View Single Post
  #34  
Old Posted Nov 16, 2009, 5:24 PM
ttownfeen ttownfeen is offline
Registered User
 
Join Date: Aug 2006
Location: By the Mounds
Posts: 398
Quote:
Originally Posted by Alabadrock View Post
US 82 Btwn Tuscaloosa and Mississippi

On my way to Starkville yesterday for the Alabama/Miss State game I got a chance to see how the widening project is going. So far, they've got a divided road most of the way to Gordo. Both sides aren't in use, but they've got most of the construction done, seems like they've just got some paving left to do most of the way.
They have to replace all the bridges on the old carriageway (the new carriageway is being used for both directions for now) on the 3 mile stretch over the Sipsey River valley.

There is no funding to widen US 82 from the Tuscaloosa county line to Reform at this time.

U.S. 82 widening project to end in 2010
Reply With Quote