View Single Post
  #82  
Old Posted Feb 24, 2015, 12:13 AM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
Topped out and no curtain wall installed yet.
This boom is much different than the last one almost a decade ago, where the glass and facades were installed at the same pace as the floors. 399 Fremont still has no glass either. I wonder why that is?