I walked most of the line on Friday. Some things of note:
- The multi-use path along 104 St. is mostly complete
- Landscaping along most roadways is complete
- Sidewalks around Kingsway station are close to completion and look great!
- They were testing the gates at 111 Ave.
- The majority of catenary wires have been installed
(Testing the gates)