Correct on the 1st question. Even though steel is being delivered one column at a time right now, the bulk of it for the infrastructure WILL start arriving sometime between year's end and early next year.

And that IS when we'll see the base start to rise above the street level.

Yes, the slurry wall (bathtub) IS being put in on the east side as we speak. Looks like the red crane was moved over to that side.

Later this summer, we should see the core start to rise more. Though when 7 WTC was being erected, no one could see the core rising.