THSRC (Service)
Taipei-Kaohsiung, 2007
345 km
8 stations
39 km Mined Tunnels
8 km of Cut and Cover Tunnels
251 km of Viaducts and Bridges
31 km Cut and Fill Embankments
Rolling Stock: T700 - Kawasaki, Nippon Sharyo, Hitachi
photo: THSRC
Taipei Nangang Station, THSRC/TRA/MRT, 2011
------------------------------------------------------------------------
TRA Express (Service)
TEMU 1000 "Taroko", Taipei-Hualien, 2007
Rolling Stock: Hitachi
photo: ITC
---------------------------------------------------------------------
TRA Rapid Transit (Service)
Rolling Stock: EMU 700 - TRSC / Nippon Sharyo
photo: ITC
Yilan Line, 2007
Hsinchu MRT (Construction)
TRA/THSR, Lioujia Line, 2010
11.28 km
4 stations
http://www.erieb.gov.tw/eg4e.htm
Tainan MRT (Construction)
TRA/THSR, Salun Line, 2010
6.4 km
2 stations
http://www.erieb.gov.tw/eg5e.htm
Hengchun Line (Planning)
36 km
6 stations
--------------------------------------------------------------------------------------
Taoyuan MRT (Construction)
Taipei/Taoyuan Airport Express, 2013 (Construction)
51 km
21 stations
Rolling Stock: Kawasaki
http://www.mrt.tpc.gov.tw/web66/_fil...9537/map1b.jpg
--------------------------------------------------------------------------
Taipei MRT Projects
Light Metro (Construction)
Rolling Stock: Bombardier
Brown Line - Neihu Extension, 2010
14.8 km
12 stations
-----------------------------------------------------------------------------------
Orbital Line, 2014 (Planning)
15.4 km
14 stations
http://www.mrt.tpc.gov.tw
------------------------------------------------------------------------------
Maglev (Planning)
Rolling Stock: HSST
Xinyi - Songshan Line
4.5 km
8 stations
http://www.espoirtransit.com.tw/index.php
-----------------------------------------------------------------------------------
Keelung LRT (Tram) (Planning)
Keelung TRA Station - Maritime Museum Line
7.6 km
------------------------------------------------------------------------------------------
Heavy Metro (Construction)
Rolling Stock: Kawasaki
Orange Line, 2013
19.7 km
16 stations
Orange Line - Luzhou Extension, 2010
6.4 km
5 stations
Green Line - Songshan Extension, 2012
8.5 km
8 stations
Blue Line - Nangang Extension, 2008
2.5 km
2 stations
Red Line - Xinyi Extension, 2012
6.4 km
5 stations
------------------------------------------------------------------------------
Kaohsiung MRT (Construction)
Rolling Stock: Siemens
Red Line, 2009
28.3 km
24 stations
Orange Line, 2009
14.4 km
14 stations
------------------------------------------------------------------------------
Taichung MRT (Planning)
Green Line, 2014
16.5 km
15 stations
-------------------------------------------------------------------------------
TRA Western Line Reconstruction (Construction)
Taipei Nangang Extension Project, 2011
19.4 km tunnel/elevated rail line
Kaohsiung Underground Railway Project, 2016
9.75 km rail tunnel
Taichung Elevated Railway Project, 2015
21.19 km viaduct