For Los Angeles:
If the Gold Line Foothill/Montclair Extension is on this list, the Purple Line Extension Phase 2 deserves to be on the list.
The Gold Line extension has only awarded a utility relocation contract thus far and has not awarded the actual design-build contract for the line:
http://www.foothillgoldline.org/imag...g_Ceremony.pdf
Quote:
The first three years of construction will be used to relocate strategic utilities, conduct pre-construction activities, hire a design-build contractor and finalize the project design. Major construction will begin in 2020 and consist of two construction phases: (1) relocating/rebuilding the freight/Metrolink systems and (2) building the Gold Line light rail system. Substantial completion is anticipated in 2026.
|
Purple Line Extension Phase 2 has already awarded the design-build contract and has already started utility relocations.
January 2017 notice on utility relocations:
https://www.metro.net/projects/notic...line2_071017A/
Notice to Proceed for Phase 2 contractor:
http://thesource.metro.net/2017/04/2...ine-extension/