View Single Post
  #1065  
Old Posted Jan 6, 2018, 9:45 PM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 467
A 3-day pour cycle is pretty common for an average size flat floor plate (say 10k sf - 15k sf) with either table (like OGP) or traditional framing techniques (like Essex and Marlowe). This has been pretty consistent since the last boom in the early 2000's. If floor plates get larger like the 22k sf plate at Block 37, or if they have complicated geometry like Aqua or 465 N Park, or if they have parking ramps, then the cycle time is increased for the added complexity.