View Single Post
  #2840  
Old Posted Nov 15, 2017, 5:03 PM
PillowTalk4 PillowTalk4 is offline
Registered User
 
Join Date: Oct 2010
Location: Greater Wasshington, DC
Posts: 402
Quote:
Originally Posted by MidTenn1 View Post
Here you go. I don't know what you mean by topped out. The Marriot Tri brand and the JW Marriot are 'topped out' but a long ways from being finished.



I would expect two 40 story buildings, a 32, 30, 21 and a 19 story buildings to begin within the next 6 months.
What are the two 40 story buildings you anticipate starting in the next 6 months? Are you referring to the announced project for 1st Ave South near the Shelby pedestrian bridge?
Reply With Quote