View Single Post
  #65  
Old Posted Aug 15, 2017, 9:17 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,067
A second site plan application was filed Monday. The first site plan was for demo and utility work. This one is for the office tower. (No tower details yet)

https://abc.austintexas.gov/web/perm...ertyrsn=549050
__________________
Follow The ATX on X:
https://twitter.com/TheATX1

Things will be great when you're downtown.

Last edited by The ATX; Aug 18, 2017 at 5:02 AM. Reason: Added correct link
Reply With Quote