View Single Post
  #1883  
Old Posted Nov 7, 2016, 12:34 AM
dragonsky dragonsky is offline
Registered User
 
Join Date: Sep 2005
Posts: 3,132
Quote:





Oceanaire Development Begins Construction in Long Beach

According to Longbeachize, work began last week for the seven-story building, which will rise from a vacant lot near the busy intersection of Ocean and Pine Avenues. When completed, the seven-story building will feature 216 studio, one-, two- and three-bedroom units, in addition to a pool terrace, a fitness center and a clubhouse.

Renderings of the project, which is being designed by architecture firm Togawa Smith Martin, highlight a large north-south portal which provides views of the Long Beach shore. The building will front Oean Boulevard with with multipurpose green space, as well as performance space and an art gallery.

Longbeachize has reported that the project will proceed under a 20-month construction schedule, placing a completion date in 2020.
http://urbanize.la/post/oceanaire-de...ion-long-beach
Reply With Quote