Quote:
|
With the Premier's letter to the City of Calgary on wanting to talk about LRT to the airport, what do you think she's specifically talking about?
I'm kinda thinking it would be to go from Saddletowne to the airport vs building out the Green Line? |
Quote:
|
Quote:
|
Quote:
https://twitter.com/HomelessCalgary/...44986591641600 |
Quote:
I googled and came across the Airport Trail Funcitonal Planning Study but didn't find the infographic linked in the twitter post. Ps. That twitter account is ... something. |
Quote:
https://pub-calgary.escribemeetings....ab=attachments |
Quote:
|
Quote:
|
Quote:
|
Quote:
Looking forward to Route Ahead as suggested by accord1999, hopefully they have new/updated/better information when they release the update. |
Newark has a somewhat long people mover - 2 km from the closest terminal to rail transfer. JFK is 7.5 km to a major station, 5.3 km to a minor station (different spurs). Oakland is 5 km. Phoenix is 3 km.
One reason a higher speed, and very frequent, system is preferred is the distance. Hence automated light metro of some sort. |
Was the tunnel even designed for a possible transit option. And with the two interchanges built on Airport Tr, is there enough space to have rail transition to run along Airport Tr?
|
Quote:
|
^Of course we lose a traffic lane in each direction in the tunnel.
|
All times are GMT. The time now is 5:49 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.