Quote:
Originally Posted by JoelS1
Late yesterday afternoon I came over the bridge from Kensington towards downtown, and as I got onto the southside river pathway an older guy on a bike passing by looked at me and muttered "25 million for that POS", and just carried on his way along by the river.
Personally I like the bridge, but they really need to get on and finish the landscaping at both ends.
|
Its amazing how many people dont know why the bridge ended up as it was designed. You really have to take the time to explain to people all of the site constraints before they finally understand what kind of engineering went into this thing.
I converted someone just the other day and they accept it. A little education goes a long way.