^^ If you would read what's been posted above, you would see that the project was purchased by Turnberry in October with plans to redesign the interior in a more upscale mode. It is extraordinarily unlikely that that could or would have been done to the point that construction would get underway in 2 months. Such things are likely to take at least 6 months and then probably require some consultation with the Planning Department and other city bureaucrats even though the exterior design is not supposed to change. I look for construction to begin possibly by the end of 2007 but not much before that.