View Single Post
  #58  
Old Posted May 22, 2023, 12:45 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 2,780
It's right there in the map...

The idea for the line as BRT initially is from after Transport 2050 was created.

Quote:
All other MTN corridors are assumed to be BRT, with the exception of:
(5) Metrotown-Park Royal: Explore options for a dedicated transit crossing across the Burrard Inlet

https://www.translink.ca/news/2022/a...0%20priorities


It's also clear in the press release:
Quote:
Immediately advance the required planning, engagement, and design work to confirm the best alignment, technology, grade separation, terminus locations and phasing for a rapid transit connection between Metrotown and Park Royal via the Second Narrows corridor to be implemented in the latter half of the plan, while delivering better bus service in the short term
https://www.translink.ca/news/2022/a...0%20priorities
Reply With Quote