Quote:
Originally Posted by Dan in Chicago
Also the development is planned in 3 phases, with completion of the West Tower (BKL, residential) in 2014, the South Tower (tallest) in 2018, and the East Tower in 2020.
|
If there's as silver lining, this is it. The best of the three towers is going up first, and there are four years or so before construction starts on Pelli's contribution. I'm hopeful that there will be design revisions.