|
Great work, Vike.
The future's looking good. |
do your thing, Winterpeg.
|
Nice rundown. I like Edgewater on Wellington.
|
Excellent job Vike.
|
Very clean and well put together Mr. Viking. *Borat*, VERY NICE!
|
Thanks TV for such a good rundown of the city projects.
There is alot of good projects in the works... momentum is definatly building. :tup: |
Only place I could think of to post this question: a number of years ago I remember hearing that there was going to be some residential development above the Downtown YM-YWCA at 301 Vaughan St? Does anyone remember if this ever happened, and if so, what they are calling the development? I was trying to do some searches online and didn't find anything. Thanks...
jonathanlund@me.com |
list updated after long last....completed projects removed.
|
What's the tower behind The Bay? Was that part of their MB Hydro proposal?
|
Woo Winnipeg finally gets a spot in the city compilations forum. Nicely done!
Lol at the Neechi centre btw, I wonder what context the word is being used. |
Winnipeg is growing
Amazing all the things that are going on. When you live Downtown you see the construction but don't realize the ramifications. Many people fear the
Downtown but in actuality it's no different than anywhere else. The buildings make the skyline and the skyline makes the city. Some of these projects are world class and being downtown only amplifies the experience. |
Took this today of the CMHR. As you can see the window frames (along the bottom) are being installed and the peace tower construction has started
http://img.photobucket.com/albums/v5...CMHR-727-A.png |
see below
|
see below
|
Great list of projects. Amazingly 5 years worth on one page.
|
see below
|
WINNIPEG CONSTRUCTION
http://1.bp.blogspot.com/-Danpy0JWE7...0/winnipeg.jpg source: http://1.bp.blogspot.com/-Danpy0JWE7...0/winnipeg.jpg Winnipeg Development Map: https://maps.google.ca/maps/ms?hl=en...92dcf0aa5e81c7 Previous construction threads: Winnipeg Construction 7 Winnipeg Construction 6 Winnipeg Construction 5 Winnipeg Construction 4 Winnipeg Construction 3 Winnipeg Construction 2 Winnipeg Construction 1 ------------------------------------------------------------------ UNDER CONSTRUCTION RESIDENTIAL 300 Assiniboine Ave 300 Assiniboine Ave. Use: Residential Height: 28 floors + townhouses Website: http://crystalproperties.ca/home/300assiniboine/ Estimated Completion: 2016 http://crystalconstruction.ca/home/w...d2-490x700.jpg source: http://crystalconstruction.ca/ YouCube - Phase 2 1 Heaton Avenue Use: Residential Height: 4 floorsWebsite: http://www.youcubecondos.com Estimated Completion: 2015 http://5468796.ca/images/youcube/01_yc.jpg source: http://5468796.ca building one + two 125 Cauchon Street Use: Residential Height: 4 floors Website: http://2architecture.ca Estimated Completion: 2014/2015 http://static.squarespace.com/static...pg?format=750w source: http://2architecture.ca Bag Factory Apartments 311 Alexander Ave. Use: Residential Height: 6 floor heritage re-development Website: http://sandhudevelopments.com/ Estimated Completion: Fall 2014 http://sandhudevelopments.com/images...ory-street.jpg source:http://sandhudevelopments.com/ Conrad House 522 River Use: Residential Height: 4 floors Website: http://www.lountcorp.com Estimated Completion: Unknown http://www.lountcorp.com/sites/defau...?itok=LDvgFFBA source: http://www.lountcorp.com Fort Rouge Rail Yards - Phase 1 661 Argue St Use: Transit Oriented Development Height: Varying, up to 25 floors Website: http://fortrougeyards.com/ Estimated Completion: Unknown https://fbcdn-sphotos-f-a.akamaihd.n...4a1d915303c8fb source: https://www.facebook.com/TheYardsatFortRouge/ Glasshouse Skylofts 309 Hargrave St. Use: Residential Height: 21 floors Website: http://glasshousewinnipeg.com Estimated Completion: 2014 http://storage.canoe.ca/v1/dynamic_r...y=80&size=650x source: http://canoe.ca Village Junction 369 Stradbrook Ave. Use: Residential Height: 4 floors Website: http://www.villagejunction.ca Estimated Completion: 2015 http://villagejunction.ca/wp-content...nder_large.jpg source: http://www.villagejunction.ca OFFICE New Winnipeg Police Service Headquarters 266 Graham Ave. Use: Office Height: 10 floors Website: http://www.winnipeg.ca/police/ Estimated Completion: 2014 http://media.winnipegfreepress.com/images/4150770.jpg source: http://www.winnipegfreepress.com SERVICE/RECREATION ALT Hotel + Stantec Offices 311 Portage Ave. Use: Hotel/Office/Residential Height: 20 floors Website: http://www.groupegermain.com/en/media-alt-winnipeg.asp Estimated Completion: Unknown http://media.winnipegfreepress.com/images/3813491.jpg source: www.winnipegfreepress.com HSC Women's Hospital Health Sciences Centre Use: Medical Height: 4 floors Website: http://www.hsc.mb.ca/ Estimated Completion: 2014 http://www.dhneill.com/documents/Womens_Hospital.jpg source: http://www.dhneill.com/ HSC Diagnostic Centre Health Sciences Centre Use: Medical Height: 7 floors Website: http://news.gov.mb.ca/news/index.html?item=12689 Estimated Completion: Spring 2014 http://www.cbc.ca/gfx/images/news/ph...20-helipad.jpg source: http://www.cbc.ca/gfx/images/news/ph...20-helipad.jpg Seasons of Tuxdeo Kensaton Blvd/Sterling Lyon Pwky Use: Retail/Entertainment Height: 1.5 million sq ft. commercial space (incl. Winnipeg's first IKEA) Website: Estimated Completion: build out over several years http://media.winnipegfreepress.com/i...82H3001086.jpg source: http://media.winnipegfreepress.com/i...82H3001086.jpg Winnipeg Convention Centre expansion Two surface parking lots South and South-east of current Convention Centre Use: Entertainment Height: Unknown Website: Unknown Estimated Completion: 2015 http://storage.canoe.ca/v1/dynamic_r...y=80&size=650x source: http://storage.canoe.ca/v1/dynamic_r...y=80&size=650x EDUCATIONAL U of M Active Living Centre University of Manitoba (Main Campus) Use: Recreational Size: 100,000 Square Feet Website: http://umanitoba.ca/admin/dev_adv/wh...ng_Centre.html Estimated Completion: Unknown http://media.winnipegfreepress.com/images/2872910.jpg source: http://media.winnipegfreepress.com/images/2872910.jpg TRANSPORTATION - ------------------------------------------------------------------ PROPOSED RESIDENTIAL Fortress development 345 Graham Ave. Use: Residential/Office Height: 42 storeys Website: http://www.liveworkplaywinnipeg.com Estimated Completion: unknown http://media.winnipegfreepress.com/i...S_16901686.jpg source: http://www.winnipegfreepress.com d Condo 390 Assiniboine Ave. Use: Residential Height: 24 storeys Website: http://www.dcondo.ca Estimated Completion: Spring 2015 http://www.sandhudevelopments.com/im...do_streeta.jpg source: http://www.sandhudevelopments.com University of Winnipeg Commons U Winnipeg Campus - south of the Buhler Centre between Good St and Colony St Use: Residential Height: 14 storeys Website: http://news-centre.uwinnipeg.ca/all-...medium=twitter Estimated Completion: Fall 2015 http://news-centre.uwinnipeg.ca/wp-c...verviewWEB.jpg source: http://news-centre.uwinnipeg.ca/ 226 Osborne North 226 Osborne St. N Use: Residential/Office Height: 10 floors Website: http://www.inlett.com/properties/loc...g-osborne.html Estimated Completion: Unknown http://www.inlett.com/properties/images/226main2.jpg source: http://www.inlett.com/properties/images/226main2.jpg 