SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   City Compilations (https://skyscraperpage.com/forum/forumdisplay.php?f=87)
-   -   EDMONTON | Projects - full list (https://skyscraperpage.com/forum/showthread.php?t=101053)

Coldrsx Mar 15, 2006 5:15 PM

EDMONTON | Projects - full list
 
Current Active Discussion – Found in Regional Forum SubSection “Canada” then “Alberta”





http://img249.imageshack.us/img249/2...exthe91mi6.jpg



Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the thread.

Press "Ctrl-F" if you want to search for projects within this page

Press "Esc" if you want quit loading all the numerous images on this thread.

Press "Ctrl+F5" If some images do not load right away, this will refresh your Web Browser





Edmonton Information:

City Population – 712,391 (2005) Edmontonhttp://img408.imageshack.us/img408/6...esign14pz5.png CMA Population - 1,034,945 Edmonton Capital Regionhttp://img408.imageshack.us/img408/6...esign14pz5.png

Incorporation as Town - 1892 Incorporation as City - 1904

Total Area - 683.88 km² (2004) Elevation – 688 m above sea level Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks.



Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country"

Mayor – Stephen Mandel (34th Mayor of Edmonton) Last Municipal Election - Oct. 18, 2004 Next Municipal Election - Oct. 17, 2007





Important Links:

Edmontonhttp://img408.imageshack.us/img408/6...esign14pz5.png,Edmonton Capital Regionhttp://img408.imageshack.us/img408/6...esign14pz5.png,Connect2Edmonton - a forum of topics of importance to Greater Edmonton's future.[/url],

Focus Edmonton: City Plan,

Alberta Ministry of Infrastructure and Transportation,Alberta Ministry of Municipal Affairs and Housing,Edmonton Economic Development,Edmonton Transit,Edmonton SLRT Expansion Site,Edmonton BRT Planning website,Moving Edmonton – Updating the Transportation Master Plan,High Speed Transit Planning Study,Alberta Municipal Government Act,Edmonton Design Committee



Revitalization/Study/Neighborhood Plan Links

105th Avenue Changeshttp://img519.imageshack.us/img519/3...ffd287fhy1.png, 109th Street Corridor Studyhttp://img519.imageshack.us/img519/3...ffd287fhy1.png, Fort Road Old Town Redevelopment, http://img519.imageshack.us/img519/3...ffd287fhy1.pngCapital City Downtown Planhttp://img519.imageshack.us/img519/3...ffd287fhy1.png,Strathern Rezoning Application,Downtown East Action Plan Overview



More to follow in this section – anything you think would be relevant here just let me know, I’ll add





Most Project Titles and Names are now clickable, if they have an underline under them, theres a click-able link taking you to more information





Commercial/Government Office

12 Floors and over
  1. Devonian Building retrofit - Under Construction

    Developer: Canterra Architect: ? Location: Jasper and 112st Number of floors: 14? URL: ?

    http://i151.photobucket.com/albums/s...t/IMGP0247.jpg




  2. Professional Building addition/remodel - Under Construction

    Developer: Procura Architect: Arndt Tkalcic Architecture Location: Jasper Avenue / Between 108 and 109 st Number of floors: 12 URL:


    http://img407.imageshack.us/img407/9...2a255d2ij6.jpg

    http://img407.imageshack.us/img407/4...2a26870fn2.jpg

    http://img407.imageshack.us/img407/3...2a28195oa8.jpg




  3. Office Tower on Jasper and 111 Street Northside - Proposed - Demo on old Servus bank on site to possible start in March

    Developer: Canterra Architect: ? Location: Jasper and 111st Number of floors: 12 URL:?

    http://i75.photobucket.com/albums/i3...canterra02.jpg




  4. Canada Place Addition/ 3rd Phase - Rumored

    Developer: ? Architect: ? Location: ? Number of floors: ?

    http://img286.imageshack.us/img286/2...adaplacxe0.jpg




  5. Ironwood - Rumored

    Developer: Ironwood Architect: ? Location: ? Number of floors: 18




  6. Office tower on Jasper/102st - Rumored

    Developer: Melcor Architect: ? Location: Jasper and 102st Number of floors: ? URL: ? Picture: ?




  7. Bell Tower 2? - Rumored

    Developer: Oxford Architect: ? Location: 101st 103rd St Number of floors: 20-30 URL: ? Picture: ?




