Not according to the ChicagoLoopBridges site, courtesy of our city's resident bridge fanatics. Apparently this project is pretty far along.

The rehab is estimated to begin this fall; the city has an RFP out for the engineering.



It would be great to eventually get a signature modern bridge downtown... but it will probably be the pedestrian bridge at McClurg. There are also new bridges planned for Taylor and Polk, which are also opportunities for high-end design. All of those bridges need to be moveable.
That's a lot more than the usual sandblasting + new coat of paint/patch repairs. A lot of that work is going to require substantial closure time and line cuts to the Brown/Purple lines.