Thread: Rapid Transit
View Single Post
  #1797  
Old Posted Aug 10, 2012, 3:54 PM
markbarbera markbarbera is offline
Registered User
 
Join Date: May 2007
Location: Hamilton
Posts: 3,050
I believe spur line options 1a and 1b go along Wentworth.

If this is to be the maintenance yard, I would prefer to see the spur track run west from the site parallel to the CN track to James North and pick up the main LRT track there.

I really think the first phase of LRT should be a hybrid A-Line/B-Line LRT route that (at the bare minimum) has a route from James and Murray north to Gore Park, then west out to McMaster. This would link the James North GO station to the HSR's downtown terminal and follows the route with a population density most likely to prove LRT's sustainability. BRT can run on dedicated bus lanes along the rest of the currently existing A-Line and B-Line routes. Future phases can then expand the B-Line LRT eastward to Eastgate Square and the A-Line south to Mohawk College and the airport, with the new track following the same path as the dedicated bus lanes put down in the first phase.
__________________
"A government that robs Peter to pay Paul can always depend on the support of Paul"
-George Bernard Shaw
Reply With Quote