  8. BMO Tower Replacement - Rumored

    Developer: Dundee Architect: ? Location: ? Number of floors: 20-25 URL: ?

    Picture: ?





  9. West Edmonton Mall Expansion- Approved

    155,000 sqft expansion of retail space around Entrance 50 and east of the WaterPark

    WEM convention centre

    WEM WHL Hockey Arena

    This will include additional retail space, a facility for sports, trade shows and conventions, a 12-story office building, and a 600-unit apartment building, along with more parking.

    WEM Office Building - Rumored

    Developer: ? Architect: ? Location: ? Number of floors: 12URL: ?

    Picture: ?




    WEM Apartment Building - Approved

    Developer: ? Architect: ? Location: ? Number of floors: 12 URL: ?



    WEM 2nd Hotel - Approved

    Developer: ? Architect: ? Location: ? Number of floors: 12 URL: ?

    http://img130.imageshack.us/img130/8...ansion1dk8.jpg



    others???

    jasper 101st - 400,000 - GWL

    Manulife?

    Sunlife?

    10830 jasper - 225,000 - procura?

    102/103st - ? - ironwood

    staples - 300,000 - oxford

    paramount - 400,000 mixed - procura





Mixed Use (Res/Comm)

Over 12 Floors
  1. StationLands - Proposed

    Developer: Qualico Lands Architect: Kasian Location: North of CN Tower along 105 avenue between 101 street, and 97 Street

    Number of floors:

    Tower A 3 149 m 34 Tower C 1 69 m 15

    Tower B 2 149 m 37 Tower D 2 69 m 21



    http://img258.imageshack.us/img258/8...utover1hd2.jpg

    http://img444.imageshack.us/img444/4593/probpic1qe8.jpg









Residential

12 Floors and Over
  1. Century Park - Under Construction - full build out over many years

    Developer: Westbank Projects Corp and Procura Architect: James KM Cheng and Ardnt TKalcic Location: Former Heritage Mall Site, East side of 111th Street, North of 23rd Avenue Number of floors:

    Total Floor Count Century Park: 232

    Tower 1 - 20 Floors Tower 2 - 18 Floors

    Tower 3 - 18 Floors Tower 4 - 20 Floors

    Tower 5 - 24 Floors Tower 6 - 24 Floors

    Tower 7 - 24 Floors Tower 8 - 24 Floors

    Tower 9 - 12 Floors Tower 10 - 20 Floors

    Tower 11 - 16 Floors Tower 12 - 12 Floors


    http://i31.photobucket.com/albums/c3...knight1/cp.png

    http://downwithrobots.com/uploads/store/cp_1.jpg

    http://i75.photobucket.com/albums/i3...ury- full7.jpg

    http://i75.photobucket.com/albums/i3...tury-full8.jpg

    http://i75.photobucket.com/albums/i3...tury-full4.jpg

    http://i75.photobucket.com/albums/i3...ury- full3.jpg




  2. The Icon

    Tower 1 and podium
    - Under Construction

    Tower 2Approved

    Developer: Langham Properties Architect: Brinsmead Ziola Kennedy Architecture Location: 104th Street between 102 Avenue and Jasper Avenue

    Number of floors:

    Tower 1 - 30 Tower 2 - 35


    http://www.theicon.ca/html/images/ex/e2.jpg




  3. AuroraProposedFirst tower Approved

    Developer: Architect: Brinsmead Ziola Kennedy Architecture Location: 102st to 104st from 105ave-106ave

    Number of floors:

    Aurora - Building D 28 Aurora - Building E 28

    Aurora - Building F 25 Aurora - Building B 23

    Aurora - Building C 23 Aurora - Building A 17


    http://www.dc5ab.com/forums/uploads/...1176922063.jpg

    http://www.bzka.com/images/projects/78/2.jpg






  4. Bellamy Hill Tower-Proposed

    Developer: Trans America Group Architect: Holland Roth Architects Location: Bellamy Hill Number of floors: 32

    http://www.transamericagroup.com/ima...ws/bellamy.gif




  5. Glenora Towers - Proposed

    Developer: ? Architect: Brinsmead Ziola Kennedy Architecture Location: 142 Street, Stony Plain Road

    Number of floors:

