Thanks for making the thread.
Quote:
Originally Posted by Changing City
The article doesn't mention HOV, and it doesn't say how transit might be configured. The Minister is quoted as saying about the existing bridge: "it’s not currently configured to allow us to have rapid transit uses on that bridge. So, we’re interested in looking at that."
It could be SkyTrain on or under a new bridge. It could be dedicated BRT lanes. What it won't be is a tunnel and "there’s not yet a timeline for the project" so it's likely to be a while. But before anything to Maple Ridge.
|
IIRC there's about 25-ish years left for the IWMB, so TransLink may very well decide to just let it stay there until then and build a separate SkyBridge for the train.