View Single Post
  #30  
Old Posted Aug 18, 2017, 4:57 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,928
I'm really glad that this is being considered seriously for a city barely under 300k!

I hope to see that most of it will be grade-separated when the designs are proposed. And from the looks of it, it will be. And hopefully the construction of this process will not be a drawn out and done in the most painful way possible, as they did it in Winnipeg.
Reply With Quote