Construction on the Bookends phase 2 is to begin in May of 2007 from what I have heard. Also, they have put up that black plastic stuff that is like trash bag material and is held up by like a 3-foot tall fence or so around the Peacock Hotel and Spa site to keep dirt from running into the road when it rains. They have also added more construction equipment to the site like bulldozers and backhoes, so digging of the site should begin in the next week or two I would think.