    Glenora Tower 1: 17 Glenora Tower 2: 13 Glenora Tower 3: 11 Glenora Tower 4: 11 Glenora Tower 5: 8


    http://members.shaw.ca/vincentwansin...n%20Rd%202.JPG

    http://members.shaw.ca/vincentwansin...n%20Rd%203.JPG

    http://members.shaw.ca/vincentwansin...n%20Rd%204.JPG




  6. The Q - Proposed

    Developer: ? Architect: Brinsmead Ziola Kennedy Architecture Location: 105st 104ave tower Number of floors: 24

    http://img164.imageshack.us/img164/2745/61te2.jpg

    http://www.bzka.com/images/projects/79/2.jpg

    http://www.bzka.com/images/projects/79/3.jpg

    http://www.bzka.com/images/projects/79/5.jpg




  7. Arlington + Tower - Proposed

    Developer: ? Architect: Brinsmead Ziola Kennedy Architecture Location: 100ave 106st Number of floors: 20 URL: http://www.vueweekly.com/articles/default.aspx?i=1964

    http://farm1.static.flickr.com/184/4...bf7c40.jpg?v=0




  8. Uptown - Under Construction

    Developer:True North Properties Architect: Sylvie Perrault Location: Between Jasper Ave and Victoria Park Rd on 117 Street NW Number of floors: 15 Floors, 54 Suites

    http://i75.photobucket.com/albums/i3...8/uptown02.jpg

    http://i75.photobucket.com/albums/i3...8/uptown01.jpg




  9. Vivacity - Under Construction

    Developer: True North Properties Architect: ? Location: 104th Street, North of 98 Avenue Number of floors: 18

    http://members.shaw.ca/vincentwansin...s/Vivacity.jpg

    http://members.shaw.ca/vincentwansin...vacity%202.jpg




  10. Concert Properties Jasper Ave 124 st - Approved

    Developer: Concert Architect: Location: Jasper Ave west of 124st Number of floors: 16 URL: ?

    http://img256.imageshack.us/img256/4002/concert3tx2.png

    http://img87.imageshack.us/img87/5333/concert2ab9.jpg






  11. Alta vista 2 - Under Construction

    Developer: Christenson Developments Architect: Location: Railtown (South of 104th avenue on 111th Street) Number of floors: 12

    http://www.cdlhomes.com/altavista/index.htm


    http://www.cdlhomes.com/altavista/imageLRG.jpg




  12. Strathern Heights - Proposed

    Developer: ? Architect: Sturgess Architecture Location: ?

    Number of floors:

    Strathern Heights Tower 1: 19 Strathern Heights Tower 2: 17 Strathern Heights Tower 3: 17 Strathern Heights Tower 4: 17


    http://img470.imageshack.us/img470/1...heightspf2.jpg

    http://img207.imageshack.us/img207/3...rathernha3.jpg

    http://img402.imageshack.us/img402/3...athern2zu8.jpg




  13. Founder's Ridge - Proposed

    Developer: BMC Developments Ltd Architect: Hartwig Architecture Inc Location: 105st 98ave Number of floors:

    http://img46.imageshack.us/img46/6360/founderscq2.jpg




  14. China Town Condo - Proposed

    Developer: ? Architect: ? Location: 105ave/98 Street Number of floors: 13 URL: ?

    http://www.dc5ab.com/forums/uploads/...1162853252.jpg




  15. The Pines - Proposed

    Developer: Westcorp Architect: ? Location: 51 Ave Number of floors: 16 URL: ?

    http://img355.imageshack.us/img355/6615/westcorpsy0.jpg

    http://www.dc5ab.com/forums/uploads/...1162857679.jpg

    http://img337.imageshack.us/img337/5...esb3fcave7.jpg




  16. The Parliament - Completed

    Developer: ? Architect: C.W TSE Architects LTD. Location: 9939 109th Street

    Number of floors: 18





  17. Rivervista - Under Construction

    Developer: Christenson Developments Architect: ? Location: 9707-106th STREET Number of floors: 13

    http://www.cdlhomes.com/rivervista/imageLRG3.jpg




  18. The Illuminada 1 - Completed

    Illuminada 2 - Under Construction

    Illuminada 3 - Proposed

    Developer: WAM Development Group Architect: Kasian and Wensley Architecture from Vancouver Location: Jasper Avenue between 119th and 120th Street

    Number of floors:

    Illuminada 1 - 12 Illuminada 2 - 12 Illuminada 3 - 12


    http://www.theilluminada.com/images/photo_05.jpg

    http://www.dc5ab.com/forums/uploads/...1139608562.jpg




  19. Serenity - Under Construction

    Developer: Urban Landmarks Architect: CSG Brinsmead Ziola Kennedy Architecture Location: Jasper Ave + 118 Street (Former Mcdonalds location) Number of floors: 12

    http://img253.imageshack.us/img253/233/serenitycf2.jpg




  20. Red Leaf Bellamy Hill Tower - Rumored

    Website contains no valuable information...HA!

