JI5 Aug 6, 2008 7:49 AM

I park in the cityscape parking lot, and I can look into the site all day at work!!

HA-HA.

Vicelord John Aug 6, 2008 7:50 AM

Quote:

Originally Posted by JI5 (Post 3717238)
I park in the cityscape parking lot, and I can look into the site all day at work!!

HA-HA.

you mean you have another job outside of being a hostess? :haha: :P

combusean Aug 6, 2008 8:37 AM

Quote:

Originally Posted by kevininlb (Post 3715945)
:previous: Well, yeah, but aren't the apartments part of what's going up at PSP? And there are only a few apartments, right? I'm trying to remember -- I seem to recall these being part of low-rise buildings over retail, or something.

Sorry, I provided no insight, only thoughts.

Quote:

Originally Posted by article
In addition to the pour, construction of the new Jefferson Street entrance ramp to the Patriot’s Park garage and removal of the laser light tower is underway. Construction of the new park and associated surface improvements will commence in early 2009 and complete later that year.

I would assume that covers everything on the PSP block itself.

PD, props for that observation on the west side of the hole, etc. :tup:

PHX_PD Aug 6, 2008 9:49 AM

Update
 
http://i206.photobucket.com/albums/b...y/b2719e9e.jpg

combusean Aug 6, 2008 11:23 AM

^ Holy cow. She's getting up there. :)

PHX_PD Aug 14, 2008 12:50 PM

A quick look into the CityScape hole from tonight:

http://i206.photobucket.com/albums/b...y/480cf0f5.jpg

Luke Skyscraper Aug 14, 2008 1:17 PM

PHX PD
Thanks for the picture! I am curious about two things. It looks like they have covered the cement pad with dirt. I thought the pad would be the "basement floor". Will they pour another "floor"?
Does anyone know what they are doing on all the scaffolding around the sides? It seems quite labor intensive.

gymratmanaz Aug 14, 2008 1:40 PM

The scaffolding is to cement the interior of the parking garage. Couldn't really have all of those rebar poles sticking into the garage, the ones injected into the walls to secure the walls themselves.

phoenixboi08 Aug 15, 2008 2:14 AM

Quote:

Originally Posted by combusean (Post 3714072)
@#$!

The article's accompanying video was almost about to be cool until they completely dissed downtown's restaurant scene. We wonder why downtown has problems when we have people like this perpetuating its myths and woes.

LOL! You can blame the Teleprompter!:lmao:

AZ KID Aug 15, 2008 3:11 AM

After a rain like tonight what (if anything) happens in the cityscape hole. I would assume there is many puddles... are there any delays or do they go on like nothing ever happened?

PhxPavilion Aug 15, 2008 8:54 AM

The crane continued to work while it was raining so...

plinko Aug 15, 2008 7:02 PM

Quote:

Originally Posted by AZ KID (Post 3736654)
After a rain like tonight what (if anything) happens in the cityscape hole. I would assume there is many puddles... are there any delays or do they go on like nothing ever happened?

They just pump out the excess water using sump pumps into the city storm drain.

AZ KID Aug 15, 2008 9:58 PM

thanks

Luke Skyscraper Aug 22, 2008 1:27 PM

There have not been any new photos in over a week. Can any of you shutter bugs get us our photo "fix"?

PHX_PD Aug 23, 2008 10:55 AM

Yeah, I've been neglecting CityScape in favor of Central Park East. Still a big hole in the ground:

http://i206.photobucket.com/albums/b...y/IMG_3036.jpg

http://i206.photobucket.com/albums/b...y/IMG_3040.jpg

Luke Skyscraper Aug 23, 2008 2:00 PM

PHX PD,
Thanks! You are right, still a big hole (still with lots of dirt). It will be quite awhile before this gets above ground.

AZ KID Aug 26, 2008 4:11 AM

I know we can tell but the permit for the construction of the core and shell was submitted.

Permit# BLD-T484344 Issue Date Expires 8/21/10
Permit Description SHELL AND CORE FOR OFFICE TOWER
Project 06-5309 CITYSCAPE

--------------------------------------------------------------------------------

Address 1 E WASHINGTON ST 85004 Zoning
L 1 B * REPLAT OF BLOCK 22 QS Q10-28 APN 112-27-125 Dist 08

--------------------------------------------------------------------------------

Description/Scope of Work: COMMERCIAL NEW

neworleans Aug 29, 2008 11:42 PM

does anyone know why they covered the cement floor with dirt?

andrewkfromaz Sep 3, 2008 5:04 PM

Quote:

Originally Posted by neworleans (Post 3767727)
does anyone know why they covered the cement floor with dirt?

It's a heck of a lot cheaper than concrete. The project's structural engineers said that you need a foundation (a "mat," I believe) at a certain depth to support a building at a certain height. The bottom of the floor of the garage only needs to be a certain depth, so they fill in dirt in between.

gymratmanaz Sep 3, 2008 6:30 PM

AND NOW THERE IS A NICE CEMENT FLOOR OVER MOST OF THE DIRT. oops, sorry about caps.