MONTREAL | M9 Phase III | 15 FLOORS
Rue Duke (intersection rue Wellington)
Phase 3: environ 100 appartements en copropriété Promoteur et constructeur: Développements McGill Architecte: Sid Lee Architecture http://www.acam.qc.ca/upload/162620.jpg http://www.acam.qc.ca/upload/162620i.jpg |
Update from yesterday.
Quote:
|
Mes photos. 18 avril.
http://img513.imageshack.us/img513/5043/img1228xh.jpg By martinmtl at 2012-04-18 http://img109.imageshack.us/img109/1052/img1225a.jpg By martinmtl at 2012-04-18 http://img862.imageshack.us/img862/3883/img1227h.jpg By martinmtl at 2012-04-18 |
Wow, already topped off. Montreal is on fire! When's the 20 floor phase going up?
edit: never mind just found the thread: http://forum.skyscraperpage.com/show...13#post5654213 |
|
|
Quote:
|
Wow thanks for the update! Now I really can't wait to see the effect the next phase will have. :tup:
|
Quote:
|
Quote:
|
|
Clean, modern, I like it. Thanks martin :tup:
|
I like it, but not so much the unaligned balconies, which remind me of the Cantlie hotel on Sherbrooke (I always mentally shuffle the misaligned balconies for harmony).
|
|
M9 Phase 4 will be absolutely incredible. I'm kind of lukewarm on phase 3 though.
|
Quote:
|
Quote:
|
Quote:
|
|
This one looks pretty much done to me.
M9 III by mr.John http://forum.skyscraperpage.com/show...62#post6013162 http://farm9.staticflickr.com/8231/8...23304023_b.jpg q (185) by JoPo2012, on Flickr http://farm9.staticflickr.com/8250/8...72cbbd2a_b.jpg q (182) by JoPo2012, on Flickr |
All times are GMT. The time now is 1:12 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.