    Developer: Red Leaf Developers Architect: ? Location: 99ave Bellamy hill Number of floors:


    URL: http://redleafpd.com/




  21. VDI Tower - East Jasper - Rumored

    Developer: Architect: ? Location: East Jasper Number of floors:




  22. Norama Site - Rumored

    Developer: Architect: Wenlsey Location: 95 Street, Jasper Ave Number of floors: URL:

    http://i75.photobucket.com/albums/i3...78/TheHood.jpg




  23. 103ave/105st tower - Rumored

    Developer: ? Architect: Brinsmead Ziola Kennedy Architecture Location: 104ave/105st Number of floors:21 URL: ? Picture: ?




  24. Crown Plaza Condo Tower - Rumored

    Developer: ? Architect: Stantec Location: 100ave 101st Number of floors: 40 rumoured URL: ? Picture: ?




  25. The New North - Proposed

    Developer: Alldritt Homes LTD Architect: ? Location: Clairview

    Number of Floors: TNN Tower 1: 12 TNN Tower 2: 12 TNN Tower 3: 12 TNN Tower 4: 12

    URL: www.thenewnorth.ca





  26. The Oliver- Rumored

    Developer: Architect: CW Tse Architects and ISL Engineering and Landscape Architecture. Location: 10024 110 Street. Number of Floors: 14

    http://i75.photobucket.com/albums/i3...78/smscan1.jpg

    http://img378.imageshack.us/img378/1...2b9ad07xq7.jpg



Anything Under 12 Floors Commerical/Government Worth Mentioning


  1. Downtown Urban Format Sobeys - Under Construction

    Developer: John Day Architect: Arndt Tkalcic Architecture Location: NW Corner of 104th St. and Jasper Ave Number of floors: 4 URL: ?

    http://members.shaw.ca/vincentwansin...beys%20new.gif




  2. Windermere - Under Construction

    Developer: Harvard Developments Architect: Kasian Planner: Stantec Location: South of Anthony Henday, on Tewillegar Number of floors: Various

    http://www.windermereedmonton.com/im...- maingate.jpg

    http://www.windermereedmonton.com/im.../2-fashion.jpg

    http://www.windermereedmonton.com/im...-bookstore.jpg

    http://img50.imageshack.us/img50/724...ermere3kc9.jpg




  3. Century CasinoUnder Construction

    Developer: ? Architect: Unigroup Location: ?Number of floors: ?

    http://i15.photobucket.com/albums/a3...rationsHTL.jpg




  4. The River Cree Resort and Marriott Hotel - Completed

    Developer: ? Architect: ? Location: ? Number of floors: ?

    http://i31.photobucket.com/albums/c3...ight1/qqqq.png






[/list]
Anything under 12 Floors Residential worth mentioning
  1. Holyrood Gardens & Holyrood Boulevard - Under Construction

    Developer: Westcorp Architect: Location: 85th Street between 90th and 95th Avenue, Number of floors:

    http://img510.imageshack.us/img510/4...od52483uc0.jpg




  2. The Venetian- Under Construction

    Developer: Abbey Lane homes Architect: CSG http://www.abbeylanehomes.com/

    Location: Old site of Sidetrack Cafe on 104th Avenue

    Number of floors: 6

    URL: http://www.virtualtourcanada.com/~ab...ian_living.htm


    http://img153.imageshack.us/img153/6...p49f133um8.jpg

    http://members.shaw.ca/vincentwansin...s/Venetian.jpg




  3. The Zen - Under Construction

    Developer: BMC Developments Ltd

    Architect: GMH Architects Location: 112st and 102ave Number of floors: 6 URL: ?


    http://members.shaw.ca/vincentwansin...s/imperial.jpg

    http://members.shaw.ca/vincentwansin...erings/zen.jpg




  4. The Quarters - Rumored

    Developer:? Architect: ? Location: SWC of 109 street/ 105 ave (Present Kal-Tire site) Number of floors: Url?

