View Single Post
  #33  
Old Posted Feb 21, 2007, 6:13 PM
AltinD's Avatar
AltinD AltinD is offline
Registered User
 
Join Date: Sep 2006
Location: DUBAI
Posts: 479
BTW, alot of the underground tunels will be build using the cut-and-cover technique. Boring will be used only where the first method isn't possible, such when it passes under the Dubai Creek or when the tracks pass under a very dense aerea with no wide enough roads, to cut to.

However still the majority of the route will be on elevated tracks.
Reply With Quote