View Single Post
  #2027  
Old Posted Apr 13, 2013, 10:22 PM
Dakota Dakota is offline
Registered User
 
Join Date: Mar 2013
Posts: 44
Quote:
Originally Posted by btimmis1 View Post
I was at Intercity Mall today and noticed two things;
Firstly, the renovation of the old Zellers into the new Target is proceeding somewhat slower than I would have expected, I have no idea about the interior but the exterior still has a long way to go and there wasn't anyone working on it this afternoon. This surprises me given that many (most?) locations in southern Ontario are already open.
Secondly, inside the mall I noticed three empty retail units, at least two of which were a fairly good size. I haven't walked all the way through the mall for awhile, but I don't recall there being this many empty previously, and with no signs indicating something was coming soon.
The inside of Target is progressing almost on schedule . It was an entire gut job . Workers are already putting up the shelfs. The exterior ( brick ) will be getting a make over as well . The June opening is still on !
Reply With Quote