    http://static.flickr.com/140/319666417_2178d84578.jpg




  5. SoHo in Cloverdale - Under Construction

    Developer: Time developments Architect: ? Location: Cloverdale Number of floors: 4

    http://members.shaw.ca/vincentwansin...s/Soho%202.jpg




  6. Center in the Park - Under Construction

    Developer: Christenson Developments Architect: ? Location: Sherwood Park - Sherwood Drive near County Hall Number of floors: 4?

    http://img256.imageshack.us/img256/8...theparkkd1.jpg

    http://www.cdlhomes.com/centreinthepark/image002LRG.jpg

    http://www.cdlhomes.com/centreinthepark/image007LRG.jpg

    http://www.cdlhomes.com/centreinthepark/image008LRG.jpg




  7. Greystone - Proposed

    Developer: ? Architect: Kasian Location: 98ave 113st Number of floors: ? URL: ?

    http://www.dc5ab.com/forums/uploads/...1162859188.jpg




  8. Meridian - Proposed

    Developer: ? Architect: ? Location: 111st north of jasper ave Number of floors: 10 URL: ?

    http://www.dc5ab.com/forums/uploads/...1162929580.jpg




  9. M-TRAC - Proposed

    Developer: ? Architect: ? Location: 105 Ave East of 116st Number of floors: 5 URL: ?

    http://img259.imageshack.us/img259/1...38aa6a3ug7.jpg




  10. Trinity Pointe - Approved

    Developer: Time developments Architect: ? Location: whyte and 87st ish Number of floors: ? URL: [/url]

    http://www.dc5ab.com/forums/uploads/...1162854011.jpg




  11. 97street "arts lofts"Under Construction

    Developer: Architect: ? Location: 97st 101ave Number of floors: 3 URL: ? Picture: ?




  12. King Street on the ParkApproved

    Developer: Renoir Architect: ? Location: King Street, Spruce Grove Number of floors: 8

    http://img412.imageshack.us/img412/2...theparkpn1.jpg




  13. The Knoll Building Condo Conversion (Morris Lofts) - Under Construction

    Developer: ? Architect: ? Location: East side of 104 Street, North of Jasper Avenue Number of floors: 4 URL: ?


    http://members.shaw.ca/vincentwansin...gs/Wig%201.JPG




  14. Former Shirley Potters - Under Construction

    Developer: ? Architect: Gregory McClung Location: Northside of 102 Avenue between 106 and 107 Street

    Number of floors: 4 URL: ?


    http://i75.photobucket.com/albums/i3...wrendering.jpg

    http://i75.photobucket.com/albums/i3...ain78/knol.jpg




  15. Element lofts - Under Construction

    Developer: Time developments Architect: ?

    Location: 99st 82ave Number of floors: 4URL:


    http://img170.imageshack.us/img170/4...ntloftsge5.jpg




  16. Lessard House - Under Construction

    Developer: WAM Development Group

    Architect: Kasian Location: Number of floors: ? URL: ?


    http://img246.imageshack.us/img246/1...372626eoc2.jpg




  17. Rossdale Green - Proposed

    Developer: Communitas Architect: ? Location: 105st 96ave Number of floors: ? URL: ? Picture: ?




  18. Corner 1 Towers - Proposed

    Developer: BMC Developments Ltd Architect: ? Location: jasper ave 95st Number of floors: 22 URL: ? Picture: ?




  19. Roundhouse - Proposed

    Developer: Christenson Developments Architect: ? Location: 105ave 112st Number of floors: ? URL: ?

    http://www.cdlhomes.com/roundhouse/imageLRG.jpg




  20. The Neo - Proposed

    Developer: BMC Developments Ltd GMH Architects Location: 105ave 115st Number of floors: ? AURL: ?

    Picture: ?





  21. Gates on 17th - Under Construction

    Developer: Tessco Architect: Tessco Location: 117st and 105/106ave Number of floors: 4 URL: ?

    http://img411.imageshack.us/img411/2...ing3245nm1.jpg





  22. Edge - Proposed

    Developer: Time developments Architect: ? Location: Oliver area (117street) Number of floors:

    URL: ?

    Picture: ?





  23. Essence Proposed

    Developer: Time developments Architect: ? Location: south of jasper around 112 street Number of floors: URL: ?

    Picture: ?








EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION



University of Alberta
  1. University of Alberta Faculty of Science (CCIS) - Under Construction

    Developer: ? Architect: ? Location: University

    http://img149.imageshack.us/img149/8847/cciswd2.jpg




  2. University of Alberta Downtown - Former Bay Building - Under Construction

    Developer: U of A Architect: Landlord work: Stantec, other labs by Cohos-evamy, BJAL and others. Location: Jasper Avenue between 103rd and 104th Street Number of floors: 4

    http://i151.photobucket.com/albums/s...t/IMGP0259.jpg

    http://i75.photobucket.com/albums/i3...n78/uofbay.jpg




  3. University of Alberta Phys Ed Addition - Rejected - Voted down by Student Union

    Developer: ? Architect: BJAL Location: ? Number of floors: ? URL: ?

    http://img441.imageshack.us/img441/7...erext11fi4.jpg




  4. University of Alberta Health Research Innovation Facility Under Construction

    - Nearly Complete

    Developer: ? Architect: ONPA with HFKS Location: 89 Ave 112 Street and 114 Street (NE of U of A Hospital) Number of floors: 7-8

    http://img459.imageshack.us/img459/7954/hrif21ux9.jpg




  5. Edmonton Clinic - Proposed

    Developer: ? Architect: ? Location: W of 114street West of U of A Hospital Number of floors: ? URL: ?

    http://img266.imageshack.us/img266/1...clinic1qa6.jpg

    http://img177.imageshack.us/img177/5...nclinicnb7.jpg





    Northern Alberta Institute of Technology
  6. NAIT Ralph Klein campus - Proposed

    Developer: ? Architect: ? Location: S of Ellersiele Rd, E of QEII Number of floors: ? URL: ?

    http://img110.imageshack.us/img110/7...d200611wn9.jpg

    http://img110.imageshack.us/img110/8...d200611uo5.jpg




  7. NAIT Petro-Canada Centre for Millwright Technology Under Construction

    Developer: ? Architect: ? Location: ? Number of floors: ? URL: ?




  8. NAIT Center for Buisness - Proposed

    Developer: ? Architect: ? Location: ? Number of floors: ?

    http://img274.imageshack.us/img274/3...uisnessva4.jpg







    Grant MacEwan College
  9. GMCC Robbins Health Center - Under Construction

    Developer: MacEwan College, ARchitect: Kasian, Floors: 5 Location: Corner of 109th Street, 104th Avenue

    URL: http://www.gmcc.ab.ca/web/services/i...20Feb%2006.pdf


    http://members.shaw.ca/vincentwansin...obbins%202.JPG

    http://img337.imageshack.us/img337/6...70f16bfkh8.jpg




  10. Grant MacEwan Arts Centre - Proposed

    Developer: ? Architect: ?Location: 104ave 111st Number of floors: ? URL: ?

    Picture: ?






    OTHER COLLEGES
  11. Norquest College - 3 buildings Proposed

    Developer: ? Architect: Cohos-evamy Location: 103 ave 107/108st Number of floors: ? URL: ?

    http://members.shaw.ca/vincentwansin...rquest%202.JPG

    http://members.shaw.ca/vincentwansin...rquest%201.JPG

    http://img164.imageshack.us/img164/5889/norquestpg2.jpg




  12. Concordia College - Hole Academic Centre - Under Construction

    Developer: ? Architect: Janusz Najfeldt Location: Highlands Campus, at 7128 Ada Blvd Number of floors: 4

    http://concordia.ab.ca/hac/images/render_006.jpg

    http://concordia.ab.ca/hac/images/render_07.jpg





    MEDICAL FACITILIES
  13. University Hospital - Mazankowski Heart Institute - Under Construction

    Developer: ? Architect: Architect: Stantec Location: SE Corner of UofA Hospital on 112 St and 87 Ave Number of floors: ?

    Construction Update

    http://www.engineering.ualberta.ca/i...tInstitute.jpg

    http://www.albertaheartinstitute.ca/...esentation.jpg

    http://www.albertaheartinstitute.ca/...alJuly2006.jpg




  14. Royal Alex Hospital - Lois Hole Expansion (Center for Women) - Under Construction

    Developer: ? Architect: Cohos-evamy Location: Royal Alex Hospital Number of floors: 9 URL: ?

    http://img82.imageshack.us/img82/311...ccee8d8io9.jpg




  15. Royal Alexander Hospital New Orthopedic Clinic - Proposed

    Developer: ? Architect: ? Location: ? Number of floors: ? URL: ?

