Urbannizer Jun 13, 2009 11:03 PM

HOUSTON | MD Anderson Administrative Support Building | HEIGHT | 25FL
 
I realized that the on-going construction of new buildings in the TMC, there are no threads of the buildings here.

MD Anderson Administrative Support Building
http://i177.photobucket.com/albums/w...DSC01978-1.jpg
Architect: WHR
Developer: M.D Anderson
Construction Start: August 08
Construction end: December 2012
Cost: 350 Million
Constructer: Vaugh Construction

Article

Quote:

The University of Texas M.D. Anderson Cancer Center proposes to construct the
Administrative Support Building, which will provide office space for occupants currently located
on the Main Campus and various lease sites, as well as new incremental space to support
institutional growth projections. This project constructs the shell and core of approximately
1,368,600 gross square feet and the build-out of approximately 374,000 net assignable square
feet (NASF), with the remaining 521,612 NASF shelled for future tenant build-out.
Most of the photos are by Wattleigh her on SSP.

November 9th, 2008
http://i177.photobucket.com/albums/w...n/DSC02243.jpg

February 11th, 2009
http://farm2.static.flickr.com/1155/...a72fb983_o.jpg
Flickr Phtolitherland
Quote:


Mat Pour at Houston Medical Facility is State's Largest


Baker Concrete Construction project manager Garrett Benson recently helped coordinate the biggest mat pour he has ever seen. For that matter, it was the biggest mat pour the Houston office of Baker Concrete had ever done.

If research holds true, its the biggest such project ever in Texas and only the second largest in the nation behind the Venetian Hotel in Las Vegas.

Baker Concrete Construction, headquartered in Monroe, Ohio, together with Vaughn Construction of Houston, completed the larger of two mat pours for The University of Texas System, M.D. Anderson Cancer Center Administrative Support Building in Houston. The size of the mat, itself, is more than 21,000 cubic yds, Benson told Texas Construction.

Baker completed the first pour - 4,000 cu bicyds - at a rate of 570 cubic yds per hour. The larger second pour, completed totaled 17,500 cubic yds, and 100 Baker co-workers pitched in to complete the job in less than 24 hours, at a rate of 730 cubic yds per hour.

The entire project involved seven pump trucks, 97 concrete trucks, 1,960 tons of installed rebar, and 2,400 man-hours.

The biggest challenge was a matter of coordination, Benson says. We were working 24 hours straight. We were trying to coordinate seven different pumps that have to move to different locations we were making the pour.”

Benson says it is bringing 92 trucks from five or six different batches and keep a consistent flow was no easy logistical feat. He says he coordinated more than 100 workers.

You have to keep in mind that you can’t let concrete get too far out in front of you, he says. You can only pour one ft an hour and you have to make sure that concrete you have sitting 50 yds in front of you does'nt get old before you get to it. You have to get the pump trucks going and not leave any one pump truck sitting without working. That was another logistical concern.”We have to get all this done while still being safe, Benson adds.

Although originally designed to be completed in three separate pours, the hurricane season amended that plan, and New Caney-based Jayco, the rebar subcontractor, worked overtime to complete the installation of steel. That efficiency enabled Baker to merge the second two pours and complete the job early.

The sheer scale of the second pour required detailed logistical planning by team members with Baker; Vaughn; Haynes Whaley of Houston, the engineer of record; WHR of Houston, the architect; and consultants Earth Engineering of East Norriton, Penn; Ulrich Engineers of Houston; and Carrasquillo Associates Ltd. of Austin.

For the job Baker managed a concrete temperature monitoring system that used thermo couplers to record the temperature of the material as it cured. The specifications called for the concrete mix to reach a temperature in the core no higher than 140 degrees Fahrenheit. No two points in the mat could have a temperature difference of more than 40 degrees.

The thermo couplers were located throughout the mat at various depths, and were monitored twice a day for 28 days. The monitoring system allowed Baker to better control the curing process utilizing winter blankets, and ultimately resulted in zero thermal cracks.

The M.D. Anderson Cancer Center Administrative Support Building is scheduled for completion in 2012. Baker has started the concrete work for the structure.

http://i294.photobucket.com/albums/m...erson-BLDG.jpg
http://texas.construction.com/news/building/default.asp


June 8th, 2009
http://i218.photobucket.com/albums/c...s/DSC05462.jpg

http://i218.photobucket.com/albums/c...s/DSC05467.jpg

TexasPlaya Jun 15, 2009 6:00 AM

Not seeing a parking structure? Pretty unusual for Houston and the Med Center.

photoLith Jun 15, 2009 5:24 PM

Since I last went by there in February that building you took a photo of has popped up. Glad to see the stuff actually going through. The TMC is going to be huge in the future. Last time I was there it looked like Dubai with all the construction cranes everywhere.

Thymant Jun 21, 2009 8:38 PM

Quote:

Originally Posted by TexasPlaya (Post 4306733)
Not seeing a parking structure? Pretty unusual for Houston and the Med Center.

I Think thats a good thing, it seem as though more space would be saved if parking structures were shared or put inside of buildings.

Wattleigh Jul 27, 2009 2:52 PM

Quote:

Originally Posted by Thymant (Post 4318740)
I Think thats a good thing, it seem as though more space would be save if parking structures were shared or put inside of buildings.

That's the way most of the garages already are in the TMC, specifically for the space saving reason.

Anyway, here are a few photos from yesterday.

http://i218.photobucket.com/albums/c...s/DSC06110.jpg

http://i218.photobucket.com/albums/c...s/DSC06113.jpg

Bertner St. Expansion -Southbound
http://i218.photobucket.com/albums/c...s/DSC06114.jpg

Northbound
http://i218.photobucket.com/albums/c...s/DSC06116.jpg

http://i218.photobucket.com/albums/c...s/DSC06127.jpg

http://i218.photobucket.com/albums/c...s/DSC06130.jpg

http://i218.photobucket.com/albums/c...s/DSC06132.jpg

http://i218.photobucket.com/albums/c...s/DSC06133.jpg

Complex01 Jul 27, 2009 5:10 PM

Starting to take a nice shape. Looks good...

Wattleigh Nov 4, 2009 7:53 AM

Somewhat of a distant shot from the Chase Tower from earlier this week...

Pardon the quality, somewhat hard when your shooting in the general direction of the sun.
http://i649.photobucket.com/albums/u...onASB11209.jpg

KevinFromTexas Nov 4, 2009 6:53 PM

Has anyone found a height for this building?

Wattleigh Nov 23, 2009 7:29 PM

Here are some photos from yesterday afternoon.

View from the west
http://i649.photobucket.com/albums/u...s/DSC06780.jpg

View from the south
http://i649.photobucket.com/albums/u...s/DSC06816.jpg

Entrance Area
http://i649.photobucket.com/albums/u...s/DSC06817.jpg

View from the north
http://i649.photobucket.com/albums/u...s/DSC06808.jpg

http://i649.photobucket.com/albums/u...s/DSC06788.jpg

http://i649.photobucket.com/albums/u...s/DSC06794.jpg

Two more tower cranes at the site
http://i649.photobucket.com/albums/u...s/DSC06809.jpg

shakman Nov 23, 2009 8:24 PM

:previous: Parking garage?

Is this structure part of the Texas Medical campus?

SouthmoreAve Dec 7, 2009 2:31 AM

Quote:

Originally Posted by shakman (Post 4574075)
:previous: Parking garage?

Is this structure part of the Texas Medical campus?


Yeah, im thinking about that too. It looks like its near TMC, but not exactly in it. Unless, TMC has extended boundaries.

Dan Denson Dec 7, 2009 3:45 AM

This is going to be a great looking building.

SouthmoreAve Dec 15, 2009 2:13 AM

Update by Jax from HAIF.

http://i324.photobucket.com/albums/k...%20Up/1-10.jpg

http://i324.photobucket.com/albums/k...g%20Up/2-4.jpg

SouthmoreAve Dec 23, 2009 3:40 PM

Photolitherland Update....
http://i324.photobucket.com/albums/k...%20Up/TMC1.jpg