Burnaby Updates
This is an imperfect and incomplete list of projects and developments going on in Burnaby, if you know of any other proposals or developments, add them to the discussion and I will edit them into the list!:cheers:
Thanks! Highrise - Metroplace - UNDER CONSTRUCTION Excavation has started 141 meters, 46 floors http://farm7.static.flickr.com/6086/...694c749834.jpg http://www.vancitybuzz.com/2011/04/a...of-the-future/ Sovereign - UNDER CONSTRUCTION Excavation nearly complete 156 meters, 45 floors http://farm7.static.flickr.com/6184/...ba6cf49b_b.jpg http://money.ca.msn.com/banking/home...8931570&page=8 Chancellor - UNDER CONSTRUCTION Parking levels under construction 110 meters, 37 floors http://farm7.static.flickr.com/6205/...da9cd526_b.jpg http://www.vancouver-real-estate-dir...cellor-condos/ Affinity I & II - UNDER CONSTRUCTION Phase 1 completion in January, Phase 2 shortly after in the spring. 26 floors and 31 floors respectively http://a1.sphotos.ak.fbcdn.net/hphot..._2987594_n.jpg http://www.vancouver-real-estate-dir...by%20BOSA.html 4394 Beresford - PROPOSED 127 meters, 38 floors No status information available No rendering available The MET - PROPOSED 120 meters, 35 floors No status information available No rendering available Wilson Avenue - PROPOSED No work has started as of yet 102 meters, 30 floors http://farm7.static.flickr.com/6087/...63493f2c_b.jpg http://www.flickr.com/photos/62438577@N06/5680924162/ Station Square Redevelopment - PROPOSED Under consideration by council http://farm7.static.flickr.com/6196/...e2168a6d_b.jpg https://burnaby.civicweb.net/Documen....aspx?ID=11836 Metrotower III - ON HOLD Still on hold, parking garage complete. No work has been done since 2009-10 107 meters, 27 floors http://farm7.static.flickr.com/6197/...7f99845fa6.jpg http://www.emporis.com/building/metr...burnaby-canada Reflections - UNDER CONSTRUCTION No idea how far along construction has progressed as of right now. 100 meters, 33 floors http://farm7.static.flickr.com/6063/...7c6945bd62.jpg http://homes.mitula.ca/homes/for-sal...nhouse-burnaby Vantage - UNDER CONSTRUCTION Just a few floors completed 111 meters, 33 floors http://farm7.static.flickr.com/6084/...f846f3d7ce.jpg http://adam-goss.myrealpagewebsite.c...tails-19853413 Brentwood Crossing (SOLO district) - PROPOSED 125 meters, 29 floors http://farm7.static.flickr.com/6198/...a8602c8d_b.jpg http://www.dikeakos.com/projects/High-Rise/all/BRE Lowrise - No info on lowrise projects yet Institutional - MultiSport Centre - UNDER CONSTRUCTION http://media.bclocalnews.com/images/...er_signage.jpg http://www.bclocalnews.com/greater_v...130310673.html Anyone can add to the list any time! Be my guest :) |
if anyone has a program that allows them to do the diagrams to put on the building pages for Sovereign, Chancellor and Metroplace, it would be much appreciated if you could do so :D
I tried the other day, apparently the moderators didn't like my drawing of sovereign :P |
Apparently they have chosen to rename Brentwood Crossing to "SOLO District" as stated in the Sept 20th Burnaby public hear minutes. As for Reflections, the tower crane came down a month ago, its moving quick.
|
Any info on the proposed redevelopment of Brentwood mall?
|
Why do you have Station square "up to or exceeding 200m"?
That would necessitate floor heights of 3.5m, well above the industry standard for residential. The tallest of the towers will likely come in at a very respectable 170-180m. |
For Station Square there is actually no proposal beyond "phase 1" which is a much smaller tower. I read through the proposal and it only seems to state that the CD zone would allow "up to 57 storeys" which is a lot different than a concrete proposal. I wouldn't get my hopes too high yet. It is more of a conceptual proposal for the area rather than an actual proposal from a development company. Think enhance land use plan. The odds it will happen are quite low in my opinion.
And even at 57 storeys like ^^ pointed out, that would put it even with maintenance around 180 meters at maximum. That's still bumping closer to 600 feet. |
:previous:I really hope you are just being a debbie downer. That said, it would be nice to see a project one day commence with one of the taller towers instead of always the shortest.
|
:previous: As I said before, the list is imperfect and incomplete. I'll correct the mistakes later today :)
|
Quote:
|
Quote:
I'd love to see it happen though don't get me wrong. It does sound like there is development backing for tower 1 though which is better than nothing especially since that block beside Metrotown is really lacking. Any densification of Metrotown itself is good for Burnaby. |
as for civic or community projects - that big sports centre complex is back on track now - i put a news article with a render in the suburban updates thread...
nice compiling :) |
Nice work guys
|
Affinity Phase 1 & Phase 2 - UNDER CONSTRUCTION
Phase 1 completion in January, Phase 2 shortly after in the spring. 26 floors and 31 floors respectively http://a1.sphotos.ak.fbcdn.net/hphot..._2987594_n.jpg http://www.vancouver-real-estate-dir...by%20BOSA.html |
|
Quote:
|
:previous:Any idea regarding its height or floor count?
|
Quote:
annnd the new(ish) proposal at 4394 Beresford is 38 floors and approx. 130 meters :D Yayyy Burnaby! |
I believe that was their old proposal its now 35 floors
http://www.bclocalnews.com/greater_v...124364059.html |
:previous: oh poopy! Well, meh.
Aaaanyways, added a diagram for "The Sovereign" building page. If someone could, it would be awesome if you could make one for the Chancellor and Metroplace. I definitely do not have the skills to do that haha. |
Quote:
|
All times are GMT. The time now is 9:01 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.