View Single Post
  #423  
Old Posted Jan 14, 2014, 8:47 PM
daveyc daveyc is offline
Registered User
 
Join Date: Jan 2014
Posts: 1
Quote:
Originally Posted by waterloowarrior View Post
another major retail project beside the
Based on the shape of the lot, I'm assuming access will be provided via the Campeau drive connection from Huntmar to Terry Fox. Does anyone have any dates as to when they are planning on making this connection?
Reply With Quote