Maybe this is the reason for the Demo delay. According to this permit filed last week the city meter at 721 Congress needs to be disconnected before Demo, but 719 Congress also uses the same city meter. So another meter needs to be installed at 719 Congress before the 721 Congress meter can be disconnected. C'mon guys, lets get this done already.
https://abc.austintexas.gov/web/perm...ertyrsn=624950