Quote:
Originally Posted by Aroundtheworld
Apparently up since the last revised estimates. It sounded like it was enough that it might lead to the projects being re-evaluated.
|
There is nothing to re-evaluate for the Broadway Subway. That would only make it even more expensive again in the long run.
On the other hand, there is A LOT to re-evaluate on the Surrey LRT.
So the Surrey LRT better not hijack the Broadway Subway from starting construction.