    http://members.shaw.ca/vincentwansin...20Alex%201.jpg







    RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES




  16. Art Gallery of Alberta Proposed

    Developer: ? Architect: Randall Stout, HIP Location: 99st 103ave Number of floors:4

    http://www.stoutarc.com/Projects/Slideshows/EAG4.jpg

    http://www.stoutarc.com/Projects/Slideshows/EAG6.jpg




  17. Ukrainian Canadian Archives & Museum of Alberta (UCAMA) Proposed

    Developer: ? Architect: HIP Location: Jasper ave 96st Number of floors: ?

    http://www.kalynacountry.com/untitled1.jpg




  18. Royal Alberta Museum Renovations - Proposed

    Developer: ? Architect: Cohos-evamy Location: ? Number of floors:? URL:?

    http://www.joconl.com/images/archive.../11/27/150.jpg

    http://img165.imageshack.us/img165/6...e226dd7gd7.jpg

    http://img165.imageshack.us/img165/6...02croppjf4.jpg

    http://img170.imageshack.us/img170/2...ropped2bc7.jpg




  19. Northlands AgriCom Expansion - Proposed

    $150M,

    Developer: ? Architect: Cohos-evamy Location: ? Number of floors:?URL:?




  20. YMCA Don Wheatons - Downtown - Under Construction

    Developer: ? Architect: Barr Ryder Location: 102 Ave 102 St and 103 St Number of floors: 3 URL: ?

    http://www.edmonton.ymca.ca/images/h...donwheaton.jpg

    http://i151.photobucket.com/albums/s...t/IMGP0233.jpg







Edmonton Transportation Infrastructure Construction



Edmonton LRT Construction



http://img393.imageshack.us/img393/3...turelrtkp4.jpg



South LRT (SLRT)

The extension will occur over three phases.

Phase 1: Health Science Station Opened January 2006

Phase 2: Health Sciences Station to South Campus Station opens by the end of 2008

Phase 3: South Campus Station to Century Park opens by the end of 2009


http://img137.imageshack.us/img137/6533/map1cv2.gif





Health Science Station - Opened Jan 2006

http://img403.imageshack.us/img403/2...a7571f6jq9.jpg





Belgravia/Mckernan (76 Ave) Station - Late 2008?

http://img393.imageshack.us/img393/4269/76aveiu9.jpg





Neil Crawford Station (UofA South Campus) - Late 2008

http://img401.imageshack.us/img401/9...hcampuspg4.jpg





Southgate Station - Late 2009

http://img141.imageshack.us/img141/3...gatelrtcs1.jpg





Whitemud LRT Bridge

http://img117.imageshack.us/img117/6...tbridgeuc8.jpg





Century Park Station - Late 2009

http://img131.imageshack.us/img131/4...0d4cc8dhg7.jpg



West LRT (WLRT)



3 Different possible routes exist

1. Lewis Estate to Health Scienceshttp://img519.imageshack.us/img519/3...ffd287fhy1.png

2. Lewis Estate to South Campushttp://img519.imageshack.us/img519/3...ffd287fhy1.png

3. Lewis Estate to Downtownhttp://img519.imageshack.us/img519/3...ffd287fhy1.png






North LRT (NLRT)http://img519.imageshack.us/img519/3...ffd287fhy1.png

http://img441.imageshack.us/img441/6...endlrtnxp7.jpg






South East BRT

http://www.edmonton.ca/RoadsTraffic/...%20options.pdfhttp://img519.imageshack.us/img519/3...ffd287fhy1.png

http://www.edmonton.ca/RoadsTraffic/...%20options.pdfhttp://img519.imageshack.us/img519/3...ffd287fhy1.png








Edmonton Freeway/Major Road Construction



Anthony Henday Drive

http://img176.imageshack.us/img176/2866/ahdmapzx8.jpg



Anthony Henday SW

The southwest component of Anthony Henday Drive opened in fall 2006.

http://www.infratrans.gov.ab.ca/INFT...2006update.pdfhttp://img519.imageshack.us/img519/3...ffd287fhy1.png

Photos: http://www.infratrans.gov.ab.ca/INFT...2006Photos.htm

http://www.infratrans.gov.ab.ca/INFT...tusNov2005.pdfhttp://img519.imageshack.us/img519/3...ffd287fhy1.png




Anthony Henday Drive SE

Scheduled to open in Fall 2007

http://www.accessroadsedmonton.ca/

http://img144.imageshack.us/img144/9...ysedj51pn0.jpg






156 Street / Yellowhead Interchange - Completed and Fully Open

Spring 2007 will see final overlay finished.



