Facts/Records (in own words):


• Floor-to-floor height:
Coordinates (with decimal fraction): 39° 45' 19.00" N 105° 00' 08.00" W

Heights--140”
PLEASE PROVIDE SOURCES FOR HEIGHTS, OTHERWISE WE WILL ASSUME THEY ARE ESTIMATES AND HEIGHTS NOT BE SHOWN.
- antenna:
- spire:
- roof:
- top floor:
- other heights:

Current Building Status (Built, Proposed, Cancelled, Destroyed, etc...): Proposed

Construction Dates--
- started: 2015
- finished: 2018
- destroyed:

Above ground floors: 12
Basement floors:
Gross Floor area:
Unit count:

Structure Type(s): Highrise
Building Use(s): Mixed Use, Residential, retail
Building Style(s):
Building Materials:

=============================

Thanks

:)

denconyny
Jul 18, 2015, 12:48 PM
Even though the first link (preceding post) of this project has been pulled down in the City and County of Denver website and is now a void link, Shears, Adkins and Rockmore, architects to the project, have provided an update for this project in their "Work - In Progress" section

http://sararch.com/projects/in-progress/1709-chestnut-the-commons/

It seems that all other info provided remains the same, and since this is currently working its way through the Denver Planning Board, this project may even have a 2015 start.

This is probably a safe bet to please add under Proposed in the SP Denver database.

Thanks

:)

denconyny
Jul 18, 2015, 12:49 PM
Even though the first link (preceding post) of this project has been pulled down in the City and County of Denver website and is now a void link, Shears, Adkins and Rockmore, architects to the project, have provided an update for this project in their "Work - In Progress" section

http://sararch.com/projects/in-progress/1709-chestnut-the-commons/

It seems that all other info provided remains the same, and since this is currently working its way through the Denver Planning Board, this project may even have a 2015 start.

This is probably a safe bet to please add under Proposed in the SP Denver database.

Thanks

:)

denconyny
Oct 25, 2015, 12:28 AM
Even though a new rendering of this project has been released:

http://denverinfill.com/blog/2015/10/new-union-station-project-1709-chestnut.html

and

http://denverurbanreview.com/2015/10/1709chestnut/

and

http://www.denver-cityscape.com/
(see 9/15/15 post)

this project is still working its way through the Denver City Planning Department, and with no changes to the data about it as listed in the opening post, it is safe to please add to this project to the SP database under Proposed. Construction is projected to start sometime in the First Quarter of 2016.... some 3-6 months away now.

Thanks

:)

denconyny
Oct 25, 2015, 12:29 AM
Even though a new rendering of this project has been released:

http://denverinfill.com/blog/2015/10...-chestnut.html

and

http://denverurbanreview.com/2015/10/1709chestnut/

and

http://www.denver-cityscape.com/
(see 9/15/15 post)

this project is still working its way through the Denver City Planning Department, and with no changes to the data about it as listed in the opening post, it is safe to please add to this project to the SP database under Proposed. Construction is projected to start sometime in the First Quarter of 2016.... some 3-6 months away now.

Thanks

:)

denconyny
Jan 12, 2016, 4:01 AM
As this project is added to the SP database:

http://skyscraperpage.com/cities/?buildingID=107519

it's coordinates are

39° 45' 21.25" N 105° 00' 06.00" W

Thanks

:)

antoun
Feb 17, 2016, 12:58 AM
edit height

denconyny
Feb 17, 2016, 2:12 AM
Since this project is already included in the SP database...

http://skyscraperpage.com/cities/?buildingID=107519

and heights seem to already be done.

However, 2 things.......

First.....

there will be 2 separate towers included in the project, and this particular on is the North Tower. Somehow, the name maybe would need to reflect such and then

second....

this project is not listed on the map, so here are the coordinates....

39° 45' 21.25" N 105° 00' 06.00" W

and these numbers will put one smack dab in the middle of this tower......

Thanks

:)