Quote:
Originally Posted by TVurban
An article showed up in the paper today about this project. Looks like they have reassessed the project. I'm not sure where the statesman found the rendering. A quick run through of the past permits, don't show anything new since last March 2017. There is a new permit up but only has a parcel document on it currently.
http://pdsonline.cityofboise.org/pds...id=CVA18-00026
|
I found the additional pud modification permit. Though, it doesn't matter anymore since they withdrew it today. I think that this means they are going back to the original approved design?? I'm not sure they'd do this since the first permit was uploaded by a different architecture firm than the second one...
http://pdsonline.cityofboise.org/pds...id=PUD18-00013
New/withdrawn Design:
Original Design: