Quote:
Originally Posted by Rail Claimore
If worse becomes worst, they can lengthen existing runways 9L, 4L, from around 7000 ft to over 10,000 ft if capacity for big jets is an issue. 14R is already big enough to accomodate the biggest planes in existence at 13,000X200 ft. I think the current 9L-27R runway that's under delay will get built, but what comes after that is iffy.
The whole plan will depend on the west terminal and perimeter taxiways (see past experience in places like DFW and ATL), and right now those are far enough off that its hard to say with certainty they will get built.

A couple lengthened runways and one new runway thats a few miles from the terminal alone will do very little to improve operations at O'hare without the other stuff, especially at the price it will cost.

If they don't get cracking (and cracking bensenville/elk grove skulls if necessary), this will be a boondoggle.