caltrane74 Feb 29, 2008 9:29 PM

TORONTO | Trump Hotel & Tower Toronto | 282 M / 925 FT | 60 FLOORS
 
Trump International Hotel & Tower


http://img523.imageshack.us/img523/4...parisonxd3.jpg

Location: 325 Bay Street
Developer: Talon International Development, Trump
Architect: Zeidler Partnership Architects
Planning Docs: Final Report
Designation: Hotel, residential
Status: Under-Construction
Expected Occupancy: 2010
Height: 282 meters. spire (251 meters. roof)
Floors: 57
Size:
Value:
Website:www.trumptoronto.ca/

caltrane74 Mar 1, 2008 1:30 AM

guys, I will update this thread with construction shots.

Just busy right now...

caltrane74 Mar 1, 2008 1:45 AM

excavation at the Trump site finally begins....

pictures courtesy of current on SSC


website is as follows:

www.skyscrapercity.com

caltrane74 Mar 4, 2008 2:32 PM

update by Mike in TO

www.urbantoronto.ca

caltrane74 Mar 10, 2008 1:32 PM

Quote:

Originally Posted by Geekaroo (Post 164686)

from geekaroo

www.urbantoronto.ca

JACKinBeantown Mar 10, 2008 2:15 PM

Nice.

caltrane74 Mar 16, 2008 2:50 AM

They only need to go down 50 feet. So this one should rise fast.

WindsorDetroit Mar 17, 2008 4:17 AM

wikipedia.org says "Numerous reports say that the tower has been raised to 70 stories again" is this true in any way that we know of?

caltrane74 Mar 17, 2008 1:50 PM

No way. They can't do it.. to many units and not enough space for the elevators to accomodate.

It will be 57 floors, trust me.

caltrane74 Mar 29, 2008 4:43 PM

Moving very slowly

courtesy of current SSC - www.skyscrapercity.com

http://farm3.static.flickr.com/2342/...99a8a2da_b.jpg

kraggman Mar 29, 2008 6:24 PM

I think it's interesting how the site is surrounded by the steelwork that both protects the sidewalks and acts as a raised stand for the construction office.

caltrane74 Apr 4, 2008 1:49 PM

Yes, they are working in a very confined space. This will end up being a very sleek condo-hotel tower.

caltrane74 Apr 12, 2008 7:34 PM

Time for an update:

http://farm3.static.flickr.com/2052/...f0f20800_o.jpg


From Redroom Studios at www.urbantoronto.ca

caltrane74 Apr 14, 2008 3:33 AM

Quote:

Originally Posted by current (Post 175484)
Thank you yyzer for posting the photos. They were taken on April 12.

From Bay St looking east, they are now digging in the clay layer.

http://farm4.static.flickr.com/3219/...bc7996cf_b.jpg

From Bay looking northeast at the ramp from Adelaide and the Bay Adelaide Centre in the background.
http://farm3.static.flickr.com/2097/...bb346efa_b.jpg

Still a lot of rubble and parts of old building foundations in the northeast corner of the site with the Bay Adelaide Centre on the other side of Adelaide.
http://farm4.static.flickr.com/3088/...edd076e9_b.jpg

Looks like a granite boulder deposited by glaciers thousands of years ago in the last ice age. Maybe they could use it in their building as a conversation piece.
http://farm3.static.flickr.com/2115/...3fbdb941_o.jpg

http://farm4.static.flickr.com/3158/...40db4403_b.jpg

http://farm4.static.flickr.com/3282/...be7a9bfb_b.jpg

From current over at www.urbantoronto.ca / www.flickr.com

Trump excavation taking place, with BA cladding going on across the street.

caltrane74 Apr 19, 2008 9:37 PM

excavation on this one is getting close to completion. we should be seeing crane and concrete soon enough.

Juan_M2118 Apr 19, 2008 9:44 PM

Quote:

Originally Posted by caltrane74 (Post 3496525)
excavation on this one is getting close to completion. we should be seeing crane and concrete soon enough.

I actually think this is very far from being complete, still lots of (diggin). MY OPINION, i really dont know how they do it in Canada??

SFUVancouver Apr 19, 2008 10:01 PM

I'm glad to see this project get under way but they cannot be almost done excavation. That's absurd. The 195 metre Shangri-La Vancouver went down nearly a hundred feet for its excavation and Trump is almost 50% taller.

I assume that Trump will have underground parking and a limited amount at that since it is downtown?

caltrane74 Apr 20, 2008 12:50 AM

Quote:

Originally Posted by SFUVancouver (Post 3496568)
I'm glad to see this project get under way but they cannot be almost done excavation. That's absurd. The 195 metre Shangri-La Vancouver went down nearly a hundred feet for its excavation and Trump is almost 50% taller.

I assume that Trump will have underground parking and a limited amount at that since it is downtown?

no underground parking at trump. its all above ground.

caltrane74 Apr 20, 2008 12:52 AM

Quote:

Originally Posted by Juan_M2118 (Post 3496543)
I actually think this is very far from being complete, still lots of (diggin). MY OPINION, i really dont know how they do it in Canada??

noooooooooo. no underground parking excavation is almost done.

Juan_M2118 Apr 20, 2008 1:41 AM

Quote:

Originally Posted by caltrane74 (Post 3496782)
noooooooooo. no underground parking excavation is almost done.

But dont they have to reach bedrock,, and where are the caissons?