View Single Post
  #1100  
Old Posted Mar 7, 2018, 2:17 AM
SaskE30 SaskE30 is offline
Registered User
 
Join Date: Oct 2014
Posts: 181
Window wall installation has begun on the west side of the condo tower. (I didn't take a picture because I was on my bike today) I wonder how they plan to insulate the edges of the floor slabs to lessen the effects of thermal bridging.
Reply With Quote