Quote:
Originally Posted by ed21x
they're constructing a subway station under it, as well as facilities to check in luggage, etc. perhaps a lot of things have already been happening underground?
|
They are constructing underground structure, includes A1 station of MRT Airport line, besement, tunnel connect Taipei Main Station and A1 station.
The forecast show that it will finish at 2011 for C1 and 2012. (from official document I can find)