267 Sherbrook St. 267 Sherbrook St. Use: Residential Height: 14 floors Website: http://sotirioscorp.com/projects/267-sherbrook Estimated Completion: Unknown http://distilleryimage1.ak.instagram...47b2ae3d_8.jpg source: instagram.com/jovanlottis Loftworks 120/128 James Ave. Use: Office/Residential Height: 3 floor addition to 3 floor building + proposed new 8 floor condo Website: Unknown Estimated Completion: Unknown http://wfpquantum.s3.amazonaws.com/i...txt-538854.jpg source:http://wfpquantum.s3.amazonaws.com/i...txt-538854.jpg 62m 62 Macdonald Ave. Use: Residential Height: 3 floors Website: http://www.62m.ca Estimated Completion: Unknown http://ad009cdnb.archdaily.net/wp-co...io-528x299.jpg source: http://www.archdaily.net 316 Ross Ave Addition 316 Ross Ave. Use: Residential Height: 5 floor heritage re-development + additionWebsite: http://www.sm-arc.com/projects/displ...2/316-ross-ave Estimated Completion: Unknown http://www.sm-arc.com/uploads/projec...g?t=1390495737 source:http://www.sm-arc.com/ Shipping Container apartments 956 Notre Dame Ave. Use: Residential Height: 6 floors Website: - Estimated Completion: Unknown http://www.davidpennerarchitect.ca/a.../sea-can-3.jpg source: http://www.davidpennerarchitect.ca/a.../sea-can-3.jpg 290 River Condos 290 River Ave Use: Residential Height: 3 floors Website: http://290rivercondos.ca Estimated Completion: 2015 http://d2kcmk0r62r1qk.cloudfront.net...ver_condos.png source: http://www.buzzbuzzhome.com 583 Stradbrook Ave. 583 Stradbrook Ave. Use: Residential Height: 5 floors Website: unknown Estimated Completion: unknown http://static.squarespace.com/static...pg?format=750w source: http://waltercorp.com/ h2o two 500 Waterfront Drive Use: Residential Height: 4 floors Website: http://h2owaterfront.com Estimated Completion: Unknown http://condospot.ca/wp-content/uploa...t-drive-01.jpg source: http://condospot.ca 398 Wardlaw Ave. 398 Warlaw Avenue Use: Residential Height: 4 floors Website: http://2architecture.ca Estimated Completion: 2015 http://static.squarespace.com/static...g?format=1000w source: http://2architecture.ca Gas Station Theatre re-development 445 River Ave. Use: Arts/Residential Height: 9 floors Website: http://palwinnipeg.org/ Estimated Completion: Unknown http://i.imgur.com/G5jnPkz.png source: http://winnipeg.ca 373 River Ave 373 River Ave. Use: Residential Height: 4 floors Website: unknown Estimated Completion: Unknown http://i.imgur.com/yOrUWQ4.png source: http://winnipeg.ca District Condominiums 140 James Ave/139 Market Ave/145 Market Ave Use: Mixed-use (residential/commercial) Height: Varied Website: http://www.districtcondos.ca Estimated Completion: Unknown http://www.maxxon.ca/project_spotlig...ndominiums.jpg source: http://www.districtcondos.ca Mayfair Condos NW Corner of River and Mayfair Use: Mixed-use (residential/commercial) Height: 4 floors Website: unknown Estimated Completion: Unknown https://fbcdn-sphotos-a-a.akamaihd.n...83125284_o.jpg source: https://www.facebook.com/villagejunction 570 Stradbrook 570 Stradbrook Ave Use: Residential Height: 4 floors Website: http://www.570stradbrook.com Estimated Completion: Unknown http://static.squarespace.com/static...pg?format=750w source: http://www.570stradbrook.com 95 Maryland 95 Maryland St Use: Mixed-use (residential/commercial) Height: 4 floors Website: unknown Estimated Completion: Unknown http://www.sm-arc.com/uploads/projec...g?t=1405108653 source: http://www.sm-arc.com West Broadway Gardens 198 Sherbrook St Use: Mixed-use (residential/commercial) Height: 4 floors Website: unknown Estimated Completion: Unknown http://i.imgur.com/Yfnp2yo.png source: http://i.imgur.com/Yfnp2yo.png Urban