Quote:
Originally Posted by BuildThemTaller
Does that mean that the floor for 45 was poured? A separate question is if the core is the official topping out point?
|
I've been involved in this project for 3 years and I still get confused.
Level 45 is the 47th level above Grand Ave. The roof over the core is the 57th level.