BROADWAY STATION REDESIGN
The planned Broadway Station renovations can be summarized as follows:
1) Station entrance on Broadway
- Remove existing 2 coiling grilles,
- Remove elevator,
- Relocate eletrical riser next to new elevator
- Install 2 new coiling grilles,
- Create a CRU
2) Centre stairs
- Reduce the width of the stairs, and install a new escalator
3) Centre of the station
- Accommodate the exist from Safeway and provide connection between Safeway and Station fire alarm systems
- Extend the concourse space by enclosing the currently exterior space to the south of the station
- Extend the concourse space by replacing west wall by glazing,
- Create 2 CRU's
4) South of the Station
- Remove existing emergency stairs,
- Create new stairs,
- Install a new elevator,
- Install 2 new coiling grilles.
5) General improvements
- improved lighting,
- improved signage/wayfinding,
- new flooring,
- replacing metal mesh screens with glass panels.
6) Other
- expanded passarelle between Broadway and Commercial Drive Stations
- expanded entry to Commercial Drive Station from Commercial Drive
- integration of adjacent paved area and implementation of customer amenities.
7) Cost
- $25 million
New South Entrance
Concourse level
Platform level