Quote:
Originally Posted by City Wide
Not that it matters in the whole course of events, but why have at least one of the poles in the middle of the slab, fall away from the edges.
Strange that none of the photos show any one actually connected to the poles, even the ones somewhat close to the edge.
Unless these poles are attached to something on the floor under the one actually being worked on, that would mean that the poles aren't attached to anything other then the form work, 3/4" plywood, which doesn't seem like that big of a support.
|
These Union folk are pretty anal about their safety measures - often both the GC and the Union will have safety inspectors on site. I will dig up some shots of them using the safety harnesses and fall prevention, when working below grade on the foundation mat.