View Single Post
  #3255  
Old Posted Sep 15, 2014, 2:45 AM
hat hat is offline
Registered User
 
Join Date: Sep 2013
Posts: 381
Quote:
Originally Posted by urbanlife View Post
I would like to see the WES upgraded to another light rail line instead of what is currently is so that it could be hooked in with the current light rail system and run downtown. I never understood making a suburb to suburb line be another type of train rather than a light rail train.
WES is not cost effective. According to this, it may have something to do with the cost of operating on a freight line. I don't know if getting rid of WES and running MAX trains on this would still incur similar cost just because of ROW. Still, I would love to see MAX trains running on this line to Portland as well (with a couple added stops).
Reply With Quote