Glo 18-22 Picardy Pl Use: Residential Height: 3 floors Website: http://urbanglocondos.ca/ Estimated Completion: Unknown http://s3.amazonaws.com/mrp-listings...630ab4dd0.jpeg source: http://urbanglocondos.ca/ Banana Boat Re-development 390 Osborne St Use: Residential Height: 3 floors Website: unknown Estimated Completion: Unknown http://www.dinprojects.ca/wp-content...Banana-001.jpg source: http://www.dinprojects.ca/ 250 Marion 250 Marion St. Use: Mixed-use Height: 4 floors Website: http://www.nisumdevelopments.com/250-marion.html Estimated Completion: Unknown http://cdn.realtor.ca/listing/reb7/h...24915096170000 source: http://urbanglocondos.ca/ OFFICE Bond Tower 151 William Stephenson Way Use: Office Height: 11 floors Website: http://www.5468796.ca Estimated Completion: Unknown http://www.5468796.ca/images/bond_to...render_324.jpg source: http://www.5468796.ca/images/bond_to...render_324.jpg So/Po Square Graham Ave between Hargrave St and Carlton St Use: Office/Hotel/Possible residential Height: 3 buildings, various heights (up to 19 floors) Website: http://www.soposquare.com/ Estimated Completion: Unknown http://media.winnipegfreepress.com/images/4813130.jpg source: http://www.winnipegfreepress.com SERVICE/RECREATION CanadInns McPhillips Street Station Hotel 484 McPhillips St. Use: Hotel/Entertainment Height: 17 floors Website: http://www.canadinns.com/stay/stay-m...entry_id=12737 Estimated Completion: Early 2013 http://blog.cheapoair.ca/image.axd?p...peg+Hotels.jpg source: http://blog.cheapoair.ca/image.axd?p...peg+Hotels.jpg Sport for Life Center 145 Pacific Ave. Use: Recreational Height: - Website: http://www.sportforlifecentre.ca/ Estimated Completion: Unknown http://pointdouglas.com/plugins/p17_...mages/1424.jpg source: http://pointdouglas.com/plugins/p17_...mages/1424.jpg EDUCATIONAL - TRANSPORTATION Phase 2 South BRT South-central Winnipeg Use: Rapid transit Length: end of phase 1 to University of Manitoba Website: http://winnipegtransit.com/en/rapid-transit Estimated Completion: Unknown http://winnipegtransit.com/assets/60..._Thumbnail.jpg source: http://winnipegtransit.com/assets/60..._Thumbnail.jpg ------------------------------------------------------------------ RUMOURED - Michael Maltzan designed WAG expanasion - Winnipeg Convention Centre hotel - 221 Stradbrook (18 storey apartments) - 257 Osborne (announcement 2015 Q1) - Fairchild Lofts Phase 2 - 229 Roslyn - 172 Donald mixed-use - James Ave parkade |
Winnipeg, Manitoba
Canadian Museum for Human Rights Update: Completed: Official Opening 2014/Sept. http://shacoustics.com/wp-content/up...Exterior-1.jpg Photo Credit:: CMHR, Steve Haas http://shacoustics.com/portfolio-ite...-human-rights/ Wikipedia: https://en.wikipedia.org/wiki/Canadi...r_Human_Rights SSP Thread - CMHR SSP DIagram http://skyscraperpage.com/diagrams/?searchID=71027555 |
Winnipeg | True North Square | ?M | ?M | ?M | ?M | 27F | 24F | 17F | 17F | Site Prep
Tower 1 (right) and 2 (left) http://www.truenorthsquare.com/wp-co...ns_view_01.jpg Image Source: http://www.truenorthsquare.com/development/gallery/ Quote:
Quote:
http://storage.winnipegsun.com/v1/dy...y=80&size=650x Image Source: http://www.winnipegsun.com/2016/02/2...quare-revealed SSP Thread: http://forum.skyscraperpage.com/showthread.php?t=217327 |
Great project.When will it be completed?
|
Looks like a 4 year project by all accounts. Tower 1 @ 17 floors, U/C, should be completed in 2018. The other towers are projected to be finished in and around 2019-20, with the Sutton Place Residences,(condo tower) @ 17 flrs. as well the last to go up, of course pre-sales are always a consideration possibly pushing this all into 2020.
