Architype Mar 13, 2012 5:25 AM

[St. John's] 351 Water Street | 12 Floors | U/C
 
351 Water Street, East Port Properties - Woolworth's Site Office Development
11-12 stories, 46.6 meters (top of mech. penthouse), 6 parking levels, retail and about 160,000 sq ft of class A office space.

Developers website: http://threefiftyone.ca/

This project is already under construction.

The development will front on Water Street and Harbour Drive.

Announced Feb 4th, 2010; this is an office/retail/parking development on the old Woolworth's Dept. Store site.



View from Harbour Drive
Source: http://threefiftyone.ca/


Building Heights
From Harbour Drive, From Water Street
Parking Levels 19.1 metres, 15.5 metres
Office Levels 24.1 metres, 24.1 metres
Total to main roof parapet - 43.2 metres, 39.6 metres
Top incl. mech penthouse, Water Street - 43.0
Top incl. mech penthouse, Harbour Drive - 46.6 metres

Source: Land Use Assesment Report for 351 Water Street:
http://www.stjohns.ca/pdfs/1832-01%2...20May%2028.pdf

Mike K. Mar 13, 2012 5:33 AM

Cool :) Btw, for ease of readability I've changed to prefix to [St. John's] and title to [St. John's] 351 Water Street | 12-floors | Proposed to coincide with the thread naming guidelines in place in SSP:Locals. What do you guys think?

Architype Mar 13, 2012 5:36 AM

Good, thanks. :)

jeddy1989 Mar 13, 2012 1:37 PM

Looks good, now we just need some pictures of the progress

Marty_Mcfly Mar 13, 2012 2:09 PM

There are a few construction pictures floating around the St. John's general thread, I'll check for them after. Progress has been going slowly on the site for months now, though I suspect this is due to the complexity of the grade and requirements for the parking garage.

PoscStudent Mar 13, 2012 2:55 PM

Quote:

Originally Posted by Marty_Mcfly (Post 5625358)
There are a few construction pictures floating around the St. John's general thread, I'll check for them after. Progress has been going slowly on the site for months now, though I suspect this is due to the complexity of the grade and requirements for the parking garage.

I was wondering if the sea water heating and cooling system was to blame for the length it's taking to see real progress? I assume that's something they'd need to get done early.

Marty_Mcfly Mar 13, 2012 3:00 PM

Quote:

Originally Posted by PoscStudent (Post 5625404)
I was wondering if the sea water heating and cooling system was to blame for the length it's taking to see real progress? I assume that's something they'd need to get done early.

I was thinking that as well. Such things require intense drilling on site, which we know is a difficult task here in Newfoundland. However, once all that is done and they start adding floors, I imagine things will go much quicker (like the MUN residence houses).

PoscStudent Mar 13, 2012 4:28 PM

They had those huge pipes too coming from the ground, I don't know what they were for exactly but there's nothing like them at the Fortis site.

Marty_Mcfly Mar 14, 2012 12:44 AM

Quote:

Originally Posted by PoscStudent (Post 5625555)
They had those huge pipes too coming from the ground, I don't know what they were for exactly but there's nothing like them at the Fortis site.

I'm not sure what those were, but my girlfriend was going on about how those pipes needed anti-corrosion coverings, as her masters in chemistry is about such things. With the Harbour Drive floor being taken care of at this moment, I'd guess that once everything is set and done at that point, the other 11 floors will follow quickly.

Trend CJ Mar 16, 2012 1:05 AM

The pics are on Page 171 of the St John's thread. The huge piles they were driving for most of 2010 were for foundation support. That lot is all fill of various ages. I think it took longer than expected to reach solid footing for a building the size of what is going there.

upnotout Mar 20, 2012 2:26 AM

Just drove by 351 this afternoon. Very busy today. I saw at least ten people as I drove by.

techie Mar 21, 2012 9:00 PM

I believe the 300 tonne crane is arriving onsite next week, and the pre cast blocks are going to start arriving in the first week of April. It should start gaining steam quickly now.

PoscStudent Mar 21, 2012 9:22 PM

There's something concrete built up in the centre of the site.

Marty_Mcfly Mar 22, 2012 2:18 AM

Quote:

Originally Posted by PoscStudent (Post 5636326)
There's something concrete built up in the centre of the site.

Probably the concrete supports that'll be in the building for the parking garage? I hope to get downtown sometime soon (after classes are done) to take pictures of this, Fortis, Star of the Sea and other things.

Architype Mar 22, 2012 4:56 AM

Quote:

Originally Posted by PoscStudent (Post 5636326)
There's something concrete built up in the centre of the site.

It may be the service core which will contain the elevator shafts, most likely the stairwells and other vertical servicing shafts.
The plans suggest that the same elevators will be used for both parking and office floors.

AllBlack Mar 22, 2012 3:06 PM

The site is looking much more organized now. Scrap/junk has been hauled away, the 1st floor garage walls are just about complete on the east and west sides, and much of the ground has been compacted inside. Glad to see that things will soon starting looking "up".

AllBlack Mar 22, 2012 4:34 PM

Signs are posted downtown, closing Harbour Drive March 26 thru March 28.

Assuming this means the arrival of precast panels..?!? :cool:

techie Mar 22, 2012 11:53 PM

That's just for crane setup. The precast will be arriving over a 6-8 week period.

statbass Mar 23, 2012 12:13 AM

Quote:

Originally Posted by techie (Post 5638003)
That's just for crane setup. The precast will be arriving over a 6-8 week period.

Exciting times folks! I can't wait to see the progress over the coming months... :D

Architype Mar 23, 2012 4:53 AM

Quote:

Originally Posted by techie (Post 5638003)
That's just for crane setup. The precast will be arriving over a 6-8 week period.

The crane will be the tallest structure around, for awhile, if it's a real crane.