SACRAMENTO | Kimpton Sawyer Hotel | 230 FT | 16 FLOORS
Quote:
http://www.sacbee.com/news/local/new...%20Studios.jpg http://www.sacbee.com/news/local/new...Studios%20.jpg http://www.sacbee.com/news/local/new...Studios%20.jpg |
So this will be along J Street? Those last two renders make it look really nice, but the first two are questionable. This one will certainly depend upon the materials used and the finishes on the work. This could end up looking pretty amazing, or pretty bad. Being born and raised in Sactown, I'll hold out for pretty amazing.
|
That's pretty slick. It will really help fill in the streetwall on J St.
|
A few more renderings from the arena website:
http://sacramentoesc.com/wp-content/...le-Studios.jpg http://sacramentoesc.com/wp-content/...4/06/View3.jpg http://sacramentoesc.com/wp-content/...4/06/View2.jpg http://sacramentoesc.com/wp-content/...4/06/View4.jpg These tweets have some pictures of the model at the planning and design commission hearing. I'm not totally sold on the design/massing of the building myself, but glad to see this will essentially be built with the arena and complete the site at the same time. https://twitter.com/RideDowntown916/...35075087597568 https://twitter.com/RideDowntown916/...45226070843392 Also, height should be 230'. My mistake. |
Very nice. It'd be great to see the Vanir tower get going as well
|
Under Construction
Webcam: http://www.golden1center.com/live/ https://c2.staticflickr.com/8/7201/2...4cb12b3d_h.jpg |
Taken Monday, 8/1/2016.
https://c1.staticflickr.com/9/8082/2...5569a734_h.jpgIMG_1352 by ltsmotorsport, on Flickr |
Great to see some highrise construction again in downtown Sacramento! From that aerial shot, it looks like some of the low-rise (presumably) historic buildings along the K-Street mall are getting rehabbed.
|
Yeah, that's the 700 block of K Street which is becoming this:
http://godowntownsac.com/wp-content/...treet-View.jpg http://1.bp.blogspot.com/-rXgUXerzVO...BBlock%2B2.jpg http://kuchman.com/wp-content/upload...0-block-03.jpg http://downtownsac.org/wp-content/up...uds.So_.4.jpeg |
|
Update courtesy of forumer downtownserg89 from the Sacramento sub.
Quote:
|
^ Nice pics and I drive by that site almost every day and it looks like one or two more floors to top off, its amazing the work going on around the Golden One Center and I believe that this will lead to something bigger..
Oh btw when I get family and friends in from Colorado, Illinois and other places I always take them for a downtown tour.:) |
Gotta bump this one as it looks as if they're up to the final floor..
|
It's definitely close to topping out, but still a ways out to opening...
http://www.sacbee.com/news/local/cit...120417153.html |
Downtown hotel tower topped out, crane coming down this week
Mar 6, 2017 Ben van der Meer Staff Writer Sacramento Business Journal Downtown Sacramento’s newest high-rise has topped out, and one of the construction cranes serving it will come down later this week. On Friday through Sunday, a portion of J Street along the Kimpton hotel tower project north of Golden 1 Center will be closed to allow one crane to be removed. The 16-story hotel tower, which includes top-floor condominiums, some office space and several retail spaces on the first two floors, is still set to open this summer. A news release from the Sacramento Kings, which developed neighboring Golden 1 Center, announced the pending crane removal. JMA Ventures LLC and the Kings are the developers for the 250-room Kimpton tower, while Swinerton Builders is the general contractor. ... http://www.bizjournals.com/sacrament...ming-down.html |
Photos: Construction crane is removed in downtown Sacramento
Mar 13, 2017 Dennis McCoy Photo Editor Sacramento Business Journal One of the construction cranes serving downtown Sacramento's newest high-rise came down over the weekend. Check out these photos for a look at Saturday's action. On Friday through Sunday, a portion of J Street along the Kimpton hotel tower project north of Golden 1 Center was closed to allow the crane to be removed. The 16-story hotel tower, which includes top-floor condominiums, some office space and several retail spaces on the first two floors, is set to open this summer. http://www.bizjournals.com/sacrament...-downtown.html https://media.bizj.us/view/img/10376241/dsc0606a.jpg |
|
^ This really turned out to be a nice looking project which fits perfectly into the downtown fabric.:cheers:
|
All times are GMT. The time now is 1:03 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.