23 Ave and Gateway Blvd - Proposed

Construction to start late fall 2007?

http://www.23ave-interchange.com/images/camera_9.jpg

http://img338.imageshack.us/img338/396/23avebwb5.jpg






Anthony Henday NE - Proposed

2011 for start and beyond. Maybe 2015 before completion



Anthony Henday NW

Part of the NW portion from Yellowhead to 137 avenue / West Regional Road opened.

2011 for start and beyond. Maybe 2015 before completion of the rest of this section




Edmonton Ports



GreyHound / VIA Rail Hub

Developer: ? Architect: O'Neill O'Neill Procinsky Architects Location: 121 Street and Yellowhead Trail at current Via Rail Station Number of floors: URL:

http://members.shaw.ca/vincentwansin...yhound%201.jpg

http://members.shaw.ca/vincentwansin...yhound%202.jpg

http://members.shaw.ca/vincentwansin...yhound%203.jpg



Removed Airport Information, and put in thread header of new YEG - Edmonton International Airport thread

big W Mar 18, 2006 11:37 PM

I cant wait to see all of them up in the city and with the ball rolling the projects keep getting bigger and better.

Boris2k7 Mar 18, 2006 11:41 PM

I personally think that the best projects in Edmonton are the ones on campus, not the ones downtown.

Coldrsx Mar 19, 2006 10:03 PM

^yes and no...there is a mix of good and bad throughout.

Boris2k7 Mar 19, 2006 10:14 PM

Well, I was in Edmonton several times in the last few months and nothing downtown really stood out for me, although some of the new condos are nice. I stayed on campus a few weeks ago and was very impressed by the new developments going up at the university.

Some of the upcoming projects like Icon may change my mind.

Coldrsx Mar 19, 2006 10:18 PM

Quote:

Originally Posted by Boris550
Well, I was in Edmonton several times in the last few months and nothing downtown really stood out for me, although some of the new condos are nice. I stayed on campus a few weeks ago and was very impressed by the new developments going up at the university.

Some of the upcoming projects like Icon may change my mind.


the shift of downtown project quality is coming...

Hootch May 21, 2006 4:22 PM

I think the Icon is already under construction. I drove by the site yesterday and it's fenced off.

Coldrsx May 24, 2006 11:57 PM

^indeed...i saw it today.

GO ICON GO

GO OILERS GO

big W Jan 12, 2007 4:03 PM

Feepa update this thread.

feepa Jan 12, 2007 4:12 PM

Hopefully this gets updated today by ColdRSX

Coldrsx Jan 18, 2007 7:27 PM

updated

feepa Jan 18, 2007 7:28 PM

Ahh - Cold has updated this thread! Thanks Cold! Appreciate it. Hope it wasn't any trouble getting my template in here.

James Bond Agent 007 Jan 20, 2007 4:59 AM

All I can say is . . . wow.

Coldrsx Jan 25, 2007 8:02 PM

time to add these babies...

http://i75.photobucket.com/albums/i3...78/TheHood.jpg

http://www.emporis.com/files/transfe.../01/513265.jpg

big W Jan 26, 2007 6:47 AM

The more the merrier with more buildings coming to a lot near you.

Austinlee Jan 26, 2007 7:22 AM

That is an AMAZING collection of new buildings and highrises for a city of this size.. I am soo envious of urban Canada sometimes, when I see your mid-sized cities having way more urban expansion and development than some of our US cities of a much larger metro population.

Coldrsx Jan 26, 2007 5:23 PM

Quote:

Originally Posted by PA Pride (Post 2590656)
That is an AMAZING collection of new buildings and highrises for a city of this size.. I am soo envious of urban Canada sometimes, when I see your mid-sized cities having way more urban expansion and development than some of our US cities of a much larger metro population.

very true...given the size of Edmonton (720,000/1,001,000 CMA) it does have A LOT going on, but far from enough and quality needs a big bump.

big W Jan 27, 2007 7:05 AM

2 new 24 storey towers anounced. Awating pictures now.

Coldrsx Feb 6, 2007 6:03 AM

Aurora updated with this:

http://www.bzka.com/images/projects/78/2.jpg

Q updated with this:

http://www.bzka.com/images/projects/79/6.jpg

CMD UW Feb 8, 2007 12:19 AM

/\ Sweet, thanks Cold. Although some of the projects you posted have been completed ~ Celebrations, River Cree, etc.


All times are GMT. The time now is 1:34 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.