|
Winnipeg | Proposed 40 Floor / ~ 153 Meter Residetial Tower
40-storey apartment tower planned for Portage and Main
Official announcement expected as early as next month Quote:
- Aprx: 400 Residential Units - New Build 300 Main St.(Phase II) | Re-Clad 360 Main St. - Cost: Aprx: $140M / Reclad $24M - 3 Floors Commercial space/4 storey podium - Office/Retail - Start: February 2017 | Completion 2019 April 7.2016 First Render Release: http://www.metronews.ca/news/winnipe...nd-graham.html I've edited the photo and scaled it to a smaller size. Feel free to use it in other discussions and posts. https://farm2.staticflickr.com/1644/...b6c0fd0b_z.jpg Other Conceptual Renders From: Artis REIT * Note: All images edited/hosted by me. Please add Artis link source + This note if using on site: Thx. 300 Main St. https://farm2.staticflickr.com/1541/...27dac831_c.jpg Looking South on Main St. https://farm2.staticflickr.com/1595/...6b30c2e4_c.jpg https://farm2.staticflickr.com/1588/...5b96b760_c.jpg https://farm2.staticflickr.com/1531/...f3fa5994_c.jpg Image Sources: http://www.artisreit.com/360-main-bu...-announcement/ |
Winnipeg | 300 Assiniboine Ave | 86M | 25 Floors
Winding down on this residential project. A few excellent images of this building located on the banks of the Assiniboine River in Downtown Winnipeg. Quote:
http://forum.skyscraperpage.com/show...php?p=7415010& Building Data Page: http://skyscraperpage.com/cities/?buildingID=91433 |
Winnipeg | Centrepoint | 70M - 72.5M | 21F | 20F
Winnipeg (2) tower project nearing completion. The 20 storey Alt Hotel, completed late in 2015 (on the right), and the Glasshouse Skylofts condominium project wrapping up later this year. https://pbs.twimg.com/media/CgH76ibUAAAvWbM.jpg https://mobile.twitter.com/stefanogr...420417/photo/1 - http://www.urbancapital.ca/glasshouse-win SSP Sub-Forum Thread: http://forum.skyscraperpage.com/show...197745&page=98 Diagrams: Alt Hotel http://skyscraperpage.com/cities/?buildingID=96454 Glasshouse Skylofts http://skyscraperpage.com/cities/?buildingID=29900 |
Red River College STTC
Winnipeg, MB - Red River College Campus Number TEN's: Prime Consultant Size: 102,000 sq. ft. Completed: 2017 (Estimated) Quote:
http://www.numberten.com/modules/mod...27e49c0ecf.jpg Image/Informational Source: |
Winnipeg | Forks Redevelopment - Parcel 4 - Rail Side Initiative | Preliminary Proposals
Mixed-use redevelopment preliminary proposals. Located at the junctions of the Red and Assiniboine Rivers in downtown Winnipeg, Manitoba. Initiative includes recreational, historical and cultural, residential, and institutional and supportive commercial uses. Proposals Include: - Public Spaces - Parks, Plazas, and Promenades - Mixed-Use Development Parcels - Community-Cultural Land Bank - District Eco-Targets http://www.theforks.com/uploads/ck/i...Concepts_2.jpg http://www.theforks.com/uploads/ck/i...Concepts_3.jpg http://www.theforks.com/uploads/ck/i...Concepts_1.jpg http://www.theforks.com/railside/preliminary-concepts More info at : http://www.theforks.com/ Revised concepts for Initiative(PDF) http://s3.documentcloud.org/document...al-package.pdf Project Thread: http://forum.skyscraperpage.com/showthread.php?t=217747 |
Macdonald Youth Services - Therapeutic Centre - U/C
175 Mayfair Ave, Wpg, MB. Quote:
http://media.winnipegfreepress.com/i...ied-sept30.jpg http://www.winnipegfreepress.com/our...329975881.html |
TNS Square Winnipeg
Base foundation for Crane 1 of 2 moving forward.. Quote:
http://forum.skyscraperpage.com/showthread.php?t=217327 |
Manitoba Clinic - Winnipeg
Quote:
Project thread: http://forum.skyscraperpage.com/showthread.php?t=221635 |
^^^
I've been seeing an eye specialist since eary May. There is a room on the main fl. where there is an eye clinic as well as a foot clinic. I'm assuming that they're doing this because it's so crammed in space. |
Manitoba Museum of Man and Nature - Expansion Underway
Winnipeg, Manitoba Quote:
http://3.bp.blogspot.com/-sg3dPjvTUc...23%2B10.37.jpg Images/Informational Source: |
http://2.bp.blogspot.com/-HTFmv1QpO_...FIN-WEB-JS.jpg
Arguably, the coolest looking building I've ever seen!!! :worship: |
Views of Centre Point Winnipeg at 20/21 floors and the completed adjacent parkade.
Quote:
|
Manioba Clinic / 10 floors foundation complete and moving forward..
Quote:
|
Fountain House Sherbrooke Ave - Winnipeg..West Braodway area..A winnipeg neighborhood growing and finally coming to life.after many years of decline..
Quote:
|
July.7.2016 True North Square Update: Winnipeg. 2nd crane base prep. underway top middle of photo)
https://c1.staticflickr.com/8/7347/2...9eb4cd28_c.jpg Project Thread: http://forum.skyscraperpage.com/forumdisplay.php?f=129 |
d Condo 81m 24 floors - Progress
Quote:
http://forum.skyscraperpage.com/showthread.php?t=207408 |
TNS project(centre of image)..Winnipeg, moving ever upward..
Quote:
|
Womans Hospital / Diagnostic Center of Excellence - Winnipeg
Quote:
|
Re-Clad 360 Main St - Located on same Pad Site that will see the Proposed
300 Main St project begin Early in 2017 WINNIPEG | 300 Main St. | ~ 153M | ~500FT+ | 40+ FLOORS http://i1075.photobucket.com/albums/...pssnbuqifp.jpg Jeremy6: http://i1075.photobucket.com/albums/...pssnbuqifp.jpg |
looking good Peg.
|
98 Market | 18M | 6F | U/C
Quote:
- 64/65-unit apartment complex - $13.5-million - Developer: Albert Cheung - Start: Now Completion: Sept:2017 WFP Source: http://www.winnipegfreepress.com/bus...364635741.html http://i.cbc.ca/1.3396659.1452348005...ert-sketch.jpg http://i.cbc.ca/1.3396665.1452297730...arket-plan.jpg CBC Source: http://www.cbc.ca/news/canada/manito...plex-1.3396625 Project Thread: http://forum.skyscraperpage.com/show....php?t=221964& |
Winnipeg | Gas Station Arts Centre | 9F
Proposed 9 Storey - (85 unit} Residential / Theatre and Retail Complex.
Located at 445 River Ave and Osborne St. in the heart of the Osborne Village area. Proposal Details: • A new 300 seat theatre for the Gas Station Arts Centre • Approximately 5,000 sq ft of retail space at grade fronting Osborne Street • An extension of the plaza in front of Villa Cabrini • A four storey cantilever over the sidewalk on Osborne Street to accommodate a crush space for the gas station theatre • Approximately 60% of the units will be co-op housing units • Upper stories of the building will be setback on River Avenue, Osborne Street, and the back lane, creating space for townhouses with terraces on the north and south sides • A proposed urban greenhouse and artist studio on the roof - Underground parkade - Tentative plans are to start the project this summer, ( 2015) and be completed by late 2016. - Three levels of government to help with the $10 million needed to demolish and construct the retail/theatre portion of the project. - $ 20 million to construct the 85 unit residential portion of the project and construct the undeground parkade. - Est. Total Cost: $ 30 million.
http://storage.winnipegsun.com/v1/dy...y=80&size=650x Image Source(s) Sub-Forum Thread http://forum.skyscraperpage.com/showthread.php?t=213455 |
A few renders of the currently proposed SkyCity project in the Pre-Con. / Pre-Sale phase:
SkyCity Centre | 575 Ft | 175.26 M | 45F https://pbs.twimg.com/media/CPxQTRyU8AAjKxu.jpg https://pbs.twimg.com/media/CNhd3SeWcAASskM.jpg:large https://twitter.com/SkyCityWinnipeg/...62933304033280 |
Progress - d Condo 24 floors | 81m
Quote:
|
TN Square Update: Scope for the first phase of project, towers1 and 2 has changed to 28 floors and 17, residential has increased by 4 floors from 24. 2nd phase scope across the street in photo has not yet been determined, previously listed at 27 and 17 floors respectively.
https://c2.staticflickr.com/9/8541/2...9c2ab7f3_b.jpg |
TNS Update for Feb.2017
Quote:
|
Tenants begin moving in Feb. 15 to 62M Condos at 62 MacDonald Avenue in Winnipeg.
Quote:
http://www.cbc.ca/beta/news/canada/m...ipeg-1.3981026 Video of layout, interior: http://www.cbc.ca/player/play/877161027850/ |
All times are GMT. The time now is 9:09 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.