SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Completed Project Threads Archive (https://skyscraperpage.com/forum/forumdisplay.php?f=348)
-   -   MONTREAL | Holiday Inn Montreal | 120 M / 394 FT | 40 FLOORS (https://skyscraperpage.com/forum/showthread.php?t=213930)

MTLskyline Oct 25, 2014 1:10 AM

MONTREAL | Holiday Inn Montreal | 120 M / 394 FT | 40 FLOORS
 
Quote:

Holiday Inn Montreal

Holiday Inn Montreal Centre ville Ouest, presently under development
will become a welcome addition to Montreal’s modern Hotel scene.

Located at the corner of Rene Levesque West and Lucien L’Allier
(foot of Crescent Street), one block from both the home of the Montreal
Canadians Bell Center, Ste Catherine Street, Lucien L’Allier Metro
(subway) Station and steps away from the CGI, CIBC, IBM Towers’, Molson
School of Business and Concordia University.

Perfect location for both business and leisure travelers.
http://i57.tinypic.com/2cmspid.jpg

Source: http://www.himtl.com/

Rico Rommheim Oct 25, 2014 2:40 PM

I don't hate it. It's a simulacra of the Marriott Courtyard/Hilton Garden Inn template. It's glass, it's 120m (probably) and it's gonna be on a site that was an abandoned garage yard for the past 50 years. It's going to bring hundreds of tourists and apartment renters into the neighbourhood.

I'll take it.

Robertpuant Oct 25, 2014 4:13 PM

Hotels use curtain walls instead of window walls. Right there it's above average. I'll take it too!

Rico Rommheim Nov 1, 2014 6:33 PM

40 floors -120m

http://affaires.lapresse.ca/economie...ntre-ville.php

Quote:

MAXIME BERGERON
La Presse
La vague de construction d'appartements locatifs ne semble pas près de s'estomper à Montréal. Le groupe Canvar érigera une tour filiforme de 40 étages dans l'ouest du centre-ville, qui comprendra 250 logements et un hôtel Holiday Inn.

L'immeuble sera bâti à l'angle du boulevard René-Lévesque et de la rue Lucien-L'Allier, sur une parcelle de terrain revendue par le promoteur du projet de condos YUL. Les travaux de décontamination vont déjà bon train, et Canvar espère pouvoir démarrer l'excavation au cours des prochains mois.

«Ça devrait prendre trois ans pour terminer l'immeuble au complet, et deux ans pour pouvoir ouvrir l'hôtel», a expliqué le promoteur Marc Varadi, de Canvar.

L'hôtel occupera les 10 premiers étages du gratte-ciel, et des appartements seront érigés aux 30 étages supérieurs. La tour mesurera 120 mètres (environ 400 pieds).

En gros, Canvar appliquera la même recette qu'avec ses deux projets précédents. Le groupe a construit il y a quelques années le Hilton Garden Inn, rue Sherbrooke, qui comprend des logements aux étages supérieurs. Plus tôt cette année, l'entreprise a inauguré le V, à l'angle de Bleury et René-Lévesque, une tour locative de 40 étages dont les 10 premiers étages sont occupés par un Marriott Courtyard.

«Les appartements du V se sont loués à 85% en à peine six mois», a affirmé Marc Varadi avec le sourire.

Logements haut de gamme

La demande pour des logements locatifs haut de gamme est robuste depuis plusieurs trimestres à Montréal, alors que celle pour les condos neufs fléchit.

Signe des temps, une série de projets locatifs ont été annoncés au cours des derniers mois dans Griffintown, au centre-ville et dans le Quartier des spectacles.

Design peaufiné

Canvar et ses architectes - le Groupe Architex - ont dû retourner plusieurs fois à leur planche à dessin, confie Marc Varadi. Les urbanistes de l'arrondissement de Ville-Marie ont insisté pour que la tour soit le plus vitrée possible, afin de s'accorder avec le design de l'immeuble voisin (CGI).

Maintenant que le concept est finalisé, le projet devra être revu et approuvé par le comité consultatif d'urbanisme de Ville-Marie.

Le Holiday Inn de 220 chambres qui occupera les étages inférieurs viendra remplacer l'ancien établissement de la bannière, situé rue Sherbrooke. L'immeuble a été vendu puis transformé en résidence pour étudiants au début de 2014, comme plusieurs autres hôtels désuets du centre-ville.

Design-mind Nov 2, 2014 2:58 AM

I don't hate it either, but I can't say I love it. IMHO I think the 15 storey podium is what makes this project unrefined. They need more tower less podium!

BillM Nov 2, 2014 3:36 PM

It looks like the rendering is not in context with the site.

Which way do you think this building will face? Or better yet, which way should it be oriented?

Rico Rommheim Nov 2, 2014 3:55 PM

I'm pretty sure we're seeing the building as if we'd be standing on Crescent street, looking north. So the tower would be facing the CCE 2 while the podium would be orientated towards the YUL.

Coldrsx Nov 2, 2014 8:02 PM

Simple, modern, infill... What's not to like.

cityguy Nov 2, 2014 10:08 PM

Will add to the density going up in the area

Rico Rommheim Nov 5, 2014 1:46 AM

^It will. and improve the Rene-Levesque canyon.

Digging has started.

Quote:

Originally Posted by SkahHigh (Post 6795022)
Construction has started on the Holiday Inn Downtown Montreal - 120m... Only a week and a half after it was announced lol

http://img15.hostingpics.net/pics/97...8878841052.jpg
Photo by Olivier2160 on Mtlurb


MTL-514 Nov 17, 2014 8:18 AM

Another angle, from last Tuesday:

https://farm8.staticflickr.com/7488/...caf99f44_b.jpg
image by me

a very long weekend Nov 18, 2014 9:06 PM

hard to believe this is going ahead so quickly, with the YUL ones next door still seemingly so far off.

franktko Nov 18, 2014 9:09 PM

Quote:

Originally Posted by a very long weekend (Post 6812477)
hard to believe this is going ahead so quickly, with the YUL ones next door still seemingly so far off.

Not that far off. Latest rumors state that the start of construction is imminent (this week).

Ashok Nov 18, 2014 9:10 PM

I have a better opinion of this tower, but only because they have a no BS approach, they annouce, launch and construct.

Rico Rommheim Nov 19, 2014 11:39 AM

Quote:

Originally Posted by MTL-514 (Post 6810351)
Another angle, from last Tuesday:

https://farm8.staticflickr.com/7488/...caf99f44_b.jpg
image by me

I really wish they hadn't messed around with the old Ford hotel. That glass addition is hideous.

SkahHigh Dec 9, 2014 3:31 PM

New diagram for this one, courtesy of P2000:

http://skyscraperpage.com/cities/?buildingID=104548

Rumors Apr 5, 2015 3:09 PM

My shot. https://farm8.staticflickr.com/7666/...a7e014c0_h.jpgDSC_0126 by MTL Rumors, on Flickr

KrazyKanuck Jul 10, 2015 5:35 PM

Here's an updated photo of the work. They have started to pour the concrete for the parking lot and excavated pretty much all of the ground. http://www.mtlwarehouse.ca/wp-conten.../07/HI_MTL.jpg

MolsonExport Jul 15, 2015 6:09 PM

woots for mtl

Urbannizer Feb 26, 2016 9:20 PM

2/2016:

http://www.mtlurb.com/forums/attachm...7&d=1455746391
http://www.mtlurb.com/forums/showthr...518#post245518


All times are GMT. The time now is 10:58 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.