Thread: Regina Retail
View Single Post
  #563  
Old Posted Feb 17, 2018, 3:19 AM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is offline
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,241
Quote:
Originally Posted by Draftsman View Post
I had a peek in the door of the H&M store today. The permanent lighting has been working for several days, painting is done, mirrors are placed on columns, signage is in place for the elevator. (I must say, it is very bright inside). It appears that the construction work is very close to being complete, and then it will be turned over for the tenant improvements. All that needs to be done (from my quick view) is the floor grate in the outside entrance vestibule needs to be installed and an air vent cover above said vestibule needs to be installed. It's looking great!
H&M signage